ProjNet Bidder Inquiries and Government Resposnes

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: W912GB17R0045 Airfield Fire/Crash Rescue Station Review: Requests for Information (00001) (sorted by CommentID ) Displaying 222 inquiries.

Id Discipline Sheet Detail Spec

7224831 Architectural 085653

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

As indicated in the drawings and section 08 56 53 blast resistant glass windows, all exterior blast resistant windows will be double action (turn/tilt) type windows. Please confirm.

On: Nov 18 2017.

Government Response. . All exterior windows should be double action (turn/tilt) type windows with blast resistant glass meeting the requirements of UFC 4-010-01. On: Jan 17 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224832 Architectural 08 56 53

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that single exterior aluminum doors will NOT be blast resistant.

On: Nov 18 2017.

Government Response. . All exterior doors shall be blast resistant in accordance with UFC 4-010-01. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224833 Architectural A-15 / A-16

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the RFP documents the temporary facilities for 14 personnel requirements written as "bed space and wardrobes (closets) for 14 personnel". Please confirm bed space layouts given in A-15 and A-16 for information only are acceptable.

On: Nov 18 2017.

Government Response. . Response to this question is provided in Amendment 0004, Supplemental Statement of Work. The requirement is to provide 14 beds. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224834 Other non - price proposal

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the solicitation the relevancy of the past experience projects are limited to be completed in Turkey. Please change this evaluation factor so we can include our similar projects in different areas such as middle-east.

On: Nov 18 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224835 Other price proposal

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

There is no pricing sheet issued with the RFP. Please issue related pricing schedule.

On: Nov 18 2017.

Government Response. . Pricing shall be provided on CLINs 0001 - 0003 of the RFP. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224836 Other 52.228-1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the solicitation section 52.228-1 bid guarantee seems to be 20% of the bid price or $4 Million, whichever is less. Different percentages were mentioned in other places of the solicitation. Please confirm the bid guarantee is 20% of the bid price or $4 Million, whichever is less.

On: Nov 18 2017.

Government Response. . Response was provided in Amendment 0002 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224837 Other 52.000-4062

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the solicitation section 52.000-4062 bank letter of guaranty seems to be 20%. In other places of the solicitation it seems to be 25%. Please confirm the bank letter of guaranty percentage is 20%.

On: Nov 18 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Page 1 of 34ProjNet: Logged In User

1/22/2018https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224838 Architectural Furnishing

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Built-in equipment will be part of the construction contract. Furnishing and operational equipment will be provided by the user under separate funding. Please confirm.

On: Nov 18 2017.

Government Response. . Response to this question is already specified in Statement of Work SECTION 01 01 00 Para 2.2 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7224839 Other non - price proposal

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Amendment changed the Factor 1: Experience states "projects must be performed within the last six years from the date of this whereas original RFP was within the last 10 years. Could you please change it back to 10 years so we can include our similar projects completed within the last 10 years?

On: Nov 18 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225211 Other Solicitation Section L

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Inquiry 1- Section 004300-Bid Bond Form, BLA&BLG format, Bank Letter of Assurance (Sample) The Sample Bank Letter of Assurance, second paragraph states that; "...The Bank Letter of Assurance is issued for $25,000,000 as presented by this firm, Please confirm that the amount of $25,000,000 (twenty five million USD) is correct, and there is no mistyping.

Inquiry 2- Section 004300- Bid Bond Form, BLA&BLG Format, Bank Letter of Assurance, the third paragraph reads as; "the Bank Letter of Guaranty will be issued for the percent (25%) of the value of the contract...". It seems that there is a typing error in this statement. The percentage is given as "ten" by words, but given as 25 in figures. Please clarify.

On: Nov 20 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225229 Other SECTION 01 01 00 Statement of

Work

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In SECTION 01 01 00 Statement of Work, part 2.1.5 Registration with the USGBC or GBI, The RFP metions "LEED (Leadership in Energy and Environmental Design) Certification is not required". However, in Project definition report LEED Silver is required for the project. Please clarify LEED Silver is required or not?

On: Nov 20 2017.

