Solicitation W912GB-17-R-0042.pdf

PDF 726 KB Posted

Attached to
Construction of Multiple Sclerosis Therapy Center Vrujci, Serbia
Solicitation number
W912GB-17-R-0042
Issued by

About this file

Solicitation W912GB-17-R-0042

View the file

Other files

File Type Posted
W912GB-17-R-0042_Amendment_02.pdf PDF
Amendment_01.zip ZIP file
Attach 2 Exp Info Sheet 17-R-0042.docx DOCX document
01525 Safety and Occupational Health Requirements for Projects in Emerging Countries —
02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
Attach 3 PPQ 17-R-0042.docx DOCX document
01 33 00 Submittal Procedures.pdf PDF
01 35 26 Safety and Occupational Health Requirements —
Attach 6 BLA Sample Template.docx DOCX document
01 32 01.00 10 Project Schedule.pdf PDF
01 78 00 Completion Procedures.pdf PDF
Attach 8 Resume.docx DOCX document
A.01.38_Attachment_1_Location Map.pdf PDF
01 45 01.01 Additional Quality Control Personnel.pdf PDF
Attach 1 Overview Exp 17-R-0042 .docx DOCX document
Attach 4 Price schedule.docx DOCX document
Attach 5 BLG Sample Template.docx DOCX document
00 73 15.01 Government Field Office.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
Attach 7 Letter of Commitment.docx DOCX document
02 41 00 Demolition and Deconstruction.pdf PDF
A.01.38_Attachment_4_Arch.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
A.01.38_Attachment_2_Site Plan.pdf PDF
01 00 15 Design After Award.pdf PDF
A.01.38_Attachment_5.pdf PDF
A.01.38_Attachment_3_Site Photos.pdf PDF
Construction Signs.pdf PDF
00 73 15 General Conditions —
00 73 15.02 Government Resident Office.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct Multiple Sclerosis (MS) Treatment Center – Vrujci, Serbia

Solicitation W912GB-17-R-0042: Construct Treatment Center, Vrujci, Serbia

The pre-proposal conference and site visit w ill be conducted on Thursday 4 May 2017 at 09:00 local time. The meeting w ill take place at Zira Hotel Beograd Ruzveltova 35, 11000 Belgrade, Serbia. Those w ho w ish to attend the pre-solicitation conference should send a notif ication via e-mail to Bonifacio Magdaleno no later than 02 May 2017.

Pre-solicitation Conference Point of Contact:

Bonifacio Magdaleno, Email: bonifacio.magdaleno@usace.army.mil Telephone: +49 (0)611 9744 2625

Scope of Work dated 18 April 2017 and all associated attachments and specif ications.

BONIFACIO MAGDALENO 011-49-611-9744-2625

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

01-May-2017

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912GB-17-R-0042 181

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

1010 Statement of Construct MS Therapy

Section 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Job Design / Build of an MS Treatment Center

FFP

All work associated with the design and construction of a new multiple sclerosis treatment center. The facility shall consist of a masonry / concrete building with a sloped roof and a detached utility / heating structure with a mechanical room. The facility shall be designed and constructed in accordance with the statement of work and all associated specifications.

FOB: Destination

NET AMT

0002 Job OPTION Additional Four Patient Capacity

FFP

All work associated with the design and construction of a new multiple sclerosis treatment center. The facility shall consist of a masonry / concrete building with a sloped roof and a detached utility / heating structure with a mechanical room. The facility shall be designed and constructed in accordance with the statement of work

0003 Job OPTION Additional Four Patient Capacity (2)

FFP

All work associated with the design and construction of a new multiple sclerosis treatment center. The facility shall consist of a masonry / concrete building with a sloped roof and a detached utility / heating structure with a mechanical room. The facility shall be designed and constructed in accordance with the statement of work

0004 Job OPTION Elevator System

FFP

All work associated with the design and construction of an elevator system to serve two floors. All work shall be done in accordance with the statement of work and all associated specifications.

0005 Job OPTION Pavements

FFP

All work associated with the design and construction of a concrete driveway in front of the builiding, concrete sidewalks around the building and eonnecting the facility with existing facilities and the parking lot. All work shall be done in accordance with the statement of work and all associated specifications.

PRICE SCHEDULE

The Offeror shall price on all base and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the price schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.

See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or Price Schedule including interim completion dates for individual facilities.

Base Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance to ensure the patients can utilize the space.

Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 90 calendar days following issuance of NTP for the base work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10 “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, they must be completed within the base period of performance of 365 calendar days.

This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.

Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday. Work on US and Serbian holidays and outside of these hours shall not be performed without prior approval from the Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours, except U.S. holidays.

Prices: All prices are to be proposed in U.S. Dollars.

BASE ITEMS:

CLIN

Construct MS Treatment Center

Design: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall consist of a masonry / concrete building with sloped roof and a detached utility / heating structure with a mechanical room. The facility shall accommodate 12 patients and 10 employees. All work shall be built as described in the statement of work and specifications.

