W912ES26QA013 Schedule of Services - amendment 0001.pdf

PDF 431 KB Posted

Attached to
Lock and Dam (LD) 5A Routine Gate Maintenance Quality Assurance and LD 3&4 Gate Fabrication Quality Assurance
Solicitation number
W912ES26QA013
Issued by

About this file

This document is a Pricing Schedule that details Quality Assurance (QA) services for miter gate fabrication and routine gate maintenance across a base period and four optional periods. The services are divided into two primary categories: LD3 and LD4 Miter Gate Fabrication Quality Assurance, and LD5A Routine Gate Maintenance Quality Assurance. The pricing schedule includes various inspection and review activities such as submittal reviews, RFI reviews, weld and fabrication inspections, coating inspections, bolted connection inspections, and final acceptance inspections. Each period (base and options 1-4) specifies the quantity of each service type, with some variations in quantities across different periods. The services involve multiple types of inspections and meetings, including weekly construction meetings, general condition inspections, roller gate repair plan inspections, and end shield-related inspections, all of which include associated travel costs.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE PERIOD

CLIN Description QTY Unit Unit Price Total Price

0001AA LD3&4 MGR QA Inspection Plan 1 JOB 0001AB LD3&4 MGR Submittal Reviews 10 EACH 0001AC LD3&4 MGR RFI Reviews 5 EACH 0001AD LD3&4 MGR Weld & Fabrication Inspection 22 EACH 0001AE LD3&4 MGR Coating Inspection 1 EACH 0001AF LD3&4 MGR Bolted Connection Inspection 4 EACH 0001AG LD3&4 MGR Diagonal Tensioning & Dimensional 1 EACH 0001AH LD3&4 MGR Final Inspection 0 EACH 0001AJ LD3&4 MGR Fabrication Facility Trips 15 EACH

0002AA LD5A RGM QA Inspection Plan 1 JOB 0002AB LD5A RGM Submittal Reviews 6 EACH 0002AC LD5A RGM RFI Reviews 8 EACH 0002AD LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 EACH 0002AE LD5A RGM General Condition Inspection & Travel 1 EACH 0002AF LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 EACH 0002AG LD5A RGM Coating & Painting Inspection & Travel 2 EACH 0002AH LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 EACH 0002AJ LD5A RGM End Shield Fabrication Inspection & Travel 1 EACH 0002AK LD5A RGM End Shield Coating Inspection & Travel 1 EACH 0002AL LD5A RGM End Shield Connection Inspection & Travel 1 EACH

TOTAL BASE

OPTION PERIOD 1

CLIN Description QTY Unit Price Total Price

1001AA LD3&4 MGR Submittal Reviews 5 EACH 1001AB LD3&4 MGR RFI Reviews 5 EACH 1001AC LD3&4 MGR Weld & Fabrication Inspection 4 EACH 1001AD LD3&4 MGR Coating Inspection 5 EACH 1001AE LD3&4 MGR Bolted Connection Inspection 10 EACH 1001AF LD3&4 MGR Diagonal Tensioning & Dimensional 5 EACH 1001AG LD3&4 MGR Final Inspection 4 EACH 1001AH LD3&4 MGR Fabrication Facility Trips 15 EACH

1002AA LD5A RGM Submittal Reviews 6 EACH 1002AB LD5A RGM RFI Reviews 8 EACH 1002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 EACH 1002AD LD5A RGM General Condition Inspection & Travel 1 EACH 1002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 EACH 1002AF LD5A RGM Coating & Painting Inspection & Travel 2 EACH 1002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 EACH 1002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 EACH 1002AJ LD5A RGM End Shield Coating Inspection & Travel 1 EACH 1002AK LD5A RGM End Shield Connection Inspection & Travel 1 EACH

TOTAL OPTION 1

LD5A Routine Gate Maintenance Quality Assurance

LD3 and LD4 Miter Gate Fabrication Quality Assurance

LD5A Routine Gate Maintenance Quality Assurance

LD3 and LD4 Miter Gate Fabrication Quality Assurance

OPTION PERIOD 2

CLIN Description QTY Unit Price Total Price

2001AA LD3&4 MGR Submittal Reviews 0 EACH 2001AB LD3&4 MGR RFI Reviews 0 EACH 2001AC LD3&4 MGR Weld & Fabrication Inspection 0 EACH 2001AD LD3&4 MGR Coating Inspection 1 EACH 2001AE LD3&4 MGR Bolted Connection Inspection 1 EACH 2001AF LD3&4 MGR Diagonal Tensioning & Dimensional 1 EACH 2001AG LD3&4 MGR Final Inspection 3 EACH 2001AH LD3&4 MGR Fabrication Facility Trips 5 EACH

2002AA LD5A RGM Submittal Reviews 6 EACH 2002AB LD5A RGM RFI Reviews 8 EACH 2002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 EACH 2002AD LD5A RGM General Condition Inspection & Travel 1 EACH 2002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 EACH 2002AF LD5A RGM Coating & Painting Inspection & Travel 2 EACH 2002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 EACH 2002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 EACH 2002AJ LD5A RGM End Shield Coating Inspection & Travel 1 EACH 2002AK LD5A RGM End Shield Connection Inspection & Travel 1 EACH

TOTAL OPTION 2

OPTION PERIOD 3

CLIN Description QTY Unit Price Total Price

3001AA LD3&4 MGR Submittal Reviews 0 EACH 3001AB LD3&4 MGR RFI Reviews 0 EACH 3001AC LD3&4 MGR Weld & Fabrication Inspection 0 EACH 3001AD LD3&4 MGR Coating Inspection 1 EACH 3001AE LD3&4 MGR Bolted Connection Inspection 1 EACH 3001AF LD3&4 MGR Diagonal Tensioning & Dimensional 1 EACH 3001AG LD3&4 MGR Final Inspection 3 EACH 3001AH LD3&4 MGR Fabrication Facility Trips 5 EACH

3002AA LD5A RGM Submittal Reviews 6 EACH 3002AB LD5A RGM RFI Reviews 8 EACH 3002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 EACH 3002AD LD5A RGM General Condition Inspection & Travel 1 EACH 3002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 EACH 3002AF LD5A RGM Coating & Painting Inspection & Travel 2 EACH 3002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 EACH 3002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 EACH 3002AJ LD5A RGM End Shield Coating Inspection & Travel 1 EACH 3002AK LD5A RGM End Shield Connection Inspection & Travel 1 EACH

TOTAL OPTION 3

LD3 and LD4 Miter Gate Fabrication Quality Assurance

LD5A Routine Gate Maintenance Quality Assurance

LD3 and LD4 Miter Gate Fabrication Quality Assurance

OPTION PERIOD 4

CLIN Description QTY Unit Price Total Price

4001AA LD5A RGM Submittal Reviews 3 EACH 4001AB LD5A RGM RFI Reviews 4 EACH 4001AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 13 EACH 4001AD LD5A RGM General Condition Inspection & Travel 1 EACH 4001AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 1 EACH 4001AF LD5A RGM Coating & Painting Inspection & Travel 1 EACH 4001AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 EACH 4001AH LD5A RGM End Shield Fabrication Inspection & Travel 1 EACH 4001AJ LD5A RGM End Shield Coating Inspection & Travel 1 EACH 4001AK LD5A RGM End Shield Connection Inspection & Travel 1 EACH

TOTAL OPTION 4

TOTAL BASE AND ALL OPTIONS