Questions_and_Answers_Set_8.doc

DOC document 26 KB Posted

Attached to
Demolition of Housing Units
Solicitation number
W912GY16T0028
Issued by

View the file

Other files

File Type Posted
Question_and_Answer__12.doc DOC document
PLM_Report_DEMO_Housing_Units.pdf PDF
180B_Drywall_ _knockdown_mud.pdf PDF
180B_Joint_mud_1000_Pt_ct.pdf PDF
Drywall_Test_Outcome.doc DOC document
Amendment_W912GY-16-T-0028-0003.pdf PDF
Questions_and_Answers_Set_11.doc DOC document
Questions_Set_10.doc DOC document
Amendment_W912GY-16-T0028-0002.pdf PDF
Asbestos_Test_Drywall_ _Knock_down_mud_Housing_units.pdf PDF
Question_and_Answer_Set_8.doc DOC document
Questions_and_Answers_Set_7.doc DOC document
Amendment_W912GY-16-T-0028-0001.pdf PDF
Questions_and_Answers_Set_6.doc DOC document
Questions_and_Answers_Set_5.doc DOC document
Questions_and_Answers_Set_4.doc DOC document
Question_and_Answer_Set_3.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Housing_Demo_Locations_-_2016-04-26.pdf PDF
Questions_and_Answers_Set_2.doc DOC document
Concrete_pad.JPG JPG image
Single_unit_2.JPG JPG image
1_Garage_1_Shed.JPG JPG image
Carport.JPG JPG image
Wood_Fence.JPG JPG image
Duplex_2.JPG JPG image
Single_unit.JPG JPG image
Duplex.JPG JPG image
Back_of_duplex.JPG JPG image
Demolition_Housing_Questions_and_Answers.doc DOC document
Asbestos_survey_Bldg_187.pdf PDF
Floor_Plan_Garage_319.pdf PDF
Floor_Plan_Garage_015-019.pdf PDF
Floor_Plan_Garage_20.pdf PDF
Floor_Plan_187.pdf PDF
Contractor_Manpower_Report_User_Guide_Contractor.pdf PDF
Asbestos_survey_of_Housing_Bldgs_to_be_Demolished.pdf PDF
W912GY-16-T-0028.pdf PDF
Floor_Plan_3_BED.pdf PDF
Floor_Plan_Single_unit.pdf PDF
Floor_Plan_4_BED.pdf PDF
Fireplace_Foundation_Details_Single_unit.pdf PDF
Floor_Plan_25.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 8

Project: Demolition of Housing Units

Question:

1) According to your survey and viewing the sampling report, specifically the samples for Drywall. The sample method seems to be a “composite sample” which includes all layers of material in the samples (paint, texture, joint compound, drywall etc.) that was tested as one sample. According to Federal regulations if a composite sample come back with a reading of <1% you MUST treat that entire sampling field as “Asbestos Containing Material” and abate the entire area as “Friable Asbestos”. Because the sample did not come back as “None Detected” the entire area to be abated as such.

Therefore, Your specs call for removing the sheetrock and disposing of it as construction debris is a violation of the federal regulations and I ask you to revise the spec to show that all sheetrock must abated and disposed of as “Friable asbestos” according to all Federal, State regulations.

So my question is: In light of samples, Do we have to abate all the sheetrock in the units as Friable ACM?

ANSWER: The attached asbestos test shows no asbestos - NONE DETECTED, in the drywall and knock down mud on the surface of the drywall. Since the drywall joint mud makes up less than 1% of the wall, the entire wall can be disposed of as construction debris.

2) Will the government provided EPA Approved containers for the ACM Sheetrock that will be abated?

ANSWER: Sheetrock shall not be abated.

3) Will the government cover all Transportation and Landfill costs?

ANSWER: The Contractor will cover the transportation and landfill cost of disposing of construction debris. The Government will provide containers, and will remove them, for the asbestos to be abated that has already been identified in earlier questions.

4) Will the government provided 3rd party air monitoring during the abatement process? Or must we include that cost in our bid?

ANSWER: ) Contractor is responsible for all required submittals/notifications, abatement monitoring and clearance tests.

5) Does the government require a CIH on the project?

ANSWER: The Government requires a certified individual who can complete air monitoring and give clearance authorization.

6) Will the government submit the 10 day notification to the State or will that be the responsibility of the 3rd party? or contractor?

ANSWER: See answer #4.