Government Response. . Response to this question is specified in Statement of Work SECTION 01 01 00 - Part 2.1.5,

1. LEED Certification is not required.

2. Instead of LEED Certification, this project requires third party certification to demonstrate compliance with the DoD-specific Guiding Principles Compliance (GPC) through the Air Force Sustainability Requirements. GPC third party certification may be provided by:

a. US Green Building Council (USGBC), or

b. Green Building Initiative (BGI)

3. The project must also comply with the requirements of ECB 2016-30 (Air Force Sustainability Requirements) and UFC 1-200-02 (High Performance and Sustainable Buildings).

a. ECB 2016-30 (http://www.wbdg.org/ffc/af-afcec/policies-and-guidance-af-design-and-construction)

b. UFC 1-200-02 (http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02) On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225231 Contracting Bank Letter of Assurance Text

In the Bank Letter of Assurance Text; there two different percentages have been defined for amount of BLA. The sentence is "The Bank Letter of Guaranty will be issued for ten percent (25%) of the value of the contract". Please make it clear which on

Bank Letter of Assurance Text

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the Bank Letter of Assurance Text; there two different percentages have been defined for amount of BLA. The sentence is "The Bank Letter of Guaranty will be issued for ten percent (25%) of the value of the contract". Please make it clear which one is correct, 10% or 25%?

On: Nov 20 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225232 Contracting Bank Letter of Assurance Text Bank Letter of Assurance Text Bank Letter of Assurance Text

Page 2 of 34ProjNet: Logged In User

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to Bank Letter of Assurance Text, BLA will be issued for 25M USD. Please confirm that 25M USD is maximum contract value and BLA will be issued for %25 (or %10) of contract value?

On: Nov 20 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225244 Contracting Bank Letter of Assurance Bank Letter of Assurance Bank Letter of Assurance

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Since the proposal packages will be sent throuhgt AMRDEC SAFE, only copy of BLA will be uploaded to system. Do we have to sent original copy of BLA after we submit proposal?

On: Nov 20 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7225250 Other

SF 1442 & 52.000-4062 BANK

LETTER OF GUARANTY

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In SF 1442 Item 12-B, RFP menti?ns "THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS in 14 CALENDAR DAYS AFTER AWARD". Hwoever, in 52.000-4062 BANK LETTER OF GUARANTY, RFP mentions "Within SEVEN calendar days after the date of contract award, the Contractor shall furnish the Contracting Officer a Bank Letter of Guaranty for the performance of the work". Please confirm which of these days are correct for delivering BLG.

On: Nov 20 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226656 Contracting Warranty Duration of Warranty Warranty

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the warranty period of contract after final acceptance?

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Amendment 0002. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226658 General A.07.23_Solicitation_W912GB17R0045

13. ADDITIONAL

SOLICITATION

REQUIREMENTS

Proposal Due Date

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

We kindly request two weeks of extension to proposal due date.

On: Nov 21 2017.

Government Response. . See Amendment 0002 On: Nov 28 2017

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226668 Civil statement of work page 103 of 106 Para. 1.2.2

According to statement of work page 103 of 106 Para. 1.2.2 "References to using building #345 or #346 for temporary facilities shall be disregarded as these facilities are no longer available for use."

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Could you clarify the exact location of temporary facilities, in order to determine the existing utilities locations?

On: Nov 21 2017.

Government Response. . Response to this question has been addressed in Amendment 0004. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226669 Civil work pages between 102 and 106 Para. 1.2.2

According to statement of work pages between 102 and 106 Para. 1.2.2 is stated that some furniture (Refrigerators, Cabinets, oven, desks etc.) will supplied by contractor.

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Could you please clarify shall contractor supply all new furniture (Refrigerators, Cabinets, oven, desks etc.) or which items shall supply by contractor for all temporary facilities? or Shall contractor relocate the existing furniture's in Bldg. #370 & #372 to the temporary facilities?

On: Nov 21 2017.

Government Response. . Response to this question has been addressed in Amendment 0004. On: Jan 19 2018

Page 3 of 34ProjNet: Logged In User

7226670 Civil work pages between 102 and 106 Para. 1.2.2

According to statement of work pages between 102 and 106 Para. 1.2.2 is stated that some furniture (Refrigerators, Cabinets, oven, desks etc.) will supplied by contractor.

