AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AIRFIELD FIRE/CRASH RESCUE STATION, INCIRLIK AIR BASE IN ADANA, TURKEY
(see continued)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 24
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Dec-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB17R0045
X 9B. DATED (SEE ITEM 11)
09-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Dec-2017
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
KONRAD ADENAUER RING 39
D-65187 WIESBADEN GERMANY
WIESBADEN 65187
W912GB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GB17R0045
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AM-0002
CHANGES TO THE SOLICITATION
a. REVISED ITEMS: The following is revised as indicated below:
i. Instructions/Proposal Submission (Section 00 21 00)
ii. Supplementary Instructions/Basis for Award (Section 00 22 00)
iii. Bid Bond Form/Bank Letter of Assurance/Bank Letter of Gurantee (Section 00 43 00)
iv. Conditions of the Contract (Section 00 70 00)
v. General Conditions (Section 00 72 00)
b. DELETED ITEM: The following is deleted from the solicitation:
i. Specification 00 73 16.04 (06/12) Special Conditions for Projects in Turkey
c. NEW ITEMS. The following is added to the solicitation:
i. Specification 00 73 16 (11/17) Special Conditions for Projects in Turkey
ii. Pre-Proposal Conference Slides (28 Nov 2017)
iii. Pre-Proposal Conference Attendee Sign-in Sheet
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 08-Dec-2017 10:00 AM to 08-Jan-2018 10:00 AM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
PROPOSAL SUBMISSION
A. PROPOSAL SUBMISSION (00 21 00)
1. INTRODUCTION: The Offeror’s proposal shall be submitted via AMRDEC. The solicitation shall provide AMRDEC instructions and receipt date for proposal submittal.
Offerors are cautioned that “parroting” of the Technical requirements or the PWS with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
2. PROPOSAL SUBMISSION REQUIREMENTS
vi. Attachments 1 and 2 (Experience Overview and Info Sheets)
The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of proposal details shall be the sole responsibility of the Offeror. The proposal shall meet the following basic requirements:
(a) The proposal shall be typed and submitted in English and easy to read.
(b) The proposal shall be organized, concise, and shall be clearly identified. Each factor shall be described in a separate section.
(c) The proposal shall be identified by the solicitation number, volume number, and name, address, and telephone number of the prime Offeror on the cover sheet.
(d) The proposal shall contain a table of contents and include at the bottom left side of each page the volume and page number.
(e) Offerors shall submit a signed Offer, Standard Form (SF) 1442 for this solicitation, including verification of all amendments received.
(f) Proposals shall completely and adequately address the requirements of this solicitation. Offerors are reminded that elaborate corporate marketing information, formatting, special reproduction techniques, etc., are not necessary.
(g) Contractors are cautioned against submitting conditional proposals.
(h) Failing to submit attachments or failing to complete the proposal properly may result in rejection of the offer without further evaluation. Therefore, Offerors are urged to follow instructions and speak with the Contracting Officer if instructions are not understood.
(i) Volume I: Offerors shall verify that the information for all forms submitted is current, correct, and complete including name(s) of the point(s) of contact (POCs), email address(es), and telephone number(s), for the technical factors.
(j) Volume II: The Pricing Schedule shall be completed in full.
Proposal Expenses and Pre-Contract Costs: The request for proposal (RFP) solicitation does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation.
3. JOINT VENTURE PROPOSAL
If submitting a proposal as a Joint Venture, the experience, and past performance, and management plan of each of the Joint Venture Partners can be submitted for the Joint Venture Entity. The experience for each Joint Venture Partner should be clearly described.
The proposal may receive a higher rating if the proposal contains evidence of the Joint Venture Entity working successfully together previously on relevant projects.
An Offeror that is part of a Joint Venture must submit a legally binding Joint Venture Agreement. The Government will not evaluate the capability of any Offerors that are not included in the Joint Venture agreement. Joint Ventures must include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the Joint Venture with the chief executive of each entity identified and must be translated into English, if the original agreement is in a language other than English.
If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Joint ventures shall submit the following additional documentation regarding their business entities:
(a) A copy of their joint venture agreement in English.
(b) A detailed statement outlining the following in terms of percentages, where appropriate:
1) The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing. The joint venture agreement must show that joint venture members are jointly and severally liable for any obligations under the contract.
2) The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the joint venture and perform the duties necessary to complete the work.
3) The structure of the joint venture and decision-ranking responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work.
4) The bonding responsibilities of the joint venture parties.
5) Identification of the key personnel having authority to legally bind the joint venture to subcontracts and state who will provide or contract for the labor and materials for the joint venture.
6) Identification of party maintaining the joint venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the joint venture.
7) Identification of party furnishing the facilities, such as office supplies and telephone service.
8) Identification of party having overall control of the joint venture. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties and identify the party, or hired as employees of the joint venture. Include this information as a part of Volume I.
9) A complete and legally binding document with all the information required under this section titled “Joint Ventures” shall be included. The JV agreement submitted to the Government shall be the only valid JV agreement for purposes of performance under this contract or any responsibilities of the JV under the contract. The JV agreement must state that the JV partners are jointly and severally liable.
Any changes to the JV agreement must be submitted to the Contracting Officer and is subject to approval by the Government prior to execution of the change.
4. KEY SUBCONTRACTORS
If an Offeror wishes to be credited with the experience of a Key Subcontractor a letter of commitment signed by the Key Subcontractor AND the prime contractor shall be submitted. The commitment letter shall be submitted even if the firm is in some way related to the prime contractor (for example, the Key Subcontractor is a subsidiary of the prime contractor, or a subsidiary of a firm to which the prime contractor is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered. Include this information as part of Volume I (See Solicitation Section 00 52 00 Agreements, for sample Letter of Commitment).
5. OFFEROR’S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
http://www.projnet.org/ProjNet
To submit and review bid inquiry items, bidders will need to be a current registered user or self- register into system.
The Solicitation Number is: W912GB17R0045
The Bidder Inquiry Key is: CCQZ4R-SZ9G46
The Project title is: (460348) W912GB17R0045 Airfield Fire/Crash Rescue Station.
The deadline to submit requests for information (RFIs) is 30 November 20 December 2017.
Specific Instructions for ProjNet Bid Inquiry Access:
a) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
b) Identify the Agency. This should be marked as USACE.
c) Key. Enter the Bidder Inquiry Key listed above.
d) Email. Enter the email address you would like to use for communication.
e) Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
f) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
g) Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
a) For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
b) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
c) Identify the Agency. This should be marked as USACE.
d) Key. Enter the Bidder Inquiry Key listed above.
e) Email. Enter the email address you used to register previously in ProjNet.
f) Select Continue. A page will then open asking you to enter the answer to your Secret Question.
g) Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
NOTES:
a) Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
b) Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
c) The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be 20
December 2017, but will officially be disabled five (5) days prior to the closing date stated in the solicitation. The Government reserves the right not to answer questions past the deadline; however, Nno Government responses will be entered into the ProjNet system within two (2) days prior to the closing date stated in the solicitation.
6. PROPOSAL FORMAT
Proposals shall be submitted in the following format:
Volume I: Non-Priced Factors Factor One (1) – Design and Construction Experience; Factor Two (2) – Past Performance; Factor Three (3) – Management Approach and, if applicable, shall include Letter(s) of Commitment and Joint Venture Agreement; and
Volume II: Priced Factor Factor Four (4) – Price.
7. The U.S. Army Aviation and Missile Research Development and Engineering Center Safe Access File Exchange (AMRDEC SAFE)
Proposals shall be submitted utilizing the AMRDEC SAFE Application, https://safe.amrdec.army.mil/safe. The AMRDEC SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to SAFE, and the application is available for use by anyone. Offerors shall include a digital copy of the Bank Letter of Assurance (BLA) with their proposal, to be submitted via AMRDEC SAFE.
a. The AMRDEC SAFE application can be accessed via https://safe.amrdec.army.mil/safe.
b. There are two options to proceed from the SAFE homepage:
o CAC Users o Non-CAC Users - Select this option if you do not have a CAC.
