W912ES23B0019 0002 Amendment 0002.pdf

PDF 227 KB Posted

Attached to
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
Solicitation number
W912ES23B0016
Issued by

About this file

This document is an amendment to a solicitation for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The amendment makes changes to the specifications, including updates to the demolition requirements and the removal of some text. It also modifies the completion dates and liquidated damages for the contract.

The solicitation is for a firm, fixed-price contract to construct a 1.7-mile embankment section, including utility crossings, a road crossing, and other related work. The project is a Total Small Business Set-Aside, with an anticipated value between $25-100 million. The contract will be administered by the U.S. Army Corps of Engineers, St. Paul District. The current completion dates are September 11, 2026 for construction and September 10, 2027 for turf establishment, with liquidated damages of $2,768.67 per calendar day for construction and $1,249.32 per calendar day for turf establishment.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes to the specif ications and edits to FAR 52.211-10 Alt I and FAR 52.211-12 (see Summary of Changes).

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Nov-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES23B0016

X 9B. DATED (SEE ITEM 11)

16-Oct-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Nov-2024

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES23B0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF AMENDMENT 0002

Specifications:

Section 01 22 00.00 13 MEASUREMENT AND PAYMENT, Paragraph 1.8.2 Demolition, which formerly read:

1.8.2.1 Payment

Payment will be made in the Base Bid for furnishing all materials, equipment, and labor and performing all operations necessary for demolition as indicated. Work includes, but is not limited to, the removal and disposal of existing utilities to be relocated, culverts, aggregate surface removal, and bituminous pavement.

Is hereby changed to read:

1.8.2.1 Payment

Payment will be made in the Base Bid for furnishing all materials, equipment, and labor and performing all operations necessary for demolition as indicated. Work includes, but is not limited to, the removal and disposal of existing utilities to be relocated, culverts, temporary levee, aggregate surface removal, and bituminous pavement.

Section 02 41 00 DEMOLITION, Paragraph 1.1 Project Description, which formerly read:

This section covers the the removal of the roadways, culverts and the abandoned or removed utility lines as indicated.

Is now changed to read:

This section covers the removal of the roadways, temporary levee, culverts and the abandoned or removed utility lines as indicated.

The words “RTA” and “NOT FOR CONSTRUCTION” are hereby removed from the bottom of all pages of the specifications.

W912ES23B0016

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -

ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than:

The interim completion date for the utility crossing work is September 30, 2025.

All construction shall be completed by September 11, 2026.

All turf establishment shall be completed by September 10, 2027.

The exercise of the option will not change any of the completion dates.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by January 15, 2025. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the following amounts:

Liquidated Damages for Construction:

$2,768.67 for each calendar day of delay until the work is completed or accepted.

Liquidated Damages for Turf Establishment:

$1,249.32 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

(End of Summary of Changes)