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

) If Bldg. #345 as reference on drawings (C-5) is allowed to be used as temporary location. Does the contractor need to do any works (touch-up, connection utilities, etc.) to the existing rooms before relocating?

On: Nov 21 2017.

Government Response. . Response to this question has been addressed in Amendment 0004. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226671 Civil work page 103 of 106 Para. 1.2.2

According to statement of work page 103 of 106 Para. 1.2.2 It states that "a quantity of three temporary structures for new six fire trucks."

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Could you please clarify if these temporary structures shall be metal cover (sandwich panels etc.) or will a membrane cover be sufficient?

On: Nov 21 2017.

Government Response. . Response to this question has been addressed in Amendment 0004. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226672 Electrical Electrical drawing sheet E1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Electrical drawing sheet E1, Lighting fixtures that will be used in this project are fluorescent, aren't they supposed to be LED type or induction type?

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Project Definition Report Paragraph 2.4.4 includes requirements.

"9. Specify 14W, T-5 fluorescent bulbs for recessed fixtures (electronic ballast)

10. Specify induction lamps for outdoor lighting fixtures (LED fixtures can be used with a waiver)."

Also please consult the references Incirlik Air Base Architectural Compatibility Guide >>> Base Standards >>> Volume II-9 and Volume II-48 for information regarding the light fixture types used on Incirlik. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226673 Electrical drawing sheet page E1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the data outlets be doubles as in drawing sheet page E1 or quadruple?

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Project Definition Report paragraph 2.5.2. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226674 Electrical page E1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The cable size of receptacles are detailed as 2,5mm2 in page E1. However in Project report item 2.4.4 it is 4mm2; Please clarify.

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Project Definition Report Paragraph 2.4.4, which states:

"Lighting circuits shall be wired with 2.5 mm2 conductors and protected by 1P16A miniature circuit breakers. All power circuits for general purpose receptacles shall be wired with 4 mm2 conductors and protected by 1P20A miniature circuit breakers." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226675 Electrical Electrical drawing sheet E11

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In the Electrical drawing sheet E11, total power is given as 338 kW. According to the single line drawing the generator will feed the pumps in fire pump room only. Please clarify is the generator will feed the main distribution panel? If a power failure occurs magnetic door and window contact devices will not work.

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Project Definition Report paragraph 2.4.4 which states

"New standby generator shall be installed to meet the demand load of the new facility."

Project Definition Report paragraph 2.4.7 states

Page 4 of 34ProjNet: Logged In User

"The new facility shall have 100% standby generator backup upon loss of normal (utility) power." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226676 Electrical Electrical dwg

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the existing removed generator be re-use? Could you please provide the location of the generator; will there be a decorative wall around it?

On: Nov 21 2017.

Government Response. . Response to this question is already specified in Project Definition Report paragraph 2.4.4 which states

"Existing 200kW Caterpillar unit will be removed and disposed as directed by COR."

Drawing C1 of the conceptual design shows the location of "EXISTING GENERATOR TO BE REMOVED".

There is no wall around the existing generator.

A decorative red brick wall is required around all new fuel tanks and generators. Please consult the Incirlik Air Base Architectural Compatibility Guide. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226677 Electrical Electrical dwg

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will there be 110V receptacles besides 220V receptacles?

On: Nov 21 2017.

Government Response. . Yes. Response is already provided in Statement of Work, 1.3.8.2 Site Electrical, Primary Service On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226678 Electrical Electrical doc.s

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will there be a new duct line and manhole between TR#8 and MDP or will contractor use existing manholes?

On: Nov 21 2017.

Government Response. . Response to this question already stated in Project Definition Report paragraph 2.4.3, which states "The connection to the new Fire Station shall be made with a new duct line between TR8 building and the Electrical Service Entrance Room 107 shown on architectural floor plan A1. Duct line shall be concrete encased and shall incorporate a spare PVC conduit." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226679 Electrical TR#8

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will there be spare circuit breakers in LV Panel at TR#8?

On: Nov 21 2017.

