W912ES26QA013 Schedule of Services.pdf
PDF 99 KB Posted
- Solicitation number
- W912ES26QA013
About this file
This document is a Contract Line Item Number (CLIN) pricing schedule for Quality Assurance services related to two specific areas: LD3 and LD4 Miter Gate Fabrication, and LD5A Routine Gate Maintenance. The pricing schedule covers a base period and four option periods, with varying quantities of inspections, reviews, and travel-related activities. Key inspection types include QA inspection plans, submittal reviews, RFI reviews, weld and fabrication inspections, coating inspections, bolted connection inspections, and final acceptance inspections. The contract includes detailed line items for activities such as weekly construction meetings, general condition inspections, roller gate repair plan reviews, and end shield fabrication and coating inspections, with travel components integrated into many line items.
The document breaks down the services into granular CLIN codes with specific quantities for each period, though unit prices and total prices are left blank. The base period and subsequent option periods show slight variations in the number of required services, with some periods having zero quantities for certain line items. The primary focus appears to be on quality assurance and inspection services for gate fabrication and maintenance, with an emphasis on detailed technical reviews, physical inspections, and associated travel requirements across different project phases.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912ES26QA0130002 SF 30.pdf | ||
| W912ES26QA013 0002 - Amendment 0002 Scope of Work.docx | DOCX document | |
| W912ES26QA013 0002 - Amendment 0002 Summary of Changes.docx | DOCX document | |
| W912ES26QA013 Schedule of Services - amendment 0001.pdf | ||
| Solicitation Amendment W912ES26QA0130001 SF 30.pdf | ||
| 26QA013 - SOW - LD5A RGM - LD34 QA Services - final.docx | DOCX document | |
| Solicitation - W912ES26QA013.pdf | ||
| WD 2015-4995 Rev 29 dtd 12-03-2025 Iowa.docx | DOCX document | |
| WD 2015-4613 Rev 31 dtd 12-03-2025 Alabama - Russellville.docx | DOCX document | |
| WD 2015-4965 Rev 28 dtd 12-03-2025 Minnesota.docx | DOCX document | |
| WD 2015-5157 Rev 28 dtd 12-03-2025 Mississippi.docx | DOCX document | |
| WD 2015-4591 Rev 31 dtd 12-03-2025 Alabama - Cordova.docx | DOCX document | |
| WD 2015-4929 Rev 30 dtd 12-03-2025 Wisconsin.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE PERIOD
CLIN Description QTY Unit Price Total Price
0001AA LD3&4 MGR QA Inspection Plan 1 0001AB LD3&4 MGR Submittal Reviews 10 0001AC LD3&4 MGR RFI Reviews 5 0001AD LD3&4 MGR Weld & Fabrication Inspection 22 0001AE LD3&4 MGR Coating Inspection 1 0001AF LD3&4 MGR Bolted Connection Inspection 4 0001AG LD3&4 MGR Diagonal Tensioning & Dimensional 1 0001AH LD3&4 MGR Final Inspection 0 0001AJ LD3&4 MGR Fabrication Facility Trips 15
0002AA LD5A RGM QA Inspection Plan 1 0002AB LD5A RGM Submittal Reviews 6 0002AC LD5A RGM RFI Reviews 8 0002AD LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 0002AE LD5A RGM General Condition Inspection & Travel 1 0002AF LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 0002AG LD5A RGM Coating & Painting Inspection & Travel 2 0002AH LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 0002AJ LD5A RGM End Shield Fabrication Inspection & Travel 1 0002AK LD5A RGM End Shield Coating Inspection & Travel 1 0002AL LD5A RGM End Shield Connection Inspection & Travel 1
TOTAL BASE
OPTION PERIOD 1
CLIN Description QTY Unit Price Total Price
