Price_and_Payment_Procedures_-_Romania_Explosive_Apron_Solicitation.pdf
PDF 56 KB Posted
- Solicitation number
- W912GB19R0028
About this file
Price and Payment Procedures 01 22 00
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00 Page 1
Explosive Cargo load Unload Apron in Mihail Kogalniceanu Air Base, Romania
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
12/18
PART 1 GENERAL
1.1 COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10)
1.2 LIQUIDATED DAMAGES—CONSTRUCTION (52.211-12)
1.3 SINGLE JOB PAYMENT ITEMS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00 Page 2
PRICE AND PAYMENT PROCEDURES
11/18
PART 1 GENERAL
COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10)
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 850 calendar days after the date the contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
LIQUIDATED DAMAGES—CONSTRUCTION (52.211-12)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of €1,616.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BID SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for design and for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.
1.3.1 Base Bid Item 0001: Fixed Wing Parking Apron (Including Taxiway F)
1.3.1.1 Payment
Payment will be made for costs associated with the construction of a parking apron and Taxiway F. The apron must accommodate three (3) C-17 aircraft simultaneously and allow aircraft to taxi in and taxi out under their own power. Aircraft will access the parking apron from parallel Taxiway F. Aircraft will taxi out to parallel Taxiway F heading south and turn onto Taxiway G to gain access to the runway. Tie-downs in the parking apron must be provided to allow simultaneous mooring of two C-17 aircraft and simultaneous mooring of two CH-47 rotary wing aircraft and
SECTION 01 22 00 Page 3 the maximum number of UH-60 aircraft as feasible. Location of moorings must assume fixed wing and rotary wing aircraft will be occupying the parking apron at different times.
1.3.1.2 Unit of Measure: job.
1.3.2 Base Bid Item 0002: Fixed Wing Taxiway (Explosive Cargo Connection / Taxiway H)
1.3.2.1 Payment
Payment will be made for costs associated with the construction of Taxiway H. Contractor must design and construct an access taxiway (Taxiway H) to the semicircular explosive load unload apron that accommodates parking for one C-17 aircraft. The new ladder taxiway connecting the existing runway to the new explosive cargo load/unload apron and Taxiway F must be known as Taxiway H.
1.3.2.2 Unit of Measure: job.
1.3.3 Base Bid Item 0003: Blast Exhaust Deflector
1.3.3.1 Payment
Payment will be made for costs associated with the construction of a blast exhaust deflector. Jet blast deflection must be provided on the west edge of the parking apron to protect the adjacent railhead project.
The D-B must provide appropriate cover treatment to eliminate the effects of jet blast erosion.
1.3.3.2 Unit of Measure: job.
1.3.4 Base Bid 0004: Cable Vault (Airfield Lighting)
1.3.4.1 Payment
Payment will be made for costs associated with the construction of a new vault to house electrical distribution equipment, panels, transformers, CCRs, and control equipment required for the work.
1.3.4.2 Unit of Measure: job.
1.3.5 Base Bid 0005: Explosive Cargo Apron
1.3.5.1 Payment
Payment will be made for costs associated with the construction of an explosive cargo load unload apron that must accommodate a single C-17 aircraft and will allow the aircraft to taxi in and taxi out under its own power. Aircraft will access the apron from proposed ladder Taxiway H. Aircraft will taxi out from this apron eastward along Taxiway H to parallel Taxiway F, turn south onto Taxiway F and turn onto the proposed parking apron or head further south to Taxiway G. Mooring points will be provided to accommodate a single C-17, a single UH-60, and single CH-47 rotary wing aircraft using the apron at different times.
1.3.5.2 Unit of Measure: job.
1.3.6 Base Bid 0006: Fixed Wing Taxiway (Taxiway G)
1.3.6.1 Payment
Payment will be made for costs associated with the construction of a new taxiway located parallel to and south of Taxiway E connecting to Taxiway
SECTION 01 22 00 Page 4
F must be known as Taxiway G.
1.3.6.2 Unit of Measure: job.
1.3.7 Base Bid 0007: Redundant Power
1.3.7.1 Payment
Payment will be made for costs associated with the construction of power sources connected to substation PT14, located north of the existing runway, has been identified as the Base Bid power source for the proposed airfield lighting and signage, which must be under the control of the civilian air traffic control tower.
1.3.7.2 Unit of Measure: job.
1.3.8 Base Bid 0008: Information Systems (Communications Utilities)
1.3.8.1 Payment
Payment will be made for costs associated with the construction of two non-secure communications conduits 125mm (4.92 inches) in diameter from the civilian airport connection point to the new Electrical Vault/Building with polypropylene pull strings.
1.3.8.2 Unit of Measure: job.
1.3.9 Base Bid 0009: Electric Service (Including Upgrades to
Existing Civilian Airport Power Transformer PT-13)
1.3.9.1 Payment
Payment will be made for costs associated with the connection to existing electrical service at the site. This includes upgrades to the power transformer PT-13.
1.3.9.2 Unit of Measure: job.
1.3.10 Base Bid 0010: Water, Sewer, Gas
1.3.10.1 Payment
Payment will be made for costs associated with the construction of any required drainage facilities to maintain existing drainage patterns and systems in accordance with Host Nation Government regulations, unless otherwise specified.
1.3.10.2 Unit of Measure: job.
1.3.11 Base Bid 0011: Paving, Walks, Curbs, and Gutters (Access Roads)
1.3.11.1 Payment
Payment will be made for costs associated with the construction of access roads A and B. Roads A and B will connect the explosive cargo load/unload apron to the future MK-1 fuel storage facility and existing local access road, respectively.
1.3.11.2 Unit of Measure: job.
1.3.12 Base Bid 0012: Site Improvements (Including Earthwork, Stormwater / LID)
1.3.12.1 Payment
SECTION 01 22 00 Page 5
Payment will be made for costs associated with the work necessary to complete site improvements, including, but not limited to earthwork, stormwater, seeding, erosion control, etc.
1.3.12.2 Unit of Measure: job.
1.3.13 Base Bid 0013: Demolition
1.3.13.1 Payment
Payment will be made for costs associated with the demolition of Earthen berms, bunkers, buildings, and debris piles that lie within the project footprint and within required clear zones must be removed and hauled off site in compliance with Romanian Government rules and regulations as part of the scope of work for this project. Note that demolition must not commence prior to issuance of an Urbanism Certificate and Demolition Permit by the Romanian Government (See Section 3.0 Permits and Approvals).
1.3.13.2 Unit of Measure: job.
1.3.14 Base Bid 0014: Design and Analysis of CLIN 0001 Through 0013
1.3.14.1 Payment
Payment will be made for costs associated with the design and anlysis of
CLIN 0001 – CLIN 0013.
1.3.14.2 Unit of Measure: job.
1.3.15 Bid Option 0001: Design and Construct Power Connection and Extension from Off-site Existing Transformer as Described in RFP
1.3.15.1 Payment
Payment will be made for costs associated with using an alternative power source. If the future 2 MW substation is not available, the D-B Contractor must provide power from the existing transformer located along the service road east of the U.S. Marines Barracks.
The D-B Contractor must coordinate through the COR for this power source and calculate that the new total load with the loads added by this project do not exceed 80% of the full rating of the substation.
1.3.15.2 Unit of Measure: job.
1.3.16 Bid Option 0002: Design and Construct Water Connection and Extension from Existing Off-site Water Supply as Described in RFP
1.3.16.1 Payment
Payment will be made for costs associated with using an alternative water supply. If the Base Bid water source is not available, the D-B Contractor must connect to the water supply serving the future Ready Building at the adjacent MK-1 project.
1.3.16.2 Unit of Measure: job.
1.3.17 Bid Option 0003: Design and Construct Water Connection and Extension from Future Adjacent Building as Described in RFP
1.3.17.1 Payment
Payment will be made for costs associated with using an alternative water supply. If the Base Bid and Additive Bid Item 3 water sources are
SECTION 01 22 00 Page 6 not available, the D-B Contractor must connect to a hydrant at the existing water supply system serving the military installation located west of the airport discussed in Section 4.8.1.
1.3.17.2 Unit of Measure: job.
1.3.18 Bid Option 0004: Design and Construct On-site Stormwater Management Facility as Described in RFP
1.3.18.1 Payment
Payment will be made for costs associated with using an alternative stormwater management area. If the future pond serving the future MK-1 drainage system is not available to receive proposed stormwater runoff, the D-B must connect all proposed stormwater drainage systems to a proposed stormwater management practice to be located in the northwest corner of the project, within the MKAB property boundaries, that is compliant with BASH requirements. Acceptable practices include but are not limited to a sand filter basin.