Government Response. . Response to this question is already stated in Project Definition Report paragraph 2.4.3, which states "The LV Switchgear inside the substation shall require modification or upgrade in order to supply the new Fire Station demand load. A new feeder CB will be added as required by design and the 3P250A & 3P160A breakers supplying the existing facilities shall remain as spares." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226680 Electrical In Drawing sheet C2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Drawing sheet C2, Transformer building TR5566 will be removed, if there is panels, MV Cubicle and transformer in the existing transformer building, will they be changed with new ones?

On: Nov 21 2017.

Government Response. . Response to this question is already stated in the drawing sheet C-2 and Statement of Work (SOW). To clarify, the Transformer Substation TR8 is Facility 5366 as stated in SOW Section 01 01 00 Para 1.3.8.2.

Facility 5366 is the existing Transformer Substation TR8 and will not be demolished therefore, the existing panels, MV cubicle and transformer will not be changed to new ones.

Facility 5566 does not appear to be the Transformer Substation TR8. Building 5566 shall be demolished. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226681 Electrical In Drawing sheet C2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Drawing sheet C2, Transformer building TR5566 will be removed, if there is panels, MV Cubicle and transformer in the existing transformer building, will they be changed with new ones?

On: Nov 21 2017.

Page 5 of 34ProjNet: Logged In User

Government Response. . Response to this question is already stated in Project Definition Report paragraph 2.4.2. Building 5566 is an abandoned building and is to be demolished.

The Transformer Building appears to be Building 5366, but must be verified by the Contractor. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226682 Electrical Electrical doc.s

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will a fire alarm and data system for temporary building be required?

On: Nov 21 2017.

Government Response. . Response to this question has been addressed in Amendment 0004, see Supplemental Statement of Work section

1.2.2 Temporary Facilities for Fourteen Fire Department, #17. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226683 Electrical Room No. 247

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In order to choose UPS capacity, we have to know the load of dispatch room in Room No. 247.

On: Nov 21 2017.

Government Response. . Response to this question is already stated in the Project Definition Report paragraph 1.3 states "The first phase of this project consists of conducting the necessary design and construction activities for providing temporary facilities and utilities to avail the operation of the Fire Department during the new construction works."

Therefore, this will be determined as part of the design effort. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226685 Electrical parking area and exterior walkway

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Shall contractor provide and install metal pole c/w light fixture at parking area and exterior walkway?

On: Nov 21 2017.

Government Response. . This is part of the design effort. Response to this question is already stated in Project Definition Report paragraph

2.4.5 which states "Exterior electrical distribution shall include pole mounted area lighting and the illumination of building perimeters. Control of lighting shall be photocell with manual override."

Please note UFC 4-730-10 Paragraph 3-7.4. "Ensure that parking areas and the facility have adequate lighting for safety, evacuation, and security measures. If the facility is near a flightline, site lighting should not interfere or be a distraction to aircraft movement at night. Comply with UFC 3-530-01, Interior and Exterior Lighting and Controls." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226687 Electrical fire alarm design drawings

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Does the fire alarm design drawings require a signature by certificated fire engineer?

On: Nov 21 2017.

Government Response. . Response to this question is already provided in SPECIFICATION 28 31 76 "INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM" Section 1.5.1 "Qualifications" On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226689 Electrical In 2.6.2 paragraph CCTV monitors and DVR equipment.

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In 2.6.2 paragraph, provide more information and technical specification for CCTV monitors and DVR equipment.

On: Nov 21 2017.

Government Response. . This information can be collected at the initial design meeting with the customer. No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226690 Mechanical Technical specification

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Technical specification states "The Apparatus Bay is typically heated. Maintain 20 C (68 F) minimum temperature except in areas with very mild winter conditions. Determine exceptions on a case-by-case basis based on climatic conditions. The Services will not air condition the Apparatus Bay except through exceptions. For the Army, refer to TI-800-1, Design Criteria for the appropriate exceptions. The Air Force will determine on a case-by-case basis based on climatic conditions how to condition the Apparatus Bay. In addition to considering climatic conditions, consider the energy costs and sustainability impacts."