Construction: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall consist of a masonry / concrete building with sloped roof and a detached utility / heating structure with a mechanical room. The facility shall accommodate 12 patients and 10 employees. All work shall be built as described in the statement of work and specifications.

BASE ITEMS TOTAL: $____________

OPTIONAL ITEMS:

Option Item 1 – Additional 4 Patient Capacity accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications.

facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications.

Option Item 2 – Additional 4 Patient Capacity accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications.

facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications.

Option Item 3 – Elevator System

Design: All work associated with the design of an elevator system to serve the two floors. Elevator shall have interior doors at two levels The elevator car shall be suitable for hospital bed transport and shall have internal size of 1400 x 2400 mm. The load capacity shall be a minimum of 1600 kg. All work shall be built as described in the statement of work and specifications.

Construction: All work associated with the construction of an elevator system to serve the two floors. Elevator shall have interior doors at two levels The elevator car shall be suitable for hospital bed transport and shall have internal size of 1400 x 2400 mm. The load capacity shall be a minimum of 1600 kg. All work shall be built as described in the statement of work and specifications.

Option Item 4 – Pavements

Design: All work associated with the design of a concrete driveway in front of the building, concrete sidewalks around the building and connecting the facility with existing facilities and parking lot. All work shall be built as described in the statement of work and specifications.

Construction: All work associated with the construction of a concrete driveway in front of the building, concrete sidewalks around the building and connecting the facility with existing facilities and parking lot. All work shall be built as described in the statement of work and specifications.

OPTION ITEMS TOTAL:

TOTAL PRICE – ALL BASE AND OPTION ITEMS: $____________

The documents listed as follows are provided by and incorporated into this solicitation:

SECTION 00 10 00 Solicitation Contract Form SECTION 00 10 00 CLIN Schedule SECTION 00 10 00 Table of Contents SECTION 00 21 16 Instructions to Proposers/Statements of Work SECTION 00 22 00 Supplementary Instructions SECTION 00 45 00 Representations & Certifications SECTION 00 70 00 Conditions of the Contract SECTION 00 73 00 Supplementary Conditions

USACE SPECIFICATIONS:

00 73 15 General Conditions 00 73 15.15 Time Extensions for Unusually Severe Weather 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 35 26 Safety and Occupational Health Requirements 01 45 01 USACE Quality Control

01 45 01.10 USACE QUALITY CONTROL SYSTEM (QCS)

02 41 00 Demolition and Deconstruction 00 73 15.01 Government Field Office 00 73 15.02 Government Resident Office 01 00 15 Design after award 01 45 01.01 Additional Quality Control Personnel 01 78 00 Completion Procedures 01 78 23 Operation and Maintenance Data 02 82 14.00 10 Asbestos Hazard Control Activities 01525 Safety and Occupational Health requirements for Projects in Emerging Countries EP 310-16a Construction Project Signs

ATTACHMENTS:

Attachment 1 Experience Overview Sheet Attachment 2 Experience Info Sheet Attachment 3 Past-Performance Client Form Attachment 4 Pricing Schedule Attachment 5 Bank Letter of Guarantee EXAMPLE Attachment 6 Bank Letter of Assurance EXAMPLE Attachment 7 Letter of Commitment EXAMPLE Attachment 8 Resume EXAMPLE

DRAWING LIST:

Drawing 1: Location Map- Vrujci Drawing 2: Existing Site plan- - Vrujci Drawing 3: Site Fotos - Vrujci Drawing 4: Architectural Layout – Vrujci Drawing 5: Gift Sign Template

Section 00 21 00 - INSTRUCTIONS

SOW DATED 18 APRIL 2017

Statement of Work Construct MS Therapy Center Vrujci, Serbia

SECTION TABLE OF CONTENTS;

1 GENERAL

2 CIVIL AND GEOTECHNICAL

3 ARCHITECTURAL

4 STRUCTURAL

5 ELECTRICAL & COMMUNICATIONS

6 MECHANICAL

7 FIRE PROTECTION (NO CONTENT - LIFE SAFETY COVERED IN OTHER SECTIONS)

ATTACHMENTS

Att. # 1 Location Maps Att. # 2 Site Plan Att. # 3 Site Photos Att. # 4 Functional Layout Att. # 5 Gift Sign

SPECIFICATIONS

00 73 15 General Conditions 00 73 15.01 Government Field Office 00 73 15.02 Government Resident Office 00 73 15.15 Time Extensions for Unusually Severe Weather 01 00 15 Design After Award 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 35 26 Safety and Occupational Health Requirements (05-15) 01 45 01 USACE Quality Control 01 78 00 Completion Procedures 01 78 23 Operation and Maintenance Data 02 41 00 Demolition and Deconstruction 02 82 14.00 10 Asbestos Hazard Control Activities 01525 Safety and Occupational Health Requirements for Projects in Emerging Countries

1.1 GENERAL

1.2 PROJECT DESCRIPTION

The Request for Proposal (RFP) provides parameters for a design-build project for construction of new Multiple Sclerosis Therapy Center, Vrujci, Serbia. The facility shall consist of a two-story masonry / concrete building with sloped roof. The facility shall accommodate 20 patients and 10 employees.

