ATT 2 PAST PERFORMANCE INFORMATION SHEET.docx
DOCX document 34 KB Posted
- Attached to
- DRAFT: Munitions Storage Area, Powidz, Poland Federal contract opportunity
- Solicitation number
- W912GB25R0011
- Issued by
- Department of the Army European Command
About this file
This is a Past Performance Information Sheet template (Attachment 2) for contractors to provide details on up to 3 relevant projects for the Munitions Storage Area project in Powidz, Poland. The form requires contractors to detail completed projects within the last 10 years, including location, completion date, final cost, completion percentage, and customer information.
The template specifically seeks experience in: vertical construction with pre-cast concrete elements (particularly ammunition/munition bunkers), rail facility construction, new facility construction projects over $50M including major architectural/engineering disciplines, projects within the EU (preferably Poland), work for U.S. military/DoD/NATO members, USACE projects, and ammunition/munition bunker construction. Contractors must specify their role as Prime Contractor (self-performing 25%+ of work), Subcontractor, Joint Venture partner, or Key Subcontractor, with additional explanation required for non-Prime roles. Key Subcontractors must provide a signed commitment letter to receive credit for past experience.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 DRAFT Solicitation 25R0011.pdf | ||
| ATT 6 BANK LETTER OF ASSURANCE TEMPLATE.docx | DOCX document | |
| ATT 10 PIEE INSTRUCTIONS FOR PROPOSAL SUBMITTAL.pdf | ||
| ATT 3 PAST PERFORMANCE EVAL QUESTIONNAIRE.DOCX | DOCX document | |
| ATT 12 POLAND VALUE ADDED TAX PROCEDURES.docx | DOCX document | |
| ATT 9 FORMAT FOR CALCULATION OF SELF PERFORMED WORK.docx | DOCX document | |
| ATT 5 SAMPLE COMMITMENT_TEAMINGPARTNER LETTER.docx | DOCX document | |
| ATT 1 PAST PERFORMANCE OVERVIEW SHEET.docx | DOCX document | |
| ATT 4 PROJNET INSTRUCTIONS.pdf | ||
| ATT 7 BANK LETTER OF GUARANTY TEMPLATE.docx | DOCX document | |
| Site Visit Sign-In.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
Munitions Storage Area (MSA) project in Powidz, Poland
PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Total of 3 projects, more than 3 will not be evaluated Project Name and Location (City/Military Installation, State, Country):
Past Experience:
1. The location work was performed: ___________________________________
2. The day, month, and year work was completed; must be completed within last ten (10) from the solicitation issue date: _______________
3. The final cost of this project: €/$_________________________
4. Is this project more than 75% complete by the date of this solicitation? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Who was the customer/end user of the project? _________________________
6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories:
a. Vertical Construction involving major pre-cast concrete elements - Additional consideration may be provided for construction of ammunition or munition bunkers;
b. Construction of rail facilities (specifically railheads and tracks);
c. Construction projects for new facilities which include all major architectural and engineering disciplines with a construction cost of at least $50,000,000;
d. Construction projects performed within the European Union with projects performed in Poland may be considered more relevant than those located elsewhere; and/or
e. Construction projects for the U.S. military, U.S. Department of Defense or the military or Ministry of Defense of a NATO member nation, or projects for or funded by NATO;
f. Construction projects performed in support of USACE;
g. Construction of ammunition or munition bunkers.
(Continue typing if required to provide more information)
PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that self-performed at least 25% of the work and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.
7. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.