Please clarify if contractor shall provide and install heating and cooling system for apparatus bay rooms. Also the type of system required.

On: Nov 21 2017.

Government Response. . Response to this question is already stated in Reference: UFC 4-730-10, 4-1 Table 4-1.0. Apparatus Bay

Per the UFC, heating in the apparatus bay shall be included and the design interior condition shall be 20 degree C. Also, per the UFC, cooling is not a requirement. Cooling would be an "exception" as stated by the UFC. On: Jan 19 2018

Page 6 of 34ProjNet: Logged In User

7226691 Mechanical Mechanical drawings

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can you provide AutoCAD (DWG) files of the drawings?

On: Nov 21 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226692 Mechanical equipment

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is there any Government Furnished Equipment or will all equipment such as Laundry machines, water fountains etc. be provided by contractor?

On: Nov 21 2017.

Government Response. . Response to this question is already stated in Supplemental Statement of Work section 1.2.4 Furniture and Supplies.

On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226693 Mechanical Technical specifications

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Technical specifications states that "Consider providing hydraulic lifts and/or overhead lift/crane." For vehicle maintenance bay room please clarify which type of system is requested for use.

On: Nov 21 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. Offerors shall note UFC TABLE 4-12.0. states to consider. During the initial design phase, coordination with the user shall consider need for lifts or crane. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226694 Mechanical Automation system

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the new building require a separate Automation system for all Mechanical and HVAC system?

On: Nov 21 2017.

Government Response. . Response to this question is already stated in reference documents which state: Controls shall be installed per the base EMCS/BMCS requirements in accordance per the Heating, Ventilating, and Air Conditioning; and UFC 3-410-02A, Heating, Ventilating, and Air Conditioning (HVAC) Control Systems. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226695 Mechanical new sprinkler

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will the new sprinkler require a storage tank? If so please provide details on the type of tank that is requested?

On: Nov 21 2017.

Government Response. . If a storage tank is required, this will be part of the design process. Further response to this question has been addressed in Amendment 0004, Statement of Work section 1.3.5.2.2 Domestic Water & Fire Suppression Water On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226696 Mechanical Hydrant system

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is a Hydrant system outside of the building required?

On: Nov 21 2017.

Government Response. . Response to this question is already stated in reference UFC and fire protection documents. There is no UFC 4-730-10 requirement for a "hydrant system outside the building"

However, a hydrant shall be located in the vicinity of the facility per fire protection requirements. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7226697 Mechanical hose bib line

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Could you please provide details for the hose bib line and if contractor should provide a separate backflow preventer for hose bib line?

On: Nov 21 2017.

Government Response. . Response to this question is already provided in reference document UFC 4-730-10, which has the following for hose bibbs:

TABLE 4-1.0. APPARATUS BAY-Provide foot-operated mop sink with mop hanging rack. Provide standard hot and cold water hose bibb for every two truck bays.

Page 7 of 34ProjNet: Logged In User

TABLE 4-3.0. HOSE STORAGE-Provide a floor drain. Consider providing a hose bibb.

TABLE 4-11.1. FIRE EXTINGUISHER-Provide a hose bibb and floor drain

TABLE 4-11.2. FIRE EXTINGUISHER (FLIGHTLINE)

MAINTENANCE AND STORAGE-Provide a hose bibb and floor drain.

TABLE 4-12.0. VEHICLE MAINTENANCE BAY-Provide minimum 75-mm- (3-in.-) diameter water service with 62-mm- (2.5 in) diameter National Standard Threads ball valved outlet to each vehicle. Provide standard hot and cold water hose bibb.

TABLE 4-30.0. OUTDOOR PATIO/BBQ -Provide hose bibb On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7229933 Structural A4, E3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

1. It is mentioned that temporary buildings will be built in another building. Is this information correct? If so, what is the interior clear height below trusses?

2. 1.2.1 Temporary Facilities for Six Fire Trucks do they need a clear clearance of 15mt x 15mt? Or is it possible to use columns inside the building? If it is not allowed to have a column in the middle, it will be necessary to use heavier steel profiles. On the closed walls and for the roof covering the trapezoidal sheet will be used. Please confirm. We ask you to let us know what they are requesting for electricity. After getting this information we can tell you whether or not we will include electricty.

