Text version
The Offeror shall price on all base and option items. Provide completion of all design and construction of award items from the Notice to Proceed as described in the contract FAR Clause 52.211-10 “ COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK” according to the following schedule. Each CLIN duration is as per the price schedule and the calendar days are from issuance of the Notice to Proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance.
See FAR Clause 52.211-12 for Liquidated Damages. Liquidated damages apply to any completion date specified in the contract or Price Schedule including interim completion dates for individual facilities.
Base Period of Performance: The base period of performance is 365 calendar days from issuance of the notice to proceed (NTP). The contractor shall have the project fully functional and available for normal, regular use no later than the end date of the period of performance to ensure the patients can utilize the space.
Award of Options and Period of Performance: The Government reserves the right to award any or all options up to 90 calendar days following issuance of NTP for the base bid work. Any optional work awarded shall be completed as noted within a particular CLIN, as described in contract FAR Clause 52.211-10 “COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK”. If an option is exercised, they must be completed within the base period of performance of 365 calendar days.
This project is a Design-Build and the contractor shall be required to prepare a detailed design as well as provide for construction of the project.
Allowable Work Hours: The allowable working hours are from 0800-1900 Local Time, Monday through Saturday. Work on US and Serbian holidays and outside of these hours shall not be performed without prior approval from the Contracting Officer. Office hours for coordination with Government representatives are from 0730-1600 hours, except U.S. holidays.
Prices: All prices are to be proposed in U.S. Dollars.
BASE ITEMS:
CLIN 0001
Construct MS Treatment Center
| Design: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall consist of a masonry / concrete building with sloped roof and a detached utility / heating structure with a mechanical room. The facility shall accommodate 12 patients and 10 employees. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| Construction: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall consist of a masonry / concrete building with sloped roof and a detached utility / heating structure with a mechanical room. The facility shall accommodate 12 patients and 10 employees. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| BASE ITEMS TOTAL: |
| $____________ |
OPTIONAL ITEMS:
CLIN 0002
Option Item 1 – Additional 4 Patient Capacity
| Design: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| Construction: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications. |
| $___________ |
CLIN 0003
Option Item 2 – Additional 4 Patient Capacity
| Design: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| Construction: All work associated with the design of a new treatment center to be used by the Multiple Sclerosis Society in Serbia. The facility shall accommodate an additional 4 patients. All work shall be built as described in the statement of work and specifications. |
| $___________ |
CLIN 0004
Option Item 3 – Elevator System
| Design: All work associated with the design of an elevator system to serve the two floors. Elevator shall have interior doors at two levels The elevator car shall be suitable for hospital bed transport and shall have internal size of 1400 x 2400 mm. The load capacity shall be a minimum of 1600 kg. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| Construction: All work associated with the construction of an elevator system to serve the two floors. Elevator shall have interior doors at two levels The elevator car shall be suitable for hospital bed transport and shall have internal size of 1400 x 2400 mm. The load capacity shall be a minimum of 1600 kg. All work shall be built as described in the statement of work and specifications. |
| $___________ |
CLIN 0005
Option Item 4 – Pavements
| Design: All work associated with the design of a concrete driveway in front of the building, concrete sidewalks around the building and connecting the facility with existing facilities and parking lot. All work shall be built as described in the statement of work and specifications. |
| $____________ |
| Construction: All work associated with the construction of a concrete driveway in front of the building, concrete sidewalks around the building and connecting the facility with existing facilities and parking lot. All work shall be built as described in the statement of work and specifications. |
| $___________ |
OPTION ITEMS TOTAL:
| TOTAL PRICE – ALL BASE AND OPTION ITEMS: |
| $____________ |
PRICE SCHEDULE
Request for Proposal (RFP) Construct MS Treatment Center Vrujci, Serbia