Hotel Loop Station
Phantom Housing
Fire Trainer
Temporary Facility Locations Required During Fire Station MILCON Construction
Building 115
Eight fire trucks: R-3, E-13, L-14, T-25, H-12, C-7, C-8, C-9.
Parking Structure Requirements:
Three 15 m x 15m temporary 3-sided structures; 4.5 meters high at eaves, and 6 meters clear height on the building interior.
Day Shift: 12 Crew, Night Shift: 11 Crew
Office Requirements: 16 each 6m x 3m containers. Toilets, showers, kitchen, break room/training room for 12 people, storage, alarms area, office space w/ 7 desks and computers.
Office/Sleeping Requirements:
Sleeping Quarters for 1 AC Ops.
Site Civil Improvements: 2300 m2 asphalt, 10 cm thick.
Temporary Facilities near Fire Training Area e7ppedmr Text Box e7ppedmr Text Box
12 Admin personnel w/ desk & PC’s.
FACC Alternate.
- One pumper truck
- 4 Support Vehicles: T-16, LP-1, Gator 1, Gator 2.
- 4 Support Equipment Trailers:
FP Trailer, Bauer trailer, Haz-mat trailer, foam trailer.
- Equipment: 1 stationary Bauer compressor.
Temporary Facilities Bldg 115
Parking Structure Requirements: One temporary 15m x 7.5m 3-sided structure.