3. 1.2.2 Temporary Facilities for Fourteen Fire Department Personnel is actually four separate buildings. Dormitory building, warehouse building, office building and building including Day / training / fitness / conference sections. We have 2 sample drawings for the dormitory and warehouse. For the other 2 buildings, there are only descriptions in the file you send. We need the following information about these buildings:

a. If you have sketch drawings of the buildings requested, we will be able to make the designs closest to your sketch drawings.

b. Building clear heights

c. Electrical installation flooring type: Inside panels & ceilings / Surface-mounted plastic cable channels / Surface-mounted EMT pipe

d. Type of window and door frames to be used: Aluminum / PVC

e. Type of suspended ceiling to be used: Rock wool / Metal

4. Goverment office is also requested. For this building we need the same information.

5. Furniture, equipments, AC units, heaters, phone system, data system, fire fighting scope will not be included in our prices. After getting information about the electrical system we will let you know if our proposal will include electricity or not.

On: Nov 23 2017.

Government Response. . Response to this question is provided in Amendment 0004, revised Supplemental Scope of Work, and added drawings.

On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230006 Civil drawings sheet C3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

As referred on drawings sheet C3, what is the requested crash rate for the drop arm barrier.

On: Nov 24 2017.

Government Response. . Offerors shall assume crash rate of K-8, however this will be determined at design coordination with the customer. No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230007 Civil drawings sheet C3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What type of drop arm barrier is requested automatic or manual?

On: Nov 24 2017.

Government Response. . Automatic. No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230008 Civil The roll-up doors of the

Apparatus baysand the Vehicle Maintenance Bay

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

It states that ''The roll-up doors of the Apparatus bays and the Vehicle Maintenance Bay of the facility shall be fast acting type, insulated aluminium.'' Could you please clarify if the roll up doors need to be blast-mitigating type or just insulated aluminium?

On: Nov 24 2017.

Government Response. . Response to this question is already stated in Statement of Work section 1.3.6.4.4 Doors and Windows, which does not specify blast-mitigating for roll-up doors. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230010 Other A.07.23_Att_Drawings_35_Percent_W912GB17R0045 C3 Drawing Active Vehicle Barrier

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the specifications and detailed information of the Fast Acting Type Barrier? (Such as finishes type, height, width, rating type/quantity...etc. )

On: Nov 24 2017.

Government Response. . Response to this question already addressed in Inquiry ID: 7230006 On: Jan 19 2018

Page 8 of 34ProjNet: Logged In User

7230011 Landscape Architecture

A.07.23_Att_Drawings_35_Percent_W912GB17R0045 C3 Drawing Photovoltaic Sunshade

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the specifications and detailed information of the Photovoltaic Sunshade? (Such as height, framing type, framing finishes, motorized, glass type...etc. )

On: Nov 24 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230012 Security A.07.23_Att_Drawings_35_Percent_W912GB17R0045 C3 Drawing Chainlink Fence

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the specifications and detailed information of the chainlink Fence? (Such as height, finishes, post space, gate dimension...etc. )

On: Nov 24 2017.

Government Response. . Response to this question provided in Amendment 0004, see Section 01 01 00 Statement of Work, paragraph 1.3.4 Civil Works, reference kk. (added) HQ USEUCOM Antiterrorism Operations Order (OPORD) 16-03, dated 18 March 20169, which states 2 meter fence, vehicle rated, and assume K-4 rating. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230013 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF)

CHAPTER 4 SPECIFIC DESIGN

CRITERIA/4-1

INTRODUCTION.

TABLE 4-26.0. FITNESS ROOM

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to "TABLE 4-26.0. FITNESS ROOM", who is the responsible to procuring and installing of the fitness room equipment&furnishing such as fitness machines, treadmill, stationary bicycle, elliptical machine, weights, mats and full height mirror...etc.?

On: Nov 24 2017.

Government Response. . Response to this question is already provided in Section 01 01 00 Statement of Work para 1.3.6.3.1 Room Descriptions and 2.2 FURNISHINGS & EQUIPMENT On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230014 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF)

CHAPTER 4 SPECIFIC DESIGN

CRITERIA/4-1

INTRODUCTION.

