00 73 15.02 Government Resident Office.pdf

PDF 23 KB Posted

Attached to
Construction of Multiple Sclerosis Therapy Center Vrujci, Serbia
Solicitation number
W912GB-17-R-0042
Issued by

About this file

Government resident office

View the file

Other files

File Type Posted
W912GB-17-R-0042_Amendment_02.pdf PDF
Amendment_01.zip ZIP file
Attach 2 Exp Info Sheet 17-R-0042.docx DOCX document
01525 Safety and Occupational Health Requirements for Projects in Emerging Countries —
02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
Attach 3 PPQ 17-R-0042.docx DOCX document
01 33 00 Submittal Procedures.pdf PDF
01 35 26 Safety and Occupational Health Requirements —
Attach 6 BLA Sample Template.docx DOCX document
01 32 01.00 10 Project Schedule.pdf PDF
01 78 00 Completion Procedures.pdf PDF
Attach 8 Resume.docx DOCX document
Solicitation W912GB-17-R-0042.pdf PDF
A.01.38_Attachment_1_Location Map.pdf PDF
01 45 01.01 Additional Quality Control Personnel.pdf PDF
Attach 1 Overview Exp 17-R-0042 .docx DOCX document
Attach 4 Price schedule.docx DOCX document
Attach 5 BLG Sample Template.docx DOCX document
00 73 15.01 Government Field Office.pdf PDF
01 45 01.10 USACE QUALITY CONTROL SYSTEM —
00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
Attach 7 Letter of Commitment.docx DOCX document
02 41 00 Demolition and Deconstruction.pdf PDF
A.01.38_Attachment_4_Arch.pdf PDF
01 45 01 USACE Quality Control.pdf PDF
A.01.38_Attachment_2_Site Plan.pdf PDF
01 00 15 Design After Award.pdf PDF
A.01.38_Attachment_5.pdf PDF
A.01.38_Attachment_3_Site Photos.pdf PDF
Construction Signs.pdf PDF
00 73 15 General Conditions —
01 78 23 Operation and Maintenance Data.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 73 15.02

GOVERNMENT RESIDENT OFFICE

(06/11)

PART 1 GENERAL

1.1 General

The work covered by this section consists of furnishing all labor, materials, equipment, and services and performing all work required for or incidental to the items herein specified. No separate payment will be made for the construction and services required by this section, and all costs in connection therewith shall be included in the overall cost of the work unless specifically stated otherwise.

This specification does not establish the requirements for the contractors site facilities; the contractor is responsible for providing adequate site facilities for the use of their personnel in accordance with other contract terms and conditions.

1.2 Government Resident Office

The contractor shall be responsible for providing an office for the sole use of government personnel, in a structure physically separated from the contractor’s site offices, and shall be maintained in good condition by the Contractor until completion of all work under this contract.

Facility shall be furnished at a location designated by the Contracting Officer, approved by the Contracting Officer, and available for use concurrent with availability of Contractor's site office or within 15 calendar days of Notice to Proceed, whichever occurs first.

1.2.1 Office

The Contractor shall provide the Government with an office with a minimum of 175 square meters in floor area, with no dimension of the facility less than

4.5 meters. The office shall contain, at a minimum:

• Ten (10) individual office areas, including one office for secretarial services which shall be located within an area common to each office

• One (1) Resident Engineers office

• One (1) common area

• One (1) Computer server area

• One (1) conference room with interior doors to the common area

• Two (2) enclosed storage room not less 3m x 3m

• Toilet facilities

The walls and ceiling of the office shall be insulated. All windows shall be screened. The windows shall be openable and be securely fastened from the inside. Glass panels in windows shall be protected by bars or heavy mesh screens to prevent easy access to the building through these panels.

Each office shall contain at least one window, and, with the exception of the secretarial office, shall be individually lockable with a door and individually keyed lockset with two keys. Additionally, a master-key and

SECTION 00 73 15.02 GOVERNMENT RESIDENT OFFICE (06/11)

two copies shall be provided which will open every door in the office.

Every room in the facility shall have at least one battery operated smoke detector (contractor shall provide and replace batteries in each smoke detector at least twice yearly) and at least four (4) standard electrical outlets meeting local requirements. In addition, the common shall also provide for delivery of a minimum 3000 Watts in current at 110 Volts. This may be provided either via 110V outlets where this is available, or via transformers. If transformers are provided, they shall be new, of approved construction, and contain a visible power switch.

The office shall contain an integral toilet facility with western-type (with a push-type flush button) toilet fixture (bowl) which shall hold water in it at all times, a wash basin, and a shower with shower tub. The shower head and faucet will be supplied with hot water. The toilet facility shall be supplied by liquid soap, toilet paper, and paper towel for daily use.

Adequate quantity of these supplies shall be maintained on site and replaced as needed.

The office facility shall contain a kitchenette type facility with a counter top/work area with a minimum surface area of 55cm (W) by 150 cm (L). In addition to the work area, the facility shall include a utility sink and faucet supplying both hot and cold water. A minimum of two electrical outlets (local current) shall be located adjacent to the counter top.

