Project Title: Fire Crash Center Project Location: Incirlik Air Base Turkey Solicitation Number: W912GB17R0045-0002 (Attachment 2)
EXPERIENCE INFORMATION SHEET
PROJECT NO. , Page 1 Must have a total of 3Offeror may submit up to five (5) projects, more than 3five (5) will not be evaluated; less than 3five (5) may result in a lower rating Project Name and Location:
Name of Firm that performed this work (should be the Offeror or one of the offeror’s subcontractors)
Name, email, phone and fax number of English speaking POC:
Experience:
1. The location work was performed: _______________________________________________________________
2. Date work was begun: ________________________ Date work was completed: ________________________
3. The final cost of this project: $________________________________________________________________
4. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
5. Provide detailed information of the work performed (refer to the categories under Evaluation of Factor 1 – Experience, Evaluation Criteria.). Projects must demonstrate design and construction experience in Turkey, and/or design and construction experience using U.S. standards. The experience shall not be limited to military-type projects. Same or similar projects performed in the country of Turkey are acceptable. 100% of resources shall be from the country of Turkey. Project examples that demonstrate experience working with proposed Key Subcontractors and/or the proposed JV Partners working together are considered more relevant. The projects need not be that of Design-Build construction but the Offeror must show levels of direct involvement with the Design of the product through Title II Services during construction. The prime contractorOfferor must have performed as the prime on alla minimum of three (3) projects. If the projects were executed by Joint Venture, then the offeror must show evidence of being in the Joint Venture. Offerors who do not meet this minimum requirement are not eligible for award. Projects considered relevant shall be completed within the last ten six (106) years from the date of the solicitation or at least 50% complete by the date of this solicitation; and all performed in Turkey, and between $5,000,000 and $15,000,000.
Include explanations of any performance problems, issues, or conflicts and the resolution. Offerors are encouraged to provide pictures or other descriptive information. Work in more than one category may receive a higher rating.:
(Continue typing or add additional sheet if required to provide more information)
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub-Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Committed Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Committed Subcontractor’s experience the project.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ____ Joint Venture ____ Committed Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Committed Subcontractor, explain how the work performed as a Committed Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
e. Ensure you provide a letter signed by both the Offeror and the Committed Subcontractor in order to take credit for the project work. Besides the signed letter, no additional information is required other than what is on Page 1 of this form.
Attachment (2) – Experience Information Sheet
File details come from the government source that posted it.