1.3 GENERAL REQUIREMENTS

The Contractor shall deliver fully functional, turnkey type facilities (without furniture) as described in this document. The work includes but is not limited to design, demolition, fabrication, delivery, installation, construction, and site work. The facility and the installed equipment shall be permanent construction.

The Contractor shall provide to the Contracting Officer’s Representative (COR) all design drawings, shop drawings and certificates as well as calculations prior to the beginning of construction. The contractor shall obtain all Permits necessary for the project in accordance with FAR 52.236-7, Permits and Responsibilities. A copy of all permits, with English translation, shall be furnished to the COR prior to the start of construction work. The facility in this project shall be complete and usable to meet codes and technical and functional requirements per this SOW. All design, calculations, approvals, certificates, fees, labor, material, equipment, direct overhead, indirect overhead, G&A and general conditions to complete this project as described in the SOW shall be included in the proposal price.

The facility shall be designed and constructed in accordance with current standards and building codes as described in these documents. The local municipality shall provide site permit that shall include the exact location of the building.

These design and product requirements are minimum requisites. The Contractor is encouraged to propose alternate design or materials that will be equally or more cost effective or allow for timely completion, durability, ease of maintenance and environment compatibility. The contractor will be required to submit information as requested by the Contracting Officer’s Representative (COR) to make a comparison of the proposed alternative. All variations must be accepted by the Contracting Officer’s Representative (COR).

Compliance with the provisions of this section by subcontractors shall be the responsibility of the Contractor.

1.4 FUNCTIONAL AREAS AND SPACE ADJACENCIES

1.4.1 (BASE ITEM) MS Therapy Center first floor shall accommodate:

- Six (6) patient rooms with private bathrooms, 23.74 m2 each. Each room shall accommodate 2 patients. Each bathroom shall have one sink, one toilet and one shower.

- One (1) employee duty station, 12.15 m2;

- One (1) office, 11.22 m2;

- One (1) open treatment area, 32.30 m2;

- One (1) visitor’s female bathroom with one toilet and one sink, 4.69 m2;

- One (1) visitor’s male bathroom with one toilet, one sink, and one urinal, 3.47 m2;

- One (1) janitor, 2.55 m2;

- One (1) heating room, 26.88 m2;

- One (1) elev. mech. room, 4.00 m2;

- Corridors and stairwell, 47.39 m2;

Total net functional first floor area to be provided shall be 287.09 m2.

1.4.2 (OPTIONS) MS Therapy Center additional rooms and second floor:

- IF either OPTION 1 or OPTION 2 is awarded, the building must be 2 stories and include the following:

• One (1) kitchenette, 11.18 m2;

• One (1) sitting area, 32.24 m2;

• One (1) open treatment area, 32.30 m2;

• One (1) employee female bathroom with one toilet, one sink and 3 double lockers, 4.69 m2;

• One (1) employee male bathroom with one toilet, one sink, one urinal, and 3 double lockers, 3.47 m2;

• One (1) janitor, 2.55 m2;

• One (1) storage room, 11.22 m2;

• Corridors and stairwell, 51.27 m2;

1.4.3 (OPTION 1) MS Therapy Center two (2) additional rooms (total rooms – 8) shall accommodate:

- Two (2) additional patient rooms with private bathrooms, 23.74 m2 each. Each room shall accommodate 2 patients. Each bathroom shall have one sink, one toilet and one shower.

1.4.4 (OPTION 2) MS Therapy Center two (2) additional rooms (total rooms – 10) shall accommodate:

- Two (2) additional patient rooms with private bathrooms, 23.74 m2 each. Each room shall accommodate 2 patients. Each bathroom shall have one sink, one toilet and one shower.

1.4 MATERIALS AND EQUIPMENT

Materials and products used, shall be durable, heavy duty industry standard. The equipment shall be the manufacturer’s standard quality and shall be compatible with all other equipment and materials within the system or assembly. Equipment and materials shall include all connections and accessories necessary to ensure operability and correct installation according to manufacturer’s requirements.

Any material installed that does not meet the requirements of this RFP shall be removed and replaced with materials that meet RFP requirements at the Contractor’s expense.

