ATT 9 FORMAT FOR CALCULATION OF SELF PERFORMED WORK.docx

DOCX document 21 KB Posted

Attached to
DRAFT: Munitions Storage Area, Powidz, Poland Federal contract opportunity
Solicitation number
W912GB25R0011
Issued by
Department of the Army European Command

About this file

This is a calculation template (Attachment 9) that provides a standardized format for contractors to calculate and document their self-performed work percentage. The form requires contractors to describe the work they will self-perform and provide a detailed calculation breaking down the total bid price by subtracting design costs, G&A, overhead, markups, and other indirect costs to determine the percentage of work to be self-performed by the prime contractor's own employees.

The document includes specific definitions of "self-performed work," which includes work done by the prime contractor's own employees using their owned/rented equipment, materials purchased and installed by prime's forces, associated labor, and job overhead costs. It explicitly excludes markups for profit, G&A overhead, bonds, owner-operated equipment, and any work or materials handled by subcontractors. The form requires certification by an authorized company representative regarding the accuracy of the information provided.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT: Munitions Storage Area, Powidz, Poland, newest first.
File Type Posted
B.08.02 DRAFT Solicitation 25R0011.pdf PDF
ATT 10 PIEE INSTRUCTIONS FOR PROPOSAL SUBMITTAL.pdf PDF
ATT 3 PAST PERFORMANCE EVAL QUESTIONNAIRE.DOCX DOCX document
ATT 12 POLAND VALUE ADDED TAX PROCEDURES.docx DOCX document
ATT 2 PAST PERFORMANCE INFORMATION SHEET.docx DOCX document
ATT 5 SAMPLE COMMITMENT_TEAMINGPARTNER LETTER.docx DOCX document
ATT 1 PAST PERFORMANCE OVERVIEW SHEET.docx DOCX document
ATT 6 BANK LETTER OF ASSURANCE TEMPLATE.docx DOCX document
ATT 4 PROJNET INSTRUCTIONS.pdf PDF
ATT 7 BANK LETTER OF GUARANTY TEMPLATE.docx DOCX document
Site Visit Sign-In.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 9 - CALCULATION OF SELF-PERFORMED WORK

Use the following format to identify and calculate cost of the work to be self-performed. Various definitions which may be helpful in completing this form can be found on page 2, below.

A. Clearly describe the work to be self-performed: ___________________________________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________

B. Show Calculation of Self-Performed Work:

B.1
Total bid price:
$
B.2
Subtract contractually-required design costs, if any:
$
B.3
Subtract G&A, home office overhead, prime contractor's markups for profit, bond, DBA insurance, etc.:
$
B.4
Total amount of work to be performed under the contract:
$
B.5
Work to be self-performed (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor's own employees; only those materials which will be both purchased and installed by the prime's own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor's own employees; and the contractor's own job overhead costs.):
$
B.6
% Self-performed work = Line B.5/ Line B.4 X 100% = %
%

I certify that the above information is current, accurate and complete to the best of my knowledge and that I have the authority to provide the information requested on this form.

__________________________________________
DATENAME
POSITION, COMPANY

The following are definitions concerning self-performance of work by the Prime Contractor, in accordance with Section 00800, “PERFORMANCE OF WORK BY THE CONTRACTOR.”

"Self-performance of work", "On the site" and "Total amount of work to be performed under the contract" are defined below.

“Self-performance of work” generally includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor's own (not subcontract) employees; only those materials which will be both purchased and installed by the prime's own (not subcontract) forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor's own employees; and the contractor's own job overhead costs.

The following is NOT self-performed work for purposes of the clause: Prime contractor markups for profit, general and administrative overhead, bonds, or other indirect costs on self-performed or subcontracted work; "Owner-operated equipment", rental of plant or equipment for operation by subcontractors; purchase of materials for installation by subcontractors.

"On the site" includes the construction site(s) as well as off-site fabrication plant or other facilities necessary to manufacture assemblies or provide materials to be incorporated into the construction project.

“Total amount of work to be performed under the contract" is comprised of all direct (variable, fixed, one-time and semi-variable) costs to the contractor, including jobsite overhead costs, to construct the project. It generally includes all self-performed work, as defined above, and cost of all supplies, materials and subcontracts. It does not include design costs, home or branch office overhead costs or prime contractor markups for bond, profit, etc.”

File details come from the government source that posted it. Updated .