c. After selecting one of the options above, the page will be redirected to the package upload form. Fill in all the required input fields:
o Your Name - Your name;
o Your Email address - Your email address;
o Confirm Your Email Address - Re-enter your email address;
o Description of File(s) - Enter W912GB17R0045-COMPANY NAME:
o File(s) - Click the "Browse" button to select your file(s). You may add up to 25 files per package, so long as the total file size does not exceed 2GB;
d. File names shall be titled: W912GB17R0045-CompanyName
e. Deletion Date - Select the Maximum date for the package to be deleted from SAFE. The maximum (which is also the default) is two weeks (14 days) from date uploaded;
f. Provide a email addresses of the recipients of the files, and send to: andrew.e.gonzalez@usace.army.mil and candace.c.lotomau@usace.army.mil https://safe.amrdec.army.mil/safe/Welcome.aspx https://safe.amrdec.army.mil/safe/Welcome.aspx mailto:andrew.e.gonzalez@usace.army.mil mailto:candace.c.lotomau@usace.army.mil
g. Grant access to these people - This is the list of people you have granted access to the package. To remove a recipient, highlight their name and click the "Remove" button;
h. Caveats - Default is "None";
i. Notify me when files are downloaded - You (the sender) will receive a notification via email when a recipient downloads the package;
j. Require CAC for pickup - Require the recipient to be logged in with a valid US DoD-issued CAC to download the file(s). Recipients without a CAC will not be able to download the package.
k. Clicking the "Submit" button will upload the files and submit the package. Guest users will need to check their email to verify their email address before the recipients will be notified. No additional action is required by CAC users.
l. After the package has been uploaded (and verified, if proceeding as a guest), each recipient will receive a link to the package download page as well as a password. These passwords are unique for each recipient (not the package), and will be disabled once SAFE detects that the user successfully downloaded each file within the package.
Forwarding recipient and sender notification emails to anyone except the AMRDEC WEB Team is strictly forbidden.
Proposal submission shall be submitted via AMRDEC by the date and time indicated on the SF 1442, or as amended. No facsimiles or regular e-mail submissions of proposals, with the exception of Attachment Three (3), Past Performance Questionnaires, are permitted:
Proposal Receipt Confirmation Points of Contact:
E-mail: andrew.e.gonzalez@usace.army.mil Telephone: +49(0)611-9744-2582
E-mail: candace.c.lotomau@usace.army.mil Telephone: +49(0)611-9744-2819
Note: When the word ‘Offeror’ is encountered throughout this Section, it is intended to mean a company seeking to do business with the Government that submits a proposal in response to this solicitation. When the word “Government” is encountered throughout this Section, it is intended to mean U.S. Army Corps of Engineers.
FACTOR 1: EXPERIENCE
Submission Requirements:
Offerors shall submit two attachments, Attachment 1, Design and Construction Experience Overview Sheet and Attachment 2, Design and Construction Experience Information Sheet detailing previous work experience projects meeting the requirements of this solicitation including: .
(a) Projects demonstrate design and construction experience in Turkey, and/or design and construction experience using U.S. standards. The experience shall not be limited to military type projects. Same or similar projects performed in the country of Turkey are acceptable.
(b) Project examples that demonstrate experience working with proposed Key Subcontractors and/or the proposed JV Partners working together on Design-Build projects are considered more relevant.
(c) The Offeror must have performed on a minimum of three (3) projects. If the projects were executed by Joint Venture, then then offeror must show evidence of being in the Joint Venture. Offerors who do not meet this minimum requirement are not eligible for award.
(d) Projects with a cost of $5,000,000 to $15,000,000. Offerors may submit higher valued projects if there is a scope of work with a measurable performance period and measureable monetary value within a larger project that is relevant to this procurement. An example could be a single contract that includes separate facilities, or buildings, or phased construction with associated utilities improvements that shows relevant experience. Offerors shall clearly describe this project and how it related to the overall contract. Projects outside the relevant range may be considered less relevant. Smaller projects bundled into a larger project in order to meet this cost element are not considered relevant.
1. Information for completing Attachment 1 and Attachment 2:
(a) Offerors shall complete a Design and Construction Overview Sheet, Attachment 1, with a total listing not-to-exceed three (3)five (5) projects that best represent the Offeror’s work experience required on this solicitation. Projects must be performed within the last six (6) years from the date of this solicitation or currently being performed if at least 50% complete, as of the date of this solicitation. If more than three (3)five
(5) projects are submitted, only the first three (3)five (5) projects will be evaluated. If the project is older than six(6) years, it may be considered less relevant.
(b) Offerors shall provide a Design and Construction Experience Information Sheet, Attachment 2, for each project listed on Attachment 1, Design and Construction Experience Overview Sheet.
Offerors are encouraged to submit a combination of projects demonstrating design and construction experience in Turkey, and/or design and construction experience using U.S. standards, with as many relevant characteristics as possible.