TABLE 4-27.0. LAUNDRY ROOM

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to "TABLE 4-27.0. LAUNDRY ROOM", who is the responsible to procuring and installing of the laundry room equipment such as washer, dryer, folding table, drying rack...etc.?

On: Nov 24 2017.

Government Response. . Response to this question is provided in Inquiry ID: 7230013 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230015 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF)

CHAPTER 4 SPECIFIC DESIGN

CRITERIA/4-1

INTRODUCTION.

TABLE 4-3.0. HOSE STORAGE

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to "TABLE 4-3.0. HOSE STORAGE", who is the responsible to procuring and installing of the hose room moveable rack?

On: Nov 24 2017.

Government Response. . Response to this question is provided in Inquiry ID: 7230013 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230016 Architectural A.07.23_Att_Project_Definition_Report_W912GB17R0045 2.2.5.4 Room Descriptions Room Nos. 217 through No. 240

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to "Room Nos. 217 through No. 240" detailed information, who is the responsible to procuring and installing of the bedroom lockers?

On: Nov 24 2017.

Government Response. . Response to this question is already provided in Sectiion 01 01 00 Statement of Work, para 2.2. Bedroom lockers to be furniture. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230017 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

Toilet Accessories

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the toilet accessories are in the contractor's scope?

Page 9 of 34ProjNet: Logged In User

On: Nov 24 2017.

Government Response. . Response to this question already provided in SECTION 01 01 00 Statement of Work Para 2.2, and SECTION 10 28 13, toilet accessories shall be provided by contractor On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230018 Architectural A.07.23_Att_Project_Definition_Report_W912GB17R0045 2.2.5.4 Room Descriptions Room Nos. 111 and 112 / Room Nos.

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

According to "Room Nos. 111 and 112 / Room Nos. 213"detailed information, who is the responsible to procuring and installing of the bedroom lockers?

On: Nov 24 2017.

Government Response. . Response is provided in SECTION 01 01 00, Statement of Work, Para 2.2 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230019 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

Free Standing Furniture

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the free standing furnitures are in the contractor's scope? (such as tables, chairs, seats, bookcases, file cabinets, drawers, desk lamps, magazine racks as stated in the "02_UFC_4-730-10_(2006)_Fire_Stations_(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045" )

On: Nov 24 2017.

Government Response. . Response is provided in SECTION 01 01 00 Statement of Work Para 2.2 On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230020 Architectural A.07.23_Att_Project_Definition_Report_W912GB17R0045 2.2.5.4 Room Descriptions Room Nos. 114, 115 and 124

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the wire mesh metal lockers are in the contractor's scope for room 114, 115 & 124 ?

On: Nov 24 2017.

Government Response. . Response is provided in SECTION 01 01 00 Statement of Work, Para 2.2. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230021 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

TABLE 4-4.0. SCBA

MAINTENANCE/COMPRESSOR

ROOM

Euipment & Furniture

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the bench, shelf, mask pressure testing machine, safety cage, scales, bins, dry chemical extiguisher recharge kit are in the contractor's scope for room 130/SCBA Maintenance ?

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 2.2. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230022 Architectural A.07.23_Att_Project_Definition_Report_W912GB17R0045 2.2.5.4 Room Descriptions Room No. 105

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the retractable projector screen, and overhead projector, other audio/visual equipment, televisions, wall-mounted grid map and map racks, and tack and dry-erase boards are in the contractor's scope for room 105/EOC Situat. Room?

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 2.2. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230023 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

Furnishing

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the window blind & shower curtain rod and blind are in the contractor's scope?

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 2.2. and Para 1.3.6.3.1. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230024 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

TABLE 4-23.0. DAY/TRAINING

ROOM (Including Kitchen)

Euipment & Furniture

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the TV, DVD Plyer, VCR, map, map rack, are in the contractor's scope for room 244/ Day Training Room?

