A.07.23 00 41 00 Pricing Schedule 17-R-0017.xlsx
XLSX spreadsheet 67 KB Posted
- Solicitation number
- W912GB-17-R-0017
About this file
Pricing Schedule
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period (YR 01)
| DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE | |||||
| BASE PERIOD (YEAR 01) | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 101 | 15 | Road construction works | 8 | 0.00 | |
| 102 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 103 | 55 | Joinery works | 8 | 0.00 | |
| 104 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 105 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 106 | 65 | Floor covering works | 8 | 0.00 | |
| 107 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 108 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 109 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 110 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 | ||||
| Category 4: | Non-Pre Priced Coefficient | ||||
| 111 | Coefficient for Non-Pre Priced Items |
Base Period (YR 02)
| DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE | |||||
| BASE PERIOD (YEAR 02) | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 201 | 15 | Road construction works | 8 | 0.00 | |
| 202 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 203 | 55 | Joinery works | 8 | 0.00 | |
| 204 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 205 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 206 | 65 | Floor covering works | 8 | 0.00 | |
| 207 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 208 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 209 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 210 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 | ||||
| Category 4: | Non-Pre Priced Coefficient | ||||
| 211 | Coefficient for Non-Pre Priced Items |
Base Period (YR 03)
| DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE | |||||
| BASE PERIOD (YEAR 03) | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 301 | 15 | Road construction works | 8 | 0.00 | |
| 302 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 303 | 55 | Joinery works | 8 | 0.00 | |
| 304 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 305 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 306 | 65 | Floor covering works | 8 | 0.00 | |
| 307 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 308 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 309 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 310 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 | ||||
| Category 4: | Non-Pre Priced Coefficient | ||||
| 311 | Coefficient for Non-Pre Priced Items |
Option Period 01 (YR 04)
| DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION PERIOD 1 (Year 4) | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 401 | 15 | Road construction works | 8 | 0.00 | |
| 402 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 403 | 55 | Joinery works | 8 | 0.00 | |
| 404 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 405 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 406 | 65 | Floor covering works | 8 | 0.00 | |
| 407 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 408 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 409 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 410 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 | ||||
| Category 4: | Non-Pre Priced Coefficient | ||||
| 411 | Coefficient for Non-Pre Priced Items |
Option Period 02 (YR 05)
| DE, BE, and the NL MATOC 2017 - SECTION 00 41 00 PRICING SCHEDULE | |||||
| OPTION PERIOD 2 (Year 5) | |||||
| Line Item No. | Book No. | Description | Coefficient | Weight Factor | Line Item Weight |
| (1) | (2) | (3) | (4) | (5) | (6) |
| Category 1: | Books Ordered Most Often | NOTE: Offeror is required to bid on each book individually in this category. | |||
| 501 | 15 | Road construction works | 8 | 0.00 | |
| 502 | 50 | Plaster, gypsum and stucco work | 8 | 0.00 | |
| 503 | 55 | Joinery works | 8 | 0.00 | |
| 504 | 60 | Metal construction and locksmith | 8 | 0.00 | |
| 505 | 63 | Painting and Wallpaper works | 8 | 0.00 | |
| 506 | 65 | Floor covering works | 8 | 0.00 | |
| 507 | 80 | Heating plants and central industrial water | 8 | 0.00 | |
| 508 | 82 | Electrical work | 8 | 0.00 | |
| Category 2: | Books Ordered Often | ||||
| 509 | Coefficient for all books listed below this line: (11 Books) | 6 | 0.00 | ||
| 00 | Earthworks | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 30 | Masonry works | ||||
| 31 | Concrete and reinforced concrete works | ||||
| 34 | Carpentry and wood construction works | ||||
| 38 | Roofing and roof sealing works | ||||
| 39 | Flashing and sheet metal works | ||||
| 52 | Tile and slab works | ||||
| 53 | Screed works | ||||
| 57 | Hardware works | ||||
| 61 | Glazing works | ||||
| 81 | Gas, water and sewer installation work | ||||
| Category 3: | Books Ordered Least Often | ||||
| 510 | Coefficient for all books listed below this line: (11 Books) | 2 | 0.00 | ||
| 06 | Sewer Work | NOTE: Coefficient for this category is not to be a sum for books ordered, but an individual Coefficient that will be applied, if items from one of these books is ordered. | |||
| 07 | Underground Pressure Pipeline Work | ||||
| 08 | Drainage and drainage works | ||||
| 20 | Landscaping Work | ||||
| 21 | Insulation works on technical systems | ||||
| 51 | Scaffolding | ||||
| 54 | Asphalt Paving Work | ||||
| 56 | Wood flooring works | ||||
| 79 | Room Ventilation Work | ||||
| 84 | Lightning protection systems | ||||
| 98 | Asbestos removal works | ||||
| BOTTOM LINE SUM | 0.00 | ||||
| Category 4: | Non-Pre Priced Coefficient | ||||
| 511 | Coefficient for Non-Pre Priced Items |
Total Bottom Line Sum
| SECTION 00 41 00 PRICING SCHEDULE | |
| FY17 DE, BE, NL MATOC | |
| Bottom Line Sum Base Period (YEAR 01) | 0.00 |
| Bottom Line Sum Base Period (YEAR 02) | 0.00 |
| Bottom Line Sum Base Period (YEAR 03) | 0.00 |
| Bottom Line Sum Option Period 01 (YEAR 04) | 0.00 |
| Bottom Line Sum Option Period 02 (YEAR 05) | 0.00 |
| Total Bottom Line Sum | 0.00 |
File details come from the government source that posted it. Updated .