(a) New Construction with associated utility and communication improvements and connections
(b) Design/Build construction projects
(c) Temporary buildings with associated utility and communication improvements and connections
(d) Environmental, to include permitting, hazardous waste removal and disposal, i.e., asbestos
(e) Demolition and site restoration
(f) Concrete and/or asphalt roads, pavements, airfield runway work;
2. If a Key Subcontractor’s experience is submitted for evaluation purposes, clearly address the experience with those Key Subcontractors. If a Joint Venture, clearly address the experience of each of the Joint Venture Partners and the relationship of the JV partners on any ongoing or previous projects. The proposal may receive a higher rating if the proposal contains evidence of the Joint Venture Entity or the Prime and Key subcontractor working successfully together on relevant previous projects.
NOTE: The Offeror must have performed as the Prime Contrator on alla minimum of three (3) projects submitted for experience. This aspect of Experience is a pass/fail element. In case of a Joint Venture, the work must have been performed by at least one of the JV partners. Offerors who do not meet this minimum requirement are not eligible for award.
FACTOR 2: PAST PERFORMANCE
Submission Requirements:
The Past Performance Questionnaire (PPQ), Attachment 3, included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 1, Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact.
Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 3), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, the contract specialist, Mr. Andrew Gonzalez at email andrew.e.gonzalez@usace.army.mil prior to proposal closing date.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.
mailto:andrew.e.gonzalez@usace.army.mil
However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may provide a completed Department of Defense, DD2626 form or a Contractor Performance Assessment Report (CPAR), in lieu of Attachment 3. CPARS evaluations and DD2626s shall state the projects are at least 50% complete.
Offerors may also include performance recognition documents received within the last six (6) years, such as awards, award fee determinations, customer letters of commendation, commercial and foreign government evaluations and any other forms of performance recognition.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, JV, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror, and the Government is under no obligation to check other sources.
FACTOR 3: MANAGEMENT APPROACH
Submission Requirements:
NOTE: Pages that exceed the required page limitations will not be evaluated.
The Offeror shall submit a graphical description (an organization chart) of its planned organization structure for successful execution of the contract. There is a limit of tenthirty (10 30) single spaced typed pages (A4 or letter size), using at a minimum a 12-point font. (Front and back equal two pages.) If more than tenthirty (1030) pages are submitted, only the first tenthirty (1030) pages will be reviewed and evaluated. The organization chart, resumes (if provided), and letters of commitment are not considered part of the tenthirty (1030) pages. The Management Approach shall include the following:
1. An organization chart (graph) that shows: a) lines of authority and communication for the execution of the contract; b) clearly shows the lines of authority of the Offeror’s Program Manager, Project Manager ,Site Superintendent, Quality Control Manager, Design Quality Control Manager and Safety Manager, c) the organization chart shall also include all JV Partners and Key Subcontractors, when applicable; and d) the chart shall identify all offices involved in this contract from the Offeror’s Headquarters to the Offeror’s site office(s), and how they are related; all positions shall be identified on the organization chart by title, organization, and physical location. The Project Manager, or the on-site person that communicates with the U.S. Government if the PM is not on-site, and any other personnel authorized to communicate directly with the U.S. Government shall be clearly identified.
2. A narrative description of the organization structure including roles, major responsibilities, and authorities of all JV Partners, Key Subcontractors, and key personnel (Program Manager, Project Manager, Site Superintendent, Quality Control Manager, Design Quality Control Manager, and Safety Manager) shall be described. The position titles used in the narrative must match those used in the organization chart.
2.3. A narrative that describes a reasonable and logical plan of managing the design; assuring design and materials meet US and Host Nation requirements; resolving differences in US and Host Nation standards and specifications;
roles, responsibilities and process in securing design, materials and permit approvals; managing the interaction between designers and construction personnel during the lifecycle of the project; managing the construction and demolition Host Nation approvals, sequencing and schedule; providing a satisfactory fire crash rescue station facility turnover to include operation and maintenance manuals, warranties, and training; and managing communication with USACE. Offerors are encouraged to become familiar with personnel requirements located in specification Sections 01 45 01 USACE Quality Control; 01 35 26 Health and Occupational Safety Requirements; and 00 73 15 General Conditions.
