A.07.24.02_Amend_02__R_17-R-0017.pdf

PDF 22 KB Posted

Attached to
FISCAL YEAR 2017 MATOC FOR GERMANY, BELGIUM, AND THE NETHERLANDS
Solicitation number
W912GB-17-R-0017
Issued by

About this file

Amendment 02

View the file

Other files

File Type Posted
A.07.24.02_Amend_02_Sol_Attach_3_PPQ_REV_17-R-0017.docx DOCX document
A.07.24.02_Amend_02_Sol_BLG_Rev_Final_17-R-0017.docx DOCX document
A.07.24.01_Amend_01_R-E_17-R-0017.pdf PDF
A.01.24_01 33 00 Submittal Procedures.pdf PDF
A.07.23.04 Sol Attach 3 PPQ 17-R-0017.docx DOCX document
A.01.24_00 73 15 General Conditions —
A.01.24_01 35 26.10 Additional Safety and Occupational Health Requirements for Projects in the European Union.pdf PDF
A.07.23 00 41 00 Pricing Schedule 17-R-0017.xlsx XLSX spreadsheet
A.01.24_02 41 00 Demolition and Deconstruction.pdf PDF
A.01.24_00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.01.24_01 00 15 Design After Award.pdf PDF
A.01.13 DIN Conversion to European Standard.pdf PDF
A.01.24_01 32 01.00 10 Project Schedule.pdf PDF
A.01.24_02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
A.01.24_EP-310-1-6a Construction Signs _Deutsch_.pdf PDF
A.01.24_01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.07.23.02 Sol Attach 1 ExpOverviewSheet 17-R-0017.docx DOCX document
A.07.23.03 Sol Attach2 ExpInfoSheet 17-R-0017.docx DOCX document
A.01.24_01 35 26 Safety and Occupational Health Requirements —
A.07.23 Solicitation R W912GB-17-R-0017.pdf PDF
A.01.24_01 45 01 USACE Quality Control.pdf PDF
A.01.13 UPB_Germany_Italy_Europe_2015-2005.PDF PDF
A.01.24_01 78 23 Operation and Maintenance Data.pdf PDF
A.01.24_01 78 00 Completion Procedures.pdf PDF
A.01.24_EP-310-1-6a Construction Signs.pdf PDF
A.01.13 Supplement to 2015 JOC UPB.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FISCAL YEAR 2017 DE, BE, NL MATOC

A. The purpose of this amendment is to provide responses to submitted questions (RFIs), provide a revised/corrected Attachment 03 (PPQ) and a revised Bank Letter of Guarantee template (as attachment).

B. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Apr-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB-17-R-0017

X 9B. DATED (SEE ITEM 11)

17-Mar-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Apr-2017

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB-17-R-0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIRMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIRMENTS

The following have been added by full text:

REQUESTS FOR INFORMATION (A2)

Question 1: Reference: Planned works under the MATOC frame contract. Could the Government please list some of the planned projects for this frame contract? We are not inquiring about specifics and classified information. Rather, we are interested in the prevailing work disciplines (%electrical, %mechanical, %structural), or project titles that would also help us understand oncoming workload. This information will greatly support us in the planning of our resources for this contract. It will also help us submit a realistic and logical management approach at Phase I.

Answer 1: The Government does not track historical projects by discipline. The scope of work accurately reflects the types of work that can be anticipated under this solicitation. During FY2016 the following types of projects were performed: design-build building repairs, renovations of general buildings, renovations of barracks, renovation of warehouses, renovation of child development centers, etc.

Question 2: Planned Garrisons under the MATOC frame contract. Could the Government please list the top 3 Garrisons in which a large workload is planned? This information will greatly support us in the planning of our resources for this contract, and will help us submit a realistic and logical management approach for Phase I.

Answer 2: The Government expects that all of the geographic areas identified under the scope of work will have projects during the performance period.

The Government cannot rank Garrisons by workload.

Question 3: Due to the big amount of changes (Page extension for the Management Approach, different Type of sample projects etc.) provided with amendment 0001 we request at least an additional week to set up/ revise our proposal to match the solicitation requirements.

Answer 3: The proposal due date of Monday 24 April 2017 remains unchanged. There is more than 10 days remaining which is adequate time for electronic submission.

Question 4: Reference Proposal Format Instructions to Phase I, Factor 2 – Past Performance, Submission Requirements (page 11 of 77): The solicitation requires that the provided Past Performance Questionnaire (PPQ), Attachment 3, must be filled out by Offeror and client. The provided Past Performance Questionnaire (PPQ), Attachment 3, has an error Table 5. Cost / Financial Management d.) and e.)

should be YES or NO answers as in the previous PPQs. Please provide Offerors with a revised PPQ, Answer 4: Form has been corrected. A revised Attachment 3 (PPQ) has been provided as part of this amendment.

W912GB-17-R-0017

Attachment 3.

Question 5: Amendment 0001, Factor 2 Past Performance, para 2. (pg 12 of 55) states “Offerors may provide a completed Department of Defense, DD2626 form or a Contractor Performance Assessment Report (CPAR), in lieu of Attachment

3. CPARS evaluations and DD2626s shall be signed by all designated authorities for consideration of evaluation.” Please confirm if a completed DD2626 or CPARS can be submitted with the Volume I proposal in lieu of Attachment 3 for projects provided in Factor 1: Experience?

Answer 5: Yes. A completed DD2626 or CPARS can be submitted with the Volume I proposal in lieu of an Attachment 3 (PPQ).

(End of Summary of Changes)

File details come from the government source that posted it. Updated .