Each major piece of equipment shall have the manufacturer’s name, address, contact information, type or style, model or serial number, and catalog number on a plate secured to the piece of equipment. The definition of a “major piece of equipment” shall be at the discretion of the COR. At minimum, two (each) of all Operation and Maintenance manuals shall be provided for each piece of equipment. These shall be clearly labeled, bound and delivered at one time prior contract completion. Also, prior contract completion provide two (2) each of any unique tools required to operate or maintain each piece of equipment.

All equipment delivered and placed in storage shall be stored with protection from the weather and temperature variation, dirt and dust, and other contaminants. The contractor shall be responsible for the materials safety and condition while in storage. The government shall not be responsible for damaged or missing equipment.

1.5 DESIGN DIMENSIONS

The design shall be developed using the metric system.

1.6 GENERAL DESIGN INSTRUCTIONS

The Contractor's design and construction shall comply with technical requirements contained herein. The Contractor shall provide design and construction using the best blend of cost, construction efficiency, system durability, ease of maintenance and environmental compatibility. See Specification 01 00 15 Design after Award for additional information.

1.7 DESIGN CRITERIA

Project design, site facilities, utility systems and material standards shall be in accordance with the latest editions of the Host Nation building codes. In the absence of Host Nation building codes the Contractor shall use the International Building Code (IBC) and/or the U.S. / European codes and technical standards and regulations as required in this RFP.

While this RFP references various source standards and specifications, all design documents are to meet Host Nation codes and requirements. It is the designer's responsibility to demonstrate that the Host Nation standard is equal to the cited standard or specifications being supplanted. The more restrictive standards shall apply when the conflicts arise between the requirements of this RFP and any referenced or other applicable codes, standards or regulations. If equivalency cannot be met, the more stringent requirement shall be used and both codes shall be quoted verbatim in the Contractor’s correspondence to the COR. Where specific standards are not indicated, the designer shall determine the required material and execution standards.

Provide an electronic copy of the local host nation standards and building codes in its original language as related to facility construction.

1.7.1 DESIGN SUBMITTALS

The contractor will be required to make formal design submittals at 65%, 95% design as well as a corrected final (100%).

This includes a design analysis, a complete set of drawings, calculations and specifications at each submittal.

The contractor shall submit all documents in electronic format (.pdf for text and calculations, .pdf and .dwg (AutoCAD, latest version) for drawings). See Specification 01 33 00 SUBMITTAL PROCEDURES for additional information.

1.7.2 DESIGN CONFERENCES AND MEETINGS

The contractor and his entire design team shall be required to participate in a design review conference at the 65% and 95% design submittal. No design review conference will be required for the 100% corrected final.

All design review conferences shall be held via teleconference or be reviewed and comments resolved via email.

1.7.3 LIFE-SPAN

Construction must have an expected life span of 25 years.

1.7.4 MAINTAINABILITY

Low maintenance materials and systems must be employed and shall be appropriate for the project climate and location.

1.7.5 OPERABILITY

Systems including but not limited to mechanical, electrical, communications, shall be simple to operate and easy to maintain.

1.7.6 STANDARDIZATION

The Contractor shall use standardized materials, products, equipment, and systems to minimize the requirements for replacement parts, storage facilities, and service requirements.

1.8 SPECIAL CONSTRUCTION PHOTOGRAPH DOCUMENTATION

1.8.1 RECONSTRUCTION PHOTOS

A minimum of 50 pre-construction photos shall be furnished to the COR prior to mobilization. Photos shall be a minimum of 1,504 x 1000 pixel size. Photos shall represent the undisturbed project site prior to any construction activity. Photos shall be accompanied by a site plan identifying locations and dates of the photos taken.

1.8.2 ONSTRUCTION PROGRESS PHOTOS

A minimum of 25 construction photos shall be furnished to the COR on a weekly basis. Photos shall be a minimum of 1,504 x 1000 pixel size. Photos shall be accompanied with a floor plan and site plan and shall be submitted as .jpeg format.

Coordinate location of photos with the COR. Photo shall be submitted by 12:01 PM on each Friday for the duration of the contract.

END OF SECTION

2.1 0 CIVIL AND GEOTECHNICAL

The Contractor shall provide and perform civil engineering design and construction services as required to provide a complete, accessible, functional and usable project. The contractor is required to extensively coordinate civil design and construction work with the scope of the other disciplines described in this SOW.

2.2 1 SCOPE SUMMARY

Civil works for this project are comprised of, but are not limited to, the following principal items (refer to bid schedule for which of these are base bid or optional):

- Site Survey

- Geotechnical Investigation and Report.

- Site Layout

- Clearing, Grubbing, Demolition and Removal

- Earthwork

- Storm Drainage

- Sanitary Sewer

- Water

- Pavement

- Landscaping

2.3 EXISTING CONDITIONS

The proposed project is located in Vrujci, Serbia, southwest of the capital Belgrade, and close to the municipality of Mionica. See Attachment #1-Location Maps, Attachment #2 – Site Plan, and Attachment #3 – Site Photos.