Volume II
FACTOR 4: PRICE
Submission Requirements
Offerors shall submit a completed Pricing as part of Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule. Failure to submit Pricing and failure to complete all CLIN Schedule items may result in the Offeror’s proposal package being rejected by the Government after initial evaluation without further consideration.
The price shall be in US Dollars.
Note: Offerors are advised that proposals shall be free of tax, in accordance with the Tax Relief Agreement between the United States of America and Turkey, dated 23 June 1954, DFARS 252.229-7001 Tax Relief (Sept 2014); and FAR 52.000-4074 Tax Relief (Foreign Countries Other Than Germany).
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
BASIS FOR AWARD
A. EVALUATION CRITERIA AND BASIS FOR AWARD (Section 00 22 00)
Subject to the provisions contained herein, the award will be made in accordance with Section 2305a of title 10, United States Code to one Offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR); whose proposal conforms to the solicitation requirements and judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation; and, represents the Best Value to the Government. This source selection approach, called Best-Value Tradeoff, includes an evaluation of four (4) factors:
Design and Construction Experience; Past Performance; Management Approach; and Price.
Experience contains a pass/fail element: the Offerors shall submit 3 up to five (5) projects that are equal to or similarsimilar in scope and complexity to the solicited project. Of these, a minimum of three (3) projects shall have been and that all were performed by the Offeror acting as the prime. In case of a Joint Venture, the work must have been performed by at least one of the Joint Venture partners. Offerors who do not meet that minimum requirement are not eligible for award.
Once the proposal is rated “Pass”, the relative weight within each of the 4 evaluation factors is as follows:
Factor 1 – Design and Construction Experience is significantly more important than Factor 2 - Past Performance, Factor 2 - Past Performance is significantly more important than Factor 3 - Management Approach, and when combined, the three (3) non-priced factors are significantly more important than Factor 4 - Price.
Consideration will be afforded to the Offeror that demonstrates the following, in descending order of relevance
Factor 1:
(a) Design and Construction Experience on same type of project or similar project in the immediate country of
Turkey.
(b) Design and Construction Experience on same type of project or similar project in the region of NATO countries and Europe.
(c) Design and Construction Experience on same type of project or similar project in the Continental United
State (CONUS).
Of these, experience in Turkey is determined to be the most relevant, followed by experience in NATO and Europe, which is followed by experience in CONUS. Experience in any other areas will be considered less relevant.
Factor 2-Past Performance is the next most important factor. Consideration will be afforded to the Offeror that demonstrates the following, in descending order of relevance.
Factor 2:
(a) Good to outstanding past performance relevant to Factor 1(a) is more important than Factor 2(b) and significantly more important than Factor 2(c).
(b) Good to outstanding past performance relevant to Factor 1(b) is less important than Factor 2(a) and more important than Factor 2(c).
(c) Good to outstanding past performance relevant to Factor 1(c) is significantly less important than Factor 2(a) and less important than Factor 2(b).
Factor 3-Management Approach is the next most important factor.
Consideration will be afforded to the Offeror that demonstrates the following, in descending order of relevance.
Factor 3:
(a) Management Approach relevant to Factor 1(a) shall be more important than that of Factor 3(b) and significantly more than Factor 3(c).
(b) Management Approach relevant to Factor 1(b) is less important than Factor 3(a) and more important than Factor 3(c).
(c) Management Approach relevant to Factor 1(c) is significantly less important than Factor 3(a) is and less important than Factor 3(b).
Factor 4-Price is the least important factor.
Notes The source selection process will use a one phase selection approach as authorized under 10 U.S. Code § 2862
- Turn-key selection procedures. Contractors are not required to submit a design product as part of their proposal.
However, Offerors shall use the reference Project Definition Report provided in the Solicitation, as the basis of their proposal.
B. FACTORS TO BE EVALUATED
The following evaluation factors will be used to evaluate each proposal: Award will be made to the Offerors whose proposals are the best value to the Government based upon an integrated assessment of the evaluation factors. IAW FAR 15.304, the following factors will be considered in evaluating the proposals:
Factor 1 – Design and Construction Experience Factor 2 – Past Performance Factor 3 – Management Approach Factor 4 – Price
C. EVALUATION APPROACH
The overarching evaluation approach for all factors is as follows:
Adequacy of Response. The proposal will be evaluated to determine whether the Offeror’s methods and approach have been adequately and completely considered, defined, and satisfied the requirements specified in the solicitation.
The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the solicitation.
Feasibility of Approach. The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven techniques.
D. DISCUSSIONS
1. GENERAL INFORMATION: The Government does not intend to hold discussions. However, in accordance with FAR 15.306(d), discussion sessions with each Offeror may be held. Should discussions take place, all Offerors in the competitive range will be allowed to submit Final Proposal Revisions.
2. DISCUSSION SCHEDULING: If discussions are conducted, the Contracting Officer may conduct discussions orally, in writing, etc. The method for discussions will be at the discretion of the Contracting Officer. The Contracting Officer will provide additional instructions with the notification.
VOLUME I
FACTOR 1: Design and Construction Experience Evaluation Criteria:
1. The Government will evaluate the depth and the relevancy of the experience as submitted in the offeror’s proposal in accordance with the following criteria:
(a) Projects demonstrate design and construction experience in Turkey, and/or design and construction experience using U.S. standards. The experience shall not be limited to military type projects.
Same or similar projects performed in the country of Turkey are acceptable. 100% of resources shall from the country of Turkey.
(b) Project examples that demonstrate experience working with proposed Key Subcontractors and/or the proposed JV Partners working together on Design-Build projects are considered more relevant.
(c) The prime contractorOfferor must have performed as the prime on all a minimum of three (3) projects. If the projects were executed by Joint Venture, then then offeror must show evidence of being in the Joint Venture. Offerors who do not meet this minimum requirement are not eligible for award.
(d) Projects with a cost of $5,000,000 to $15,000,000. Offerors may submit higher valued projects if there is a scope of work with a measurable performance period and measureable monetary value within a larger project that is relevant to this procurement. An example could be a single contract that includes separate facilities, or buildings, or phased construction with associated utilities improvements that shows relevant experience. Offerors shall clearly describe this project and how it related to the overall contract.
Projects outside the relevant range may be considered less relevant. Smaller projects bundled into a larger project in order to meet this cost element are not considered relevant.
2. Projects considered relevant shall be completed within the last six (6) years from the date of the solicitation or at least 50% complete by the date of this solicitation; performed in Turkey; between $5,000,000 and $15,000,000; and include the following:
(a) New Construction with associated utility and communication improvements and connections
(b) Design/Build construction projects
(c) Temporary buildings with associated utility and communication improvements and connections
(d) Environmental, to include permitting, hazardous waste removal and disposal, i.e., asbestos
(e) Demolition and site restoration
(f) Concrete and/or asphalt roads, pavements, airfield runway work;
Offerors demonstrating experience with multiple projects in multiple trades are considered more relevant. Projects older than six (6) years, projects not performed in Turkey, or projects valued outside the listed range, may be considered but will be considered less relevant.
Projects that do not meet these criteria above may be given a lower relevancy rating. Projects meeting all criteria will be given a higher relevancy rating.
The combined technical/risk adjectival ratings for FACTOR 1: EXPERIENCE are listed and defined below:
Combined Technical/Risk Ratings
ADJECTIVE DEFINITION
OUTSTANDING Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
GOOD Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
ACCEPTABLE Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
MARGINAL Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
UNACCEPTABLE Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
The adjectival ratings, defined below, are not separate ratings, but will be used to define the levels of risk in the aforementioned table.
Technical Risk Ratings Adjectival Rating Definition
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
FACTOR 2: PAST PERFORMANCE
Evaluation Criteria:
1. The Government will evaluate the Offeror’s past performance to determine how relevant project work is, as described in Factor 1 Design and Construction Experience, for the submitted three (3)up to five (5) projects. The Government will evaluate the Offeror’s performance to determine a confidence assessment of the Offeror’s performance. With respect to relevancy, more relevant past performance will typically be a stronger predictor of future performance and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Past Performance will be evaluated for projects completed in the last six (6) years from the date of this solicitation or currently ongoing (at least 50% complete).
The Offeror's past performance will be evaluated based on performance on projects submitted under Factor 1 Experience, to include the past performance of any Subcontractors or JV partners whose projects the Offeror may have submitted. Proposals will be evaluated based on the information provided and any other Past Performance information obtained by the Government, to include, but not limited to, the sources listed in Section 00 21 00 Submission Requirements for Factor 2. Past performance will be evaluated in accordance with the following criteria:
(a) Quality: The degree to which the Offeror has complied with the contract requirements; met quality standards; was timely in regard to problem resolution without extensive customer guidance;
and the shown effectiveness of his prior quality control program.
