A.07.23 00 41 00 Pricing Schedule 17-R-0017.xlsx

XLSX spreadsheet 67 KB Posted

Attached to
FISCAL YEAR 2017 MATOC FOR GERMANY, BELGIUM, AND THE NETHERLANDS
Solicitation number
W912GB-17-R-0017
Issued by

About this file

Pricing Schedule

View the file

Other files

File Type Posted
A.07.24.02_Amend_02__R_17-R-0017.pdf PDF
A.07.24.02_Amend_02_Sol_Attach_3_PPQ_REV_17-R-0017.docx DOCX document
A.07.24.02_Amend_02_Sol_BLG_Rev_Final_17-R-0017.docx DOCX document
A.07.24.01_Amend_01_R-E_17-R-0017.pdf PDF
A.01.24_01 33 00 Submittal Procedures.pdf PDF
A.07.23.04 Sol Attach 3 PPQ 17-R-0017.docx DOCX document
A.01.24_00 73 15 General Conditions —
A.01.24_01 35 26.10 Additional Safety and Occupational Health Requirements for Projects in the European Union.pdf PDF
A.01.24_02 41 00 Demolition and Deconstruction.pdf PDF
A.01.24_00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.01.24_01 00 15 Design After Award.pdf PDF
A.01.13 DIN Conversion to European Standard.pdf PDF
A.01.24_01 32 01.00 10 Project Schedule.pdf PDF
A.01.24_02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
A.01.24_EP-310-1-6a Construction Signs _Deutsch_.pdf PDF
A.01.24_01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.07.23.02 Sol Attach 1 ExpOverviewSheet 17-R-0017.docx DOCX document
A.07.23.03 Sol Attach2 ExpInfoSheet 17-R-0017.docx DOCX document
A.01.24_01 35 26 Safety and Occupational Health Requirements —
A.07.23 Solicitation R W912GB-17-R-0017.pdf PDF
A.01.24_01 45 01 USACE Quality Control.pdf PDF
A.01.13 UPB_Germany_Italy_Europe_2015-2005.PDF PDF
A.01.24_01 78 23 Operation and Maintenance Data.pdf PDF
A.01.24_01 78 00 Completion Procedures.pdf PDF
A.01.24_EP-310-1-6a Construction Signs.pdf PDF
A.01.13 Supplement to 2015 JOC UPB.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period (YR 01)

DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE
BASE PERIOD (YEAR 01)
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
10115Road construction works80.00
10250Plaster, gypsum and stucco work80.00
10355Joinery works80.00
10460Metal construction and locksmith80.00
10563Painting and Wallpaper works80.00
10665Floor covering works80.00
10780Heating plants and central industrial water80.00
10882Electrical work80.00
Category 2:Books Ordered Often
109Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
110Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00
Category 4:Non-Pre Priced Coefficient
111Coefficient for Non-Pre Priced Items

Base Period (YR 02)

DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE
BASE PERIOD (YEAR 02)
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
20115Road construction works80.00
20250Plaster, gypsum and stucco work80.00
20355Joinery works80.00
20460Metal construction and locksmith80.00
20563Painting and Wallpaper works80.00
20665Floor covering works80.00
20780Heating plants and central industrial water80.00
20882Electrical work80.00
Category 2:Books Ordered Often
209Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
210Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00
Category 4:Non-Pre Priced Coefficient
211Coefficient for Non-Pre Priced Items

Base Period (YR 03)

DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE
BASE PERIOD (YEAR 03)
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
30115Road construction works80.00
30250Plaster, gypsum and stucco work80.00
30355Joinery works80.00
30460Metal construction and locksmith80.00
30563Painting and Wallpaper works80.00
30665Floor covering works80.00
30780Heating plants and central industrial water80.00
30882Electrical work80.00
Category 2:Books Ordered Often
309Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
310Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00
Category 4:Non-Pre Priced Coefficient
311Coefficient for Non-Pre Priced Items

Option Period 01 (YR 04)

DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE
OPTION PERIOD 1 (Year 4)
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
40115Road construction works80.00
40250Plaster, gypsum and stucco work80.00
40355Joinery works80.00
40460Metal construction and locksmith80.00
40563Painting and Wallpaper works80.00
40665Floor covering works80.00
40780Heating plants and central industrial water80.00
40882Electrical work80.00
Category 2:Books Ordered Often
409Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
410Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00
Category 4:Non-Pre Priced Coefficient
411Coefficient for Non-Pre Priced Items

Option Period 02 (YR 05)

DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE
OPTION PERIOD 2 (Year 5)
Line Item No.Book No.DescriptionCoefficientWeight FactorLine Item Weight
(1)(2)(3)(4)(5)(6)
Category 1:Books Ordered Most OftenNOTE: Offeror is required to bid on each book individually in this category.
50115Road construction works80.00
50250Plaster, gypsum and stucco work80.00
50355Joinery works80.00
50460Metal construction and locksmith80.00
50563Painting and Wallpaper works80.00
50665Floor covering works80.00
50780Heating plants and central industrial water80.00
50882Electrical work80.00
Category 2:Books Ordered Often
509Coefficient for all books listed below this line: (11 Books)60.00
00EarthworksNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
30Masonry works
31Concrete and reinforced concrete works
34Carpentry and wood construction works
38Roofing and roof sealing works
39Flashing and sheet metal works
52Tile and slab works
53Screed works
57Hardware works
61Glazing works
81Gas, water and sewer installation work
Category 3:Books Ordered Least Often
510Coefficient for all books listed below this line: (11 Books)20.00
06Sewer WorkNOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered.
07Underground Pressure Pipeline Work
08Drainage and drainage works
20Landscaping Work
21Insulation works on technical systems
51Scaffolding
54Asphalt Paving Work
56Wood flooring works
79Room Ventilation Work
84Lightning protection systems
98Asbestos removal works
BOTTOM LINE SUM0.00
Category 4:Non-Pre Priced Coefficient
511Coefficient for Non-Pre Priced Items

Total Bottom Line Sum

SECTION 00 41 00 PRICING SCHEDULE
FY17 DE, BE, NL MATOC
Bottom Line Sum Base Period (YEAR 01)0.00
Bottom Line Sum Base Period (YEAR 02)0.00
Bottom Line Sum Base Period (YEAR 03)0.00
Bottom Line Sum Option Period 01 (YEAR 04)0.00
Bottom Line Sum Option Period 02 (YEAR 05)0.00
Total Bottom Line Sum0.00