Experience Information Sheet

View the file

Other files

File Type Posted
A.07.24.02_Amend_02__R_17-R-0017.pdf PDF
A.07.24.02_Amend_02_Sol_Attach_3_PPQ_REV_17-R-0017.docx DOCX document
A.07.24.02_Amend_02_Sol_BLG_Rev_Final_17-R-0017.docx DOCX document
A.07.24.01_Amend_01_R-E_17-R-0017.pdf PDF
A.01.24_01 33 00 Submittal Procedures.pdf PDF
A.07.23.04 Sol Attach 3 PPQ 17-R-0017.docx DOCX document
A.01.24_00 73 15 General Conditions —
A.01.24_01 35 26.10 Additional Safety and Occupational Health Requirements for Projects in the European Union.pdf PDF
A.07.23 00 41 00 Pricing Schedule 17-R-0017.xlsx XLSX spreadsheet
A.01.24_02 41 00 Demolition and Deconstruction.pdf PDF
A.01.24_00 73 15.15 Time Extensions for Unusually Severe Weather.pdf PDF
A.01.24_01 00 15 Design After Award.pdf PDF
A.01.13 DIN Conversion to European Standard.pdf PDF
A.01.24_01 32 01.00 10 Project Schedule.pdf PDF
A.01.24_02 82 14.00 10 Asbestos Hazard Control Activities.pdf PDF
A.01.24_EP-310-1-6a Construction Signs _Deutsch_.pdf PDF
A.01.24_01 45 01.10 USACE QUALITY CONTROL SYSTEM —
A.07.23.02 Sol Attach 1 ExpOverviewSheet 17-R-0017.docx DOCX document
A.01.24_01 35 26 Safety and Occupational Health Requirements —
A.07.23 Solicitation R W912GB-17-R-0017.pdf PDF
A.01.24_01 45 01 USACE Quality Control.pdf PDF
A.01.13 UPB_Germany_Italy_Europe_2015-2005.PDF PDF
A.01.24_01 78 23 Operation and Maintenance Data.pdf PDF
A.01.24_01 78 00 Completion Procedures.pdf PDF
A.01.24_EP-310-1-6a Construction Signs.pdf PDF
A.01.13 Supplement to 2015 JOC UPB.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

Fiscal Year 2017 Germany, Belgium, and the Netherlands MATOC W912GB-17-R-0017

EXPERIENCE INFORMATION SHEET

PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:

Experience:

1. The location work was performed (Germany, Belgium, and the Netherlands – countries listed in descending order of importance): ___________________________________

2. The day, month, and year work was completed; must be completed within last six (6) years by the date of this solicitation: _______________

3. The final cost of this project, shall be between €2,000,000 ($2,500,000) and €18,000,000 ($20,000,000) (Projects that fall within the stated range are considered more relevant than those that do not): €/$_________________________

4. Is this project more than 50% complete by the date of this solicitation? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower

5. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

6. Do not provide a listing of existing or previous contracts, but rather provide detailed information of construction work for projects in at least one of the following categories, but work in more than one category may receive a higher rating:

a. Renovations of buildings

b. Replacement of to include major building systems (electrical, mechanical, structural, etc) repaired or replaced;

c. New Construction;

d. Concrete and/or asphalt roads, pavements, airfield runway work;

e. Design/Build construction projects

(Continue typing if required to provide more information)

ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET

PROJECT NO. _____ Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that self-performed at least 20% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience the project.

7. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals: