This document outlines a federal contract opportunity for construction services in Turkey. The U.S. Army Corps of Engineers Europe District seeks to award an indefinite-delivery, indefinite-quantity job order contract with a maximum value of $10 million over a five-year period. The contract will be used to support sustainment, restoration, and modernization projects requiring general building renovation, road and pavement repair, and environmental work. A pre-proposal conference will be held and proposals are due in mid-November 2018, with an anticipated award date at the end of January 2019. The contract will utilize fixed-price task orders linked to the 2016 Europe Unit Price Book and have a minimum value of €2,000 and maximum value of €1,250,000 per task order. This unrestricted full and open competition is waived for small business set-aside requirements due to its overseas location in Turkey.

Attachment 4 Experience Overview Sheet Updated

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
A.07.23.04_Attach_4_ExpInfoSheet_Updated.docx DOCX document
A.07.23.03_Attach_3_ExpOverviewSheet_Updated.docx DOCX document
A.07.24.4_W912GB19R0001_AM04.pdf PDF
A.07.23.02_ATTACH_2_Preproposal_Conf_Attendee_Info_Sheet__FINAL_17_JUN_2019.xlsx XLSX spreadsheet
FINAL_FY19_Turkey_JOC_PPC_Slides_2019.06.17.ppt PPT presentation
A.07.24.3_W912GB19R0001-0003_Am_03_Correct_Attachments.pdf PDF
A.07.23.03_Attach_3_ExpOverviewSheet_Updated.docx DOCX document
A.07.24.2_W912GB19R0031-0002_Am_02_Finalize_PPC.pdf PDF
A.07.24.1_W912GB19R0031-0001_Am_01_Reschedule_PPC.pdf PDF
A.07.23.06_Attach_6_JOC_Pricing_Schedule_Turkey_2019.05.21.xlsx XLSX spreadsheet
A.07.23.10_Attach_10_UPB_Europe_2016.pdf PDF
A.07.23.03_Attach_3_ExpOverviewSheet.docx DOCX document
A.07.23_W912GB19R0001_FY19_Turkey_JOC.pdf PDF
A.07.23.05_Attach_5_PPQ.pdf PDF
A.07.23.04_Attach_4_ExpInfoSheet.docx DOCX document
A.07.23.07_ATTACH_7_BLA_Template.docx DOCX document
A.07.23.02_ATTACH_2_Preproposal_Conf_Attendee_Info_Sheet.xlsx XLSX spreadsheet
A.07.23.11_ATTACH_11_DIN_EU_Standard.pdf PDF
A.07.23.08_ATTACH_8_BLG_Template.docx DOCX document
A.07.23.01_Attach_1_Specifications_Binder.pdf PDF
A.07.23.09_ATTACH_9_Letter_of_Commitment.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

FY19 Turkey JOC

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:

Experience:

1. The location work was performed, work in Italy will be considered more relevant: ___________________________________

2. The day, month, and year work was completed; work must not be earlier than 2012: _______________

3. The final cost of this project, shall be between €2,000 and €1,000,000 (Projects that fall within the stated range are considered more relevant than those that do not): $_________________________

4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower

5. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:

1. Building renovations that include floors, doors, walls, windows, external facades, repairs to roofs;

1. Repair/replacement of major building systems such as electrical, mechanical, HVAC;

1. Civil work, that includes concrete/asphalt roads and pavements, earthwork, and drainage structures;

(Continue typing if required to provide more information)

ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.

7. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.

File details come from the government source that posted it. Updated .