The north portion of the site is generally flat and slopes to the north. The south portion of the site is a hill sloping down to the north. Ground water level on the site is reported to be high. There is a drainage ditch located near the site.

The site currently has an existing medical facility that will be congruent with this project. An existing telecommunications structure onsite will be removed by others before construction.

The site has existing water and sanitary sewer connections nearby. Utility as-builts were not provided. However, the adjacent existing building has water and sanitary connections, likely extended from the main road.

2.3.1 HAZARDOUS MATERIALS AND CONTAMINATION

There is no prior knowledge of any hazardous materials at the site. However, it is possible that hazardous material may be found from previous use of the site, or that materials to be removed contain hazardous materials. If hazardous materials are found to exist, the Contractor shall immediately notify the COR, cease work in the area, and secure the site. The Contractor shall take precautions to protect the site from surface run-off and precipitation, and prevent leaching of any hazardous material in the surrounding area.

2.3.2 UNEXPLODED ORDINANCE (UXO) CLEARANCE

There is no knowledge of any UXO material on the available site. If any ordnance material is unexpectedly discovered though, the contractor shall immediately notify the COR, cease work and perform all measures he is required for as per applicable laws and regulations. Once notified of ordnance material, the COR will notify the appropriate authority which will then engage required measures for UXO clearance and unblock the concerned area for further construction work after clearance.

2.4 DESIGN SUBMITTALS

Provide civil design submittals after contract award in accordance with Section 010015, DESIGN AFTER AWARD and in compliance with the GENERAL REQUIREMENTS section of this SOW.

Provide a Design Analysis with discussion, calculations, and justification for design decisions for all project aspects and features. Reference all applicable documents, standards, and specifications used for the design. Reference sources are subject to Government approval. All calculations are to be conducted and documented in compliance with the applicable codes and criteria.

Provide civil design drawings of sufficient detail to address the requirements of each design submittal. Civil drawings shall include but are not limited to site plans, utility maps, regular and characteristic cross sections of pavements and utility runs, as well as a job site mobilization plan showing staging area, haul and access routes and any other features planned for contractor’s site mobilization.

Design drawings shall include all necessary information (labeling, dimensioning, legend, details, etc.) to allow for complete traceability of the layout of any planned feature. Provide comprehensible differentiation between features that are new, existing or planned to be demolished by use of appropriate choice of line styles and/or colors.

65% Design Submittal

- Preliminary Design Analysis of civil features.

- Final Site Survey.

- Final Geotechnical Report.

- Preliminary Site Layout Plans - Indicate existing and proposed Civil features, structures, utilities, and demolition required.

- Preliminary Grading Plans and Details, including contours, spot grades, finish floor elevation, and slopes.

- Preliminary Utility Plans and Profiles, and Details.

- Preliminary Pavement Plans, Profiles, Cross Sections, and Details of asphalt and concrete roadways, parking, and pedestrian paths.

- Preliminary Landscape Plan and Details.

- Preliminary Erosion and Sediment Control Plans and Details.

- Preliminary Mobilization Plans and Details.

- Preliminary Traffic Control Plan and Details.

- Preliminary Civil Specifications.

95% Design Submittal

- All items from the 65% Design Submittal requirements. All Preliminary submittals from 65% shall be updated to Final submittals in the 95% Design Submittal.

- Incorporate 65% design comments.

100% Submittal

- The 100% Submittal provides a complete and final set of contract documents ready for construction. All previous government review comments must have been addressed. Include all updated drawings, specifications and calculations from the 95% Submittal.

As Built Drawing Submittal

- Complete and final set of record drawings documenting site conditions based on a survey of the final construction performed by the Contractor.

- Shop drawings and details not included in the original design.

- Existing utility lines or structures (both modified and unmodified) encountered in the construction footprint that were not located on the original Site Survey.

CAD files of all construction drawings and as-built drawings shall be submitted in .dwg (latest AutoCAD version) and in .pdf format.

2.5 DESIGN CRITERIA

Civil design shall be in accordance with the design criteria outlined in the GENERAL REQUIREMENTS section of this SOW. In the absence of Host Nation Building Codes the Contractor shall use the International Building Codes (IBC) and/or the following U.S. Codes and Technical Standards and regulations

- UFC 3-201-01 - Civil Engineering

- ABA Accessibility Guidelines

- USACE Engineering Manual (EM) 385-1-1 Safety and Health Requirements

Uniform Facility Criteria (UFC) documents are available on the internet at:

http://www.wbdg.org/ccb/browse_cat.php?c=4

2.6 SITE SURVEY

Provide a survey from a licensed surveyor that includes all topographic and underground information needed to design and construct the project. The survey shall include location and elevation of all features within the project site limits, as well as all features outside of the site that will be connected into or included in the project scope of work. The survey shall include sufficient detail of the existing drainage (on-site and off-site) to allow for a proposed drainage design. The survey shall include the horizontal and vertical coordinate systems.