(b) Schedule/Timeliness of Performance: Whether the Offeror met contract completion dates including significant milestones and where schedules were exceeded, whether the Offeror identified valid justifications for the delays or if liquidated damages were assessed due to late delivery by the Offeror.
(c) Customer Satisfaction: The degree to which end-users were satisfied with the project; whether the Offeror was reasonable and cooperative in regard to resolving disagreements; whether the Offeror was responsive and businesslike with concern for the customer, and whether the Offeror achieved customer satisfaction.
(d) Management Personnel/Labor: Whether the Offeror used effective business practices for on-site management for subcontractors, suppliers, materials, and labor force. Whether and the extent to which the Offeror displayed an ability to hire and retain a qualified workforce; controlled government/ owner property when applicable; provided a workforce with the required expertise;
successfully managed projects and easily assimilated and incorporated changes in requirements and priorities in response to the owner; and provided an effective overall management and control of projects and programs.
(e) Cost/Financial Management: Whether the Offeror met the contract requirements by completing the project at the agreed to price and where not, the extent to which the Offeror was responsible for cost increases; whether the Offeror provided alternative methods that benefited the client;
whether the Offeror submitted invoices timely with sufficient documentation to substantiate requested payment and avoided significant unexplained variances from the original price.
(f) Safety/Security: The Offeror’s prior record for maintaining an environment of safety, adherence to a safety plan, and compliance with safety requirements, including following safety regulations, housekeeping, and correcting noted deficiencies, as well as the Offeror’s prior compliance with all security requirements and personnel security requirements when applicable.
(g) The Government reserves the right to verify statements the Offeror makes regarding its past performance to determine whether they are substantiated.
2. The Government will consider past performance information in evaluating overall risk associated with a particular Offeror. When evaluating these criteria, the following will be taken into consideration for evaluation purposes:
(a) The relevance of the past performance;
(b) how recently the project submitted was performed;
(c) trends in the Offeror’s performance;
(d) evaluations, letters of appreciation, and commendations from customers; and
(e) positive and/or negative comments that impact evaluation of Offeror’s past performance.
3. Unavailability of Past Performance Information: IAW FAR 15.305(a)(2)(iv), in the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available; the Offeror may not be evaluated favorably or unfavorably on past performance.
4. The adjectival ratings for FACTOR 2: PAST PERFORMANCE are listed and defined below:
Past Performance Relevancy Ratings:
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
FACTOR 3: MANAGEMENT APPROACH
Evaluation Criteria:
Management Approach is the third most important factor.
Proposals will be evaluated for reasonableness, risk, and logic and the extent to which the proposal illustrates a basic understanding of managing the contract. In performing the evaluation, the Government will evaluate the following:
1. Whether the proposal clearly delineates lines of authority, and communication with the Government, on the organizational chart (graph) organized in a precise and logical manner, including all offices involved with the management of the contract, including Key Subcontractors and JV partners.
2. Whether the proposal contains comprehensive descriptions of duties, roles, major responsibilities, and authorities for the a) Program Manager, b) Project Manager , c) Site Superintendent, d) Quality Control Manager, e) Design Quality Control Manager and f) Safety Manager, and other key personnel (e.g. contracts manager, security manager, logistics specialist, subcontracts manager, etc.). Include the roles and major responsibilities and authorities for Key Subcontractors and JVs, presented in a logical manner.
2.3. The extent to which the proposal describes a reasonable and logical plan of managing the design; assuring design and materials meet US and Host Nation requirements; resolving differences in US and Host Nation standards and specifications; roles, responsibilities and process in securing design, materials and permit approvals; managing the interaction between designers and construction personnel during the lifecycle of the project; managing the construction and demolition Host Nation approvals, sequencing and schedule; providing a satisfactory fire crash rescue station facility turnover to include operation and maintenance manuals, warranties, and training; and managing communication with USACE.
3.4. The adjectival ratings for FACTOR 3: MANAGEMENT APPROACH are listed and defined below:
Technical Ratings
Performance Confidence Assessments Rating Definition Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the
Unknown Confidence (Neutral) No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
ADJECTIVE DEFINITION
OUTSTANDING
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is very low.
GOOD Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
ACCEPTABLE Proposal meets requirements and indicates an adequate approach and…