Questions_Set_10.doc

DOC document 23 KB Posted

Attached to
Demolition of Housing Units
Solicitation number
W912GY16T0028
Issued by

View the file

Other files

File Type Posted
Question_and_Answer__12.doc DOC document
PLM_Report_DEMO_Housing_Units.pdf PDF
180B_Drywall_ _knockdown_mud.pdf PDF
180B_Joint_mud_1000_Pt_ct.pdf PDF
Drywall_Test_Outcome.doc DOC document
Amendment_W912GY-16-T-0028-0003.pdf PDF
Questions_and_Answers_Set_11.doc DOC document
Amendment_W912GY-16-T0028-0002.pdf PDF
Asbestos_Test_Drywall_ _Knock_down_mud_Housing_units.pdf PDF
Questions_and_Answers_Set_8.doc DOC document
Question_and_Answer_Set_8.doc DOC document
Questions_and_Answers_Set_7.doc DOC document
Amendment_W912GY-16-T-0028-0001.pdf PDF
Questions_and_Answers_Set_6.doc DOC document
Questions_and_Answers_Set_5.doc DOC document
Questions_and_Answers_Set_4.doc DOC document
Question_and_Answer_Set_3.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Housing_Demo_Locations_-_2016-04-26.pdf PDF
Questions_and_Answers_Set_2.doc DOC document
Concrete_pad.JPG JPG image
Single_unit_2.JPG JPG image
1_Garage_1_Shed.JPG JPG image
Carport.JPG JPG image
Wood_Fence.JPG JPG image
Duplex_2.JPG JPG image
Single_unit.JPG JPG image
Duplex.JPG JPG image
Back_of_duplex.JPG JPG image
Demolition_Housing_Questions_and_Answers.doc DOC document
Asbestos_survey_Bldg_187.pdf PDF
Floor_Plan_Garage_319.pdf PDF
Floor_Plan_Garage_015-019.pdf PDF
Floor_Plan_Garage_20.pdf PDF
Floor_Plan_187.pdf PDF
Contractor_Manpower_Report_User_Guide_Contractor.pdf PDF
Asbestos_survey_of_Housing_Bldgs_to_be_Demolished.pdf PDF
W912GY-16-T-0028.pdf PDF
Floor_Plan_3_BED.pdf PDF
Floor_Plan_Single_unit.pdf PDF
Floor_Plan_4_BED.pdf PDF
Fireplace_Foundation_Details_Single_unit.pdf PDF
Floor_Plan_25.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Set 10

1. The asbestos survey provided shows two sets of information. One from IT survey and the other from Corps Survey. Which one is to be used for purposes of putting together our bid for asbestos abatement?

ANSWER Use Section 3.0 of the same verification survey which clearly shows what asbestos is remaining AFTER an abatement project was completed.

2. The answers were stating that the samples show non detect. What the samples showed was asbestos less than 1 % which by OSHA standards is not

"non detect". We are assuming that we can demolish the buildings with less than 1% asbestos intact but the demolition must be done by a DOSH registered demolition contractor. This is dictated by regulations.

ANSWER: The only quantities shall be from the plans that have been submitted. The Contractor does not have to be a DOSH contractor. The Contractor must be a state certified asbestos removal contractor. Any state asbestos removal license that is current and valid is acceptable.

File details come from the government source that posted it. Updated .