Site information provided to the Contractor by the Government is not to be considered accurate Site Survey information.

Upon completion of construction, the original survey shall be updated with an As-built survey of the site as constructed, including underground utility locations and depths. The As-built survey shall be submitted to the COR for approval.

2.7 GEOTECHNICAL INVESTIGATION AND REPORT

The Contractor shall be responsible for conducting a geotechnical investigation of the areas impacted by the project and shall provide an assessment regarding all geotechnical base data required for proper layout and construction of the planned facilities. All investigation work, laboratory testing of soils and aggregate materials, and identification and assessment of subsurface materials, shall be in accordance with applicable Host Nation standards, regulations, and practices.

The Contractor will perform the necessary test pits to collect soil samples at depths suitable for the anticipated loads. The Contractor shall perform laboratory testing on the obtained soil samples to determine all engineering properties required for proper layout and construction of the new facilities. The Contractor shall perform groundwater recordings and percolation tests as base of design for underground constructions, septic systems, drainage facilities, etc.

The report including results of the investigation and recommendations shall be provided to the COR prior to finalizing design features that are dependent upon soil condition and characteristics. The geotechnical report shall include, as a minimum, the following information:

- A description of site subsurface conditions and the regional geology and seismic conditions at the site.

- Test pit logs.

- Recommendations for allowable bearing capacity, expected settlement, type of foundation, minimum footing and grade beam dimensions, lateral earth pressure parameters, and minimum depth of foundation for footing and grade beams.

- Recommendations for preparation and compaction of onsite soils, including treatment required if soils are expansive, soil replacement, structural fill, and trench backfill placement procedures.

- Recommendations for pavement design and construction.

- Recommendations for the storm and septic systems.

- It shall include all pH tests, salinity tests, and resistivity measurements required to design grounding systems.

2.8 SITE LAYOUT

Attachment #2 – Site Plan of this SOW includes a site sketch that shows a feasible solution for the layout of the site which is to be considered as conceptual only. The site layout shall be amended as determined by the site-specific constraints, the owner’s preferences, handicapped accessibility requirements, and opportunities that shall be identified and evaluated as part of the Contractor’s scope of work.

Coordinate systems shall be labeled on the site plans.

2.9 CLEARING, GRUBBING, DEMOLITION AND REMOVAL

Any structure, utility, pavement, feature, or landscaping to be demolished shall be shown on the site plan. The Contractor shall stake-out the limits of disturbance before starting work. Demolition and removal work includes, but is not limited to:

existing structures like walls, foundations, slabs, pavements, utilities, other building elements, and trench excavation.

Clearing and grubbing of vegetation includes, but is not limited to: trees, roots larger than 75 mm in diameter, shrubs and other landscaping obstacles that obtrude, encroach upon, or otherwise obstruct the work.

All features within the site construction areas planned to remain in place shall be properly protected during construction work.

Any damages by the Contractor shall be, irrespective of the degree of damage, replaced in accordance with Host Nation regulations at the Contractor’s expense and at the entire satisfaction of the COR.

Contractor is responsible for the disposal of all construction debris. Burning of debris is prohibited.

Prior to construction, the Contractor shall install erosion control measures and best management practices (BMPs) as required by the regulating authority. BMPs shall be maintained throughout the construction contract and shall be removed upon project completion.

2.10 EARTHWORK

The Contractor shall perform any earth work necessary for proper replacement, relocation or new construction of foundations, structures, pavements, septic systems, storm water facilities and utility lines as well as for proper construction of slopes, berms, grades, cut and fill and planned site grading as specified in the contractors final design plans.

The Contractor is responsible for defining earthwork requirements in the Contractor-provided site-specific geotechnical report and the Contractor-provided specifications. This includes provisions for compaction, replacement, and improvement of on-site soils to achieve proper parameters for settlement, swell, bearing capacity and deformation modulus within applicable standards for structure, pavement, and utility construction. The Contractor shall provide engineered support systems as required for the construction of temporary and permanent earth structures such as slopes, utility trenches, constructions pits and any other structure requiring earth support.

The Contractor shall be responsible for all dewatering necessary for earthwork.

Excavated material, if satisfactory for reuse per the geotechnical report, may be used on the project site where fill is required.

Unsatisfactory material, and surplus excavated material not required for fill, shall be disposed of offsite, and shall be the responsibility of the Contractor.

Borrow material may be required for construction from sources off site. Borrow materials are to be free of hazardous materials and contaminants. Any soil brought in from off-site sources needs to be certified clean borrow or tested prior to use for adverse contaminants above regulatory criteria.

Control Tests shall be performed on all prepared sub-grades and compacted fill in accordance with local codes. The location and frequency of all tests shall be selected by the Contractor, and copies of all test results shall be furnished to the COR.