1001AA LD3&4 MGR Submittal Reviews 5 1001AB LD3&4 MGR RFI Reviews 5 1001AC LD3&4 MGR Weld & Fabrication Inspection 4 1001AD LD3&4 MGR Coating Inspection 5 1001AE LD3&4 MGR Bolted Connection Inspection 10 1001AF LD3&4 MGR Diagonal Tensioning & Dimensional 5 1001AG LD3&4 MGR Final Inspection 4 1001AH LD3&4 MGR Fabrication Facility Trips 15
1002AA LD5A RGM Submittal Reviews 6 1002AB LD5A RGM RFI Reviews 8 1002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 1002AD LD5A RGM General Condition Inspection & Travel 1 1002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 1002AF LD5A RGM Coating & Painting Inspection & Travel 2 1002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 1002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 1002AJ LD5A RGM End Shield Coating Inspection & Travel 1 1002AK LD5A RGM End Shield Connection Inspection & Travel 1
TOTAL OPTION 1
LD5A Routine Gate Maintenance Quality Assurance
LD3 and LD4 Miter Gate Fabrication Quality Assurance
LD5A Routine Gate Maintenance Quality Assurance
LD3 and LD4 Miter Gate Fabrication Quality Assurance
OPTION PERIOD 2
2001AA LD3&4 MGR Submittal Reviews 0 2001AB LD3&4 MGR RFI Reviews 0 2001AC LD3&4 MGR Weld & Fabrication Inspection 0 2001AD LD3&4 MGR Coating Inspection 1 2001AE LD3&4 MGR Bolted Connection Inspection 1 2001AF LD3&4 MGR Diagonal Tensioning & Dimensional 1 2001AG LD3&4 MGR Final Inspection 3 2001AH LD3&4 MGR Fabrication Facility Trips 5
2002AA LD5A RGM Submittal Reviews 6 2002AB LD5A RGM RFI Reviews 8 2002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 2002AD LD5A RGM General Condition Inspection & Travel 1 2002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 2002AF LD5A RGM Coating & Painting Inspection & Travel 2 2002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 2002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 2002AJ LD5A RGM End Shield Coating Inspection & Travel 1 2002AK LD5A RGM End Shield Connection Inspection & Travel 1
TOTAL OPTION 2
OPTION PERIOD 3
CLIN Description QTY Unit Price Total Price
3001AA LD3&4 MGR Submittal Reviews 0 3001AB LD3&4 MGR RFI Reviews 0 3001AC LD3&4 MGR Weld & Fabrication Inspection 0 3001AD LD3&4 MGR Coating Inspection 1 3001AE LD3&4 MGR Bolted Connection Inspection 1 3001AF LD3&4 MGR Diagonal Tensioning & Dimensional 1 3001AG LD3&4 MGR Final Inspection 3 3001AH LD3&4 MGR Fabrication Facility Trips 5
3002AA LD5A RGM Submittal Reviews 6 3002AB LD5A RGM RFI Reviews 8 3002AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 26 3002AD LD5A RGM General Condition Inspection & Travel 1 3002AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 2 3002AF LD5A RGM Coating & Painting Inspection & Travel 2 3002AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 3002AH LD5A RGM End Shield Fabrication Inspection & Travel 1 3002AJ LD5A RGM End Shield Coating Inspection & Travel 1 3002AK LD5A RGM End Shield Connection Inspection & Travel 1
TOTAL OPTION 3
OPTION PERIOD 4
LD3 and LD4 Miter Gate Fabrication Quality Assurance
LD5A Routine Gate Maintenance Quality Assurance
LD3 and LD4 Miter Gate Fabrication Quality Assurance
4001AA LD5A RGM Submittal Reviews 3 4001AB LD5A RGM RFI Reviews 4 4001AC LD5A RGM Weekly Construction & Three-Phase Control Meetings 13 4001AD LD5A RGM General Condition Inspection & Travel 1 4001AE LD5A RGM Roller Gate Repair Plan & NDT Inspection & Travel 1 4001AF LD5A RGM Coating & Painting Inspection & Travel 1 4001AG LD5A RGM Roller Gate Final Acceptance Inspection & Travel 1 4001AH LD5A RGM End Shield Fabrication Inspection & Travel 1 4001AJ LD5A RGM End Shield Coating Inspection & Travel 1 4001AK LD5A RGM End Shield Connection Inspection & Travel 1
TOTAL OPTION 4
TOTAL BASE AND ALL
OPTIONS