This document contains details for a federal indefinite delivery, indefinite quantity job order contract opportunity in Turkey. The U.S. Army Corps of Engineers Europe District intends to award a single task order contract with a maximum value of $10 million to provide construction services such as building renovations, road and pavement repair, environmental work, and asbestos abatement at locations throughout Turkey. Interested offerors must be registered in SAM.gov and Federal Business Opportunities to access the solicitation when released on or around October 15th, 2018, with proposals due November 15th. The agency plans to make award by the end of January 2019. The contract would have a one-year base period and four one-year options, and task orders would range in value from €2,000 to €1,250,000. The opportunity is unrestricted and set-aside waivers apply due to the overseas location. Evaluation criteria will include experience, past performance, and management approach on a best value tradeoff basis.
A.07.23 W912GB19R0001 FY19 Turkey JOC
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
FY2018 Italy JOC
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed, work in Italy will be considered more relevant: ___________________________________
2. The day, month, and year work was completed; work must not be earlier than 2012: _______________
3. The final cost of this project, shall be between €2,000 and €1,000,000 (Projects that fall within the stated range are considered more relevant than those that do not): $_________________________
4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).
6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:
1. Building renovations that include floors, doors, walls, windows, external facades, repairs to roofs;
1. Repair/replacement of major building systems such as electrical, mechanical, HVAC;
1. Civil work, that includes concrete/asphalt roads and pavements, earthwork, and drainage structures;
(Continue typing if required to provide more information)
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.
7. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Key Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.