During construction, all foundation excavations shall be inspected and approved by the Contractor’s professional geotechnical engineer prior to placing concrete.

2.10.1 UTILITY TRENCHES

Utility line depths, bedding, and cover shall be as required by appropriate Host Nation standards. New and relocated utilities shall be laid in sufficient depth below surfaces such that they cannot be damaged by the expected vehicular/pedestrian traffic or freezing. Lines installed with less cover than the minimums as required per applicable standards shall be concrete encased.

Standard, resilient, plastic warning tape shall be placed along the route of the buried lines after pipe installation at a height of 30 cm above the line.

Any existing utilities encountered within the site boundary that are impacted by this project shall be secured, or relocated if securing is not feasible. The contractor is required to ensure uninterrupted operation of all utilities serving other facilities.

Utilities impacted by this project that need to be decommissioned, or that are already out of service, shall be removed.

Manholes to be abandoned shall be reduced to 50 cm below final new ground level and filled with earth that is to be adequately compacted. Include decommissioned utilities on as-built drawings.

2.10.2 SITE GRADING

Provide Site Grading that directs storm water runoff away from buildings and structures either by drainage systems or by grading as follows:

- Finished grades of earth/grass/gravel surfaces adjacent to buildings and structures shall slope away from all exterior edges with a gradient of min. 5% for the first 3 meters.

- Finished grades of paved surfaces adjacent to buildings and structures shall slope away from all exterior walls with a gradient of min. 2% for the first 3 meters.

- Finished grades shall not create stagnating water or ponding anywhere on the project site, nor create ponding on adjacent properties.

- Building finish floor elevations shall be set at a minimum of 30cm above the local 100 year flood level.

Site grading around the building shall meet local accessibility guidelines. The Contractor shall limit proposed landscape slopes to a maximum 2H:1V, or as recommended by the Geotechnical Report. Site Grading shall not cause ponding off-site.

Provide a retaining wall where necessary to meet site grading requirements. If retaining wall is over 1m high, provide structural calculations.

2.11 0 STORM SYSTEM

Provide a storm drainage system to direct runoff away from improvements and eliminate ponding. Building roofs shall have gutters and downspouts connected to a storm drainage system. The storm drainage system shall discharge to an existing storm drainage conveyance system with capacity, or infiltrate on-site away from structures and future improvements. If the absence of host nation standards, the storm drainage system will be designed for a minimum 10-year return storm frequency.

2.12 SANITARY SYSTEM

Provide a sanitary system with capacity to discharge the building’s sanitary system to the sanitary main. There shall be a minimum of 3 meters clear horizontal separation between water pipes and sewer pipes. If this clearance is not possible, encase the sanitary line in concrete when less than 3 meters from the water line. In the case where water line and sewer line intersect, concrete encasement is not required. However, the water line shall be located above the sewer line.

2.13 WATER SYSTEM

See MECHANICAL DESIGN Section.

2.14 PAVEMENT (OPTION #4)

Provide an asphalt or Portland Cement Concrete (PCC) driveway for patient drop-off and deliveries. Provide concrete sidewalks around the building and connecting the proposed facility with the existing medical clinic building and existing parking lot. Provide ABA sidewalk ramps as needed to connect proposed driveway and building, and to connect proposed sidewalks to the existing building and parking area. See Attachment #2 – Site Plan.

Contractor’s design of new pavement and its implementation shall generally consider the types of vehicles traversing and parking on the planned pavements, their proposed amount of traffic, the design speed and any other types of stress provisioned on the planned pavements, and in consideration of the results and recommendations of the geotechnical report.

The contractor shall consider the variation in temperature throughout the year in this location/region. Contractor shall ensure that the pavement can withstand (retain both its structural and aesthetic integrity) the shrinkage and expansion effects associated with these temperature variations.

Contractor shall provide sub grade compaction tests, pavement density tests, thickness and evenness tests. The location and frequency of all tests, and the layers to be tested, shall be selected by the COR, and copies of all test results shall be furnished to the COR.

2.15 LANDSCAPING

Re-graded green areas shall be top-soiled and seeded, as shall any existing vegetated areas disturbed during construction that have not been built or paved upon. Seeds shall be locally sourced from a certified plant nursery, and native to the area. Any restrictions in the times of the year in which planting can be performed shall be as in local regulations. Grassed areas which do not have new growth coverage of 75% shall replace topsoil and seeds.

Before using chemicals during landscaping work, including for use on plants and on site features, the Contractor shall submit to the COR, in the form of brochures, certificates and other technical material, information about the chemicals proposed, including about their environmental compatibility. Their use is only permitted with approval of the COR.

2.16 FENCE

A fence is not required.

3.1 ARCHITECTURAL

3.2 PROJECT DESCRIPTION

Design and construction work of new Multiple Sclerosis Therapy Center in Vrujci, Serbia. The facility shall consist of a two-story masonry / concrete building with sloped roof. The facility shall accommodate 20 patients and 10 employees.