Page 10 of 34ProjNet: Logged In User

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 2.2. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230025 Architectural 02_UFC_4-730-10_(2006)_Fire_Stations_

(USACE_and_AF) and A.07.23_Att_Project_Definition_Report_W912GB17R0045

Residential Appliances

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the residential appliances are in the contractor's scope for room 244/ Day Training Room? (such as refrigerators with freezers, large-capacity dishwashers, stove/range, exhaust hood, microwave oven, commercial-grade coffee maker, toaster oven, and ice maker)

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 2.2., and 1.3.6.3.1. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230026 General A.07.23_Att_Drawings_35_Percent_W912GB17R0045 C1&C2 Drawing Demolition

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please clarify whether the stored materials, furniture, equipment in the Existing Buildings (370&372) will carried by the contractor to the temporary building.

On: Nov 24 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230027 Architectural door & window schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the door & window schedule?

On: Nov 24 2017.

Government Response. . This is a design effort by the Contractor. No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230028 Architectural finish schedule

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the finish schedule?

On: Nov 24 2017.

Government Response. . Response is already provided SECTION 01 01 00 Statement of Work, Para 1.3.6.3.1. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230029 Architectural blast mitigation

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm that the all exterior openings of the new building such as windows, doors, louvers are designed for the blast mitigation?

On: Nov 24 2017.

Government Response. . Response is already provided in reference SECTION 01 01 00 Statement of Work UFC 4-101-01. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230030 Architectural Window Blind

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the Window Blind specification?

On: Nov 24 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230035 Electrical In item 2.4.4.1

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In item 2.4.4.1 the power of fire pump and HVAC system are 162 kW. However the actual powers of these systems are way more. Therefore the capacity of existing transformer may not compensate the new load; service entrance size will be higher than 630A. Do we need a new transformer substation specifically for this building c/w RMU, Transformer and LV Panel?

On: Nov 24 2017.

Government Response. . Response to this question is already stated in the RFP which states that the existing transformer in TR8 is 1600KVA.

This determination is part of the design effort. See Project Definition Report paragraph 2.4.3. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230036 Electrical In item 2.4.7

Page 11 of 34ProjNet: Logged In User

In item 2.4.7 Existing MONACO D21 Central Receiving Station has to be removed to a temporary place and needs to keep working. Who will disassemble and reassemble the unit?

On: Nov 24 2017.

Government Response. . The response to this question is already provided. The disassembly/reassembly work is part of the design/build scope described in Project Definition Report paragraph 1.3 which states "The first phase of this project consists of conducting the necessary design and construction activities for providing temporary facilities and utilities to avail the operation of the Fire Department during the new construction works.

The second phase consists of the demolition of the existing buildings (Buildings No 370 & 372) of the Fire Department , and construction of a new reinforced concrete building to meet the current and future requirements of the Fire Department of Incirlik Air Base." On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230038 Electrical In drawings sheet C3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In drawings sheet C3, new outdoor seats, tables and photovoltaic sun shade are specified, where will these sun shades feed and what will be the maximum power of these shades?

On: Nov 24 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230040 Mechanical In UFC 4-730 In UFC 4-730 specific design criteria

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In UFC 4-730 specific design criteria states that "Provide a Fire Apparatus Vehicle Exhaust Removal System (FAVERS) in compliance with NFPA 1500 to eliminate 100% of vehicle exhaust emissions. A direct vent system that evacuates vehicle exhaust directly to the outside is the preferred FAVERS. Make-up air should be distributed so as to minimize drafts and be introduced above apparatus level since diesel exhaust is heavier than air. In this way, the make-up air flow downward will assist in pushing the exhaust fumes out the Apparatus bay doors when open."

When installing a makeup fan you require a louver for the purpose of gravity against positive pressure when door is closed. Do these louvers need to be explosion proof?

On: Nov 24 2017.

Government Response. . No additional information will be provided, Offerors shall propose on the information as shown.

This is a design decision based on best product design and function to satisfy the performance requirements and functionality of the facility along with a LCCA and maintenance consideration.

This is typically decided in the initial design concepts. Typical, based on past designs is an overhead "turn-key" system manufactured specifically for vehicle bay facilities. On: Jan 19 2018

Current Request Status: Request Closed

Information for this report is procurement sensitive.

7230043 Mechanical…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.