The office facility, including all furniture, equipment, and connections, will remain the property of the Contractor and, upon completion of work under this contract, shall be removed from the site by the Contractor and the site returned as nearly as practical to the original conditions.

1.2.2 Furniture and Supplies

The contractor shall furnish the office with the following equipment. All furnishing shall be new and manufactured by a recognized supplier of office equipment. All items shall be assembled, installed, and maintained by the contractor.

• One desk (minimum 80 cm x 150 cm) double pedestal with lockable drawers for each office area

• Two desk chairs for each office area with arms, swivel tilt, hydraulic height-adjustable, medium back, fabric covered seat cushion, castored

• Conference table(s) with a minimum dimension of 400 cm x 175 cm, not less than fifteen new arm-chairs, castored (for conference room)

• One conference table (minimum 100 cm x 200 cm), not less than five new arm-chairs, castored (for Resident Engineers Office)

• Ten file cabinets, capable of holding US letter-size documents, with a minimum five drawers each

• Two bookcases with a minimum of five shelves each. Minimum dimensions are 120 cm (W) x 200 cm (H) x 30 cm (D).

• A clock, wall hung, quartz, minimum 12” dial, battery powered.

• Plan racks capable of holding three full-size set of contract plans.

• Provide a dry-erase board with a minimum dimension of 1.5 m by 1.0 m.

Dry erase markers (minimum four different colors) shall be provided and replaced as depleted.

• Microwave (minimum 0.028 cubic meter )

• Refrigerator (minimum 0.70 cubic meter)

The contractor shall not be responsible for providing office supplies, including computers, copiers, telephones, or paper except as specifically identified in other specifications or the scope of work.

1.2.3 Lighting Requirements

The office facility shall include suitable electric lighting to meet the minimum lighting requirements (luminance) of Administrative areas as indicated in EM385-1-1.

1.2.4 Heating/Cooling Requirements

The contractor shall be responsible for providing heating and cooling capable of maintaining an interior temperature of between 16° Celsius and 25° Celsius in all seasons.

Refrigerant (if applicable) shall be one of the fluorocarbon gases that has an Ozone Depletion Potential (ODP) of less than or equal to 0.05.

1.3 Utilities

The contractor shall provide connections to all utilities, including water, sewer, and electric mains. Exterior utilities shall be permanently installed and connected with existing utilities or generator. Exposed utilities shall be insulated to prevent freezing. Contractor shall ensure an adequate hot water supply is available such as through the use of water heaters. All utility connections shall be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.

If electrical service is not available in the immediate vicinity the contractor may request, subject to approval of the Contracting Officer, the use of generator(s) to provide electrical service. If approved, the contractor shall be responsible for providing all fuel, maintenance, and other services necessary to maintain electrical service during all hours the contractor is on site.

1.3.1 Drinking Water

The contractor shall ensure potable drinking water is available for the facility that meets or exceeds US Drinking Water standards.

http://water.epa.gov/drink/index.cfm

1.3.2 Telephone

The contractor shall provide telephone installation and connection to telephone service, including telephone equipment (phones), unless no telephone service is available within 10 km of the project site and installation of telephone utilities is not included in the scope of work of this contract.

The contractor shall be responsible for all connection and installation fees. Costs for telephone service, including basic or “monthly” service, and additional services, such as DSL, shall be the responsibility of the Government.

1.3.3 Data Connection

The office shall be pre-wired with 100BaseT cable for a computer network with a minimum of one two drops per room. All cables shall run to the server area.

The contractor shall provide DSL connectivity at a minimum of 2 Mbps/512 Kbps ADSL with a fixed static IP address. All network cables designated for Corps offices will be ran back to the ADSL origination point.

1.4 Vehicle Access and Parking

The Contractor shall provide access and a shaded parking area for ten vehicles adjacent to the Government Office.

1.5 Maintenance

The contractor shall provide all maintenance and janitorial services, to include emptying of trash at least twice a week and cleaning of the office, including the toilet facilities, weekly.

1.6 Security Requirements

The physical security of the Government personnel, their property, and their office shall be the responsibility of the Contractor throughout the duration of the contract.

If the project site is outside of the controlled area of an existing military installation, the field office compounds for Government employees shall have 30 meters standoff from a fence enclosing the office and all parking or roads. Additional fencing, earth berms, concrete barriers, controlled access points and the like should be provided to limit access to the site and provide additional building standoff or security

1.7 RELOCATION

The Contractor shall locate the facility such that it will not require relocation to accommodate the sequence of construction.

-- End of Section --

PART 1 GENERAL
1.1 General
1.2 Government Resident Office
1.2.1 Office
1.2.2 Furniture and Supplies
1.2.3 Lighting Requirements
1.2.4 Heating/Cooling Requirements
1.3 Utilities
1.3.1 Drinking Water
1.3.2 Telephone
1.3.3 Data Connection
1.4 Vehicle Access and Parking
1.5 Maintenance
1.6 Security Requirements
1.7 RELOCATION