Extensive coordination will be required between the architectural work and the civil, geotechnical, structural, fire protection, mechanical, and electrical requirements of this project.

3.2.1 DRAWINGS

The Contractor shall develop a design based on the functional adjacencies and space allocations given in the RFP. The design shall incorporate all referenced codes and regulations. The Contractor shall provide a design and construction package that uses the design details and features given or referenced in this RFP. Additional details shall be created by the Contractor as required, but shall conform to the requirements of this RFP and are subject to the approval of the COR.

3.2.2 DESIGN SUBMITTALS

The contractor shall make the architectural submittals after contract award in accordance with Section 010015, DESIGN

AFTER AWARD.

3.2.2.1 DESIGN SUBMITTALS SUBMISSION

65% Submission: Include the following drawings and reports as applicable to the project:

• Floor Plans – Provide all floor plans, indicating room names and basic dimensions.

• Building Elevations – Provide all building elevations indicating all exterior materials.

• Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.

• Building Section – Indicate heights of critical building elements.

• Wall Section - Provide a typical wall section for each building – describe wall materials.

• Outline Specification in format which is typically sent to sub-contractors.

95% Submission: The 95% Submittal provides a complete and final set of contract documents essentially ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include the following drawings as applicable to the project:

• Floor Plans – Provide all floor plans, indicating room names and dimensions.

• Building Elevations – Provide all building elevations indicating all exterior materials.

• Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.

• Building Section – Indicate heights.

• Wall Sections – Provide sufficient wall section(s) to indicate all materials and different conditions.

• Section and Plan Details, Interior elevations.

• Finish Schedule – Indicate all proposed finishes.

• Furniture/Equipment Plan.

• Color Board: Provide a material and color board.

• Detailed specification with line items in format which is typically sent to sub-contractors.

100% Submission: The 100% Submittal provides a complete and final set of contract documents ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include all updated drawings, specifications and calculations from the 95% Submittal.

3.2 2 TECHNICAL CRITERIA AND STANDARDS

Project design shall be in accordance with the requirements outlined in section 1.7.

3.2.1 LIFE SAFETY REQUIREMENTS

The Contractor shall meet all Host Nation and local Fire Suppression System codes and requirements. All structures to be provided shall have exits and means of egress that comply with current Host Nation codes and standards.

3.2.2 HANDICAPPED ACCESSIBILITY REQUIREMENTS

The facility shall be handicapped accessible in compliance with Host Nation codes and requirements. Minimum hallway clear width for hospital beds movement shall be 220 cm. Minimum door clear width for hospital beds movement shall be 115 cm.

3.3 GENERAL SCOPE OF WORK

The architectural elements of this facility shall be designed to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow and earthquake conditions. All architectural features shall be appropriately braced for anticipated seismic activity. The Contractor shall have flexibility to propose alternate building materials to meet the facility’s requirements, but final selection of materials shall be subject to the approval of the COR.

Materials and building systems shall be selected with consideration given to economics not only in the initial acquisition, but also in the future maintenance of the materials when incorporated into the work.

3.4 DETAILED SCOPE OF WORK

The contractor shall be responsible for the following specific task required for the construction of this facility.

3.4.1 DEMOLITION

The Contractor shall be responsible for all required demolition as indicated in this scope. The contractor shall execute demolition work in accordance with RFP Section 02 41 00, Demolition.

3.4.2 UILDING SYSTEM AND MATERIALS

The intent of this RFP is to allow the contractor the maximum flexibility to design and construct this facility in an economical manner without sacrificing good engineering practices, quality materials and systems. The Government would like low or no maintenance finish materials to the greatest extent possible. Building materials as described herein for roofing, walls, ceilings, doors, windows and floors are minimum requirements and may require revision based on code compliance and criteria.

Light-gauge steel frame or a pre-engineered metal structure is NOT acceptable.

3.4.2.1 FIRE PROTECTION RATINGS

All finishes shall conform to Host Nation fire protection standards/requirements.

3.4.2.2 ACOUSTICAL DESIGN

Walls shall meet the minimum sound protection per Host Nation requirements.

3.4.3 EXTERIOR CONSTRUCTION WORK

3.4.3.1 BUILDING STRUCTURE

Provide main building and utility / heating structure exterior solid walls, slabs, foundations and other elements in accordance with structural section of this RFP.

3.4.3.2 EXTERIOR WALL INSULATION FINISH SYSTEM (EIFS)

Provide new exterior insulation finish system (EIFS) with new polystyrene thermal insulation, stucco and paint. Install exterior insulation system consisting of insulation boards, to include mineral lightweight plaster and fiberglass reinforcing net IAW Host Nation Energy Conservation Codes and Requirements. Also install EIFS system on the building base.

Additionally dowel the boards.

This is the start of the file's text. The full file is on GovTribe.