Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
Solicitation number
W912ES23B0016
Issued by

About this file

This document is a Bid Schedule for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The project is a Firm, Fixed-Price contract being procured by the U.S. Army Corps of Engineers, St. Paul District as a Total Small Business Set-Aside. The solicitation number is W912ES23B0016 and the anticipated magnitude is between $25,000,000 and $100,000,000.

The project requires construction of a 1.7-mile embankment section, utility crossings, County Road 81 crossing, temporary levee removal, and other related civil and site work. The Bid Schedule outlines the various line items, quantities, and unit prices for the base bid and an option. Key elements include demolition, earthwork, drainage, paving, erosion control, and landscaping. Prospective offerors must be registered in the System for Award Management (SAM) and have an active account prior to award.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FMM SE-3
Bid Schedule - 18-NOV-2024

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1PERFORMANCE AND PAYMENT BONDS1JOB
2DEMOLITION1JOB
3TEMPORARY TRAFFIC CONTROL1JOB
4TEMPORARY EROSION CONTROL1JOB
5WATER AND SEWER1JOB
6COMUNICATION AND ELECTRICAL1JOB
7TOPSOIL STRIPPING1JOB
8PAVEMENT MARKING1JOB
9PERMANENT HIGHWAY SIGNS1JOB
10TEMPORARY IRRIGATION SYSTEM1JOB
11WATERING1JOB
12INSPECTION TRENCH8,600LF
14EMBANKMENT
14FIRST 715,694 CY - EMBANKMENT715,694CY
14OVER 715,694 CY - EMBANKMENT178,923CY
15TURF REINFORCEMENT MAT (TRM)879,968SF
16AGGREGATE SURFACE18,719TON
17SALVAGED BASE COURSE
17FIRST 6,391 CY - SALVAGED BASE COURSE6,391CY
17OVER 6,391 CY - SALVAGED BASE COURSE1,598CY
18PERMANENT CR81 ASPHALT PAVEMENT16,499SY
19PIPE CORRUGATED STEEL; .064IN 24IN90LF
20PIPE CORRUGATED STEEL; .064IN 30IN92LF
21PIPE CORRUGATED STEEL; .064IN 36IN52LF
22END SECTION CORRUGATED STEEL; .064IN 24IN4EA
23END SECTION CORRUGATED STEEL; .064IN 30IN4EA
24END SECTION CORRUGATED STEEL; .064IN 36IN2EA
25PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 592LF
26PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 769LF
27PRECAST REINFORCED CONCRETE BOX(RCB) CULVERT; 10 X 10364LF
28PRECAST CONCRETE END SECTION; 10 X 52EA
29PRECAST CONCRETE END SECTION; 10 X 72EA
30PRECAST CONCRETE END SECTION; 10 X 104EA
31TOPSOIL RESPREAD
31FIRST 229,850 CY - TOPSOIL RESPREAD229,850CY
31OVER 229,850 CY - TOPSOIL RESPREAD57,463CY
32SEEDING140.11AC
33RIPRAP; R20634TON
34RIPRAP; R30442TON
35RIPRAP; R80384TON
36RIPRAP; R140664TON
37ACCESS GATE2EA

TOTAL OF AMOUNTS

(ITEM NOS. 0001 THROUGH 0037 INCL.)

OPTION 1
1001PERFORMANCE AND PAYMENT BONDS1JOB
1002DEMOLITION1JOB
1003TEMPORARY TRAFFIC CONTROL1JOB
1004TEMPORARY EROSION CONTROL1JOB
1005TOPSOIL STRIPPING1JOB
1006PERMANENT HIGHWAY SIGNS1JOB
1007TEMPORARY IRRIGATION SYSTEM1JOB
1008WATERING1JOB
1009INSPECTION TRENCH2,176LF
1011MUCK EXCAVATION
1011FIRST 14,222 CY - MUCK EXCAVATION14,222CY
1011OVER 14,222 CY - MUCK EXCAVATION3,556CY
1012EMBANKMENT
1012FIRST 147,098 