1.3.18.2 Unit of Measure: job.
1.3.19 Bid Option 0005: Design and Construct Access Road C as Described in RFP
1.3.19.1 Payment
Payment will be made for costs associated with the construction of access road C.
1.3.19.2 Unit of Measure: job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
| PART 1 GENERAL |
| 1.1 COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) |
| 1.2 LIQUIDATED DAMAGES—CONSTRUCTION (52.211-12) |
| 1.3 SINGLE JOB PAYMENT ITEMS |
| 1.3.1 Base Bid Item 0001: Fixed Wing Parking Apron (Including Taxiway F) |
| 1.3.1.1 Payment |
| 1.3.1.2 Unit of Measure: job. |
| 1.3.2 Base Bid Item 0002: Fixed Wing Taxiway (Explosive Cargo Connection / Taxiway H) |
| 1.3.2.1 Payment |
| 1.3.2.2 Unit of Measure: job. |
| 1.3.3 Base Bid Item 0003: Blast Exhaust Deflector |
| 1.3.3.1 Payment |
| 1.3.3.2 Unit of Measure: job. |
| 1.3.4 Base Bid 0004: Cable Vault (Airfield Lighting) |
| 1.3.4.1 Payment |
| 1.3.4.2 Unit of Measure: job. |
| 1.3.5 Base Bid 0005: Explosive Cargo Apron |
| 1.3.5.1 Payment |
| 1.3.5.2 Unit of Measure: job. |
| 1.3.6 Base Bid 0006: Fixed Wing Taxiway (Taxiway G) |
| 1.3.6.1 Payment |
| 1.3.6.2 Unit of Measure: job. |
| 1.3.7 Base Bid 0007: Redundant Power |
| 1.3.7.1 Payment |
| 1.3.7.2 Unit of Measure: job. |
| 1.3.8 Base Bid 0008: Information Systems (Communications Utilities) |
| 1.3.8.1 Payment |
| 1.3.8.2 Unit of Measure: job. |
| 1.3.9 Base Bid 0009: Electric Service (Including Upgrades to Existing Civilian Airport Power Transformer PT-13) |
| 1.3.9.1 Payment |
| 1.3.9.2 Unit of Measure: job. |
| 1.3.10 Base Bid 0010: Water, Sewer, Gas |
| 1.3.10.1 Payment |
| 1.3.10.2 Unit of Measure: job. |
| 1.3.11 Base Bid 0011: Paving, Walks, Curbs, and Gutters (Access Roads) |
| 1.3.11.1 Payment |
| 1.3.11.2 Unit of Measure: job. |
| 1.3.12 Base Bid 0012: Site Improvements (Including Earthwork, Stormwater / LID) |
| 1.3.12.1 Payment |
| 1.3.12.2 Unit of Measure: job. |
| 1.3.13 Base Bid 0013: Demolition |
| 1.3.13.1 Payment |
| 1.3.13.2 Unit of Measure: job. |
| 1.3.14 Base Bid 0014: Design and Analysis of CLIN 0001 Through 0013 |
| 1.3.14.1 Payment |
| 1.3.14.2 Unit of Measure: job. |
| 1.3.15 Bid Option 0001: Design and Construct Power Connection and Extension from Off-site Existing Transformer as Described in RFP |
| 1.3.15.1 Payment |
| 1.3.15.2 Unit of Measure: job. |
| 1.3.16 Bid Option 0002: Design and Construct Water Connection and Extension from Existing Off-site Water Supply as Described in RFP |
| 1.3.16.1 Payment |
| 1.3.16.2 Unit of Measure: job. |
| 1.3.17 Bid Option 0003: Design and Construct Water Connection and Extension from Future Adjacent Building as Described in RFP |
| 1.3.17.1 Payment |
| 1.3.17.2 Unit of Measure: job. |
| 1.3.18 Bid Option 0004: Design and Construct On-site Stormwater Management Facility as Described in RFP |
| 1.3.18.1 Payment |
| 1.3.18.2 Unit of Measure: job. |
| 1.3.19 Bid Option 0005: Design and Construct Access Road C as Described in RFP |
| 1.3.19.1 Payment |
| 1.3.19.2 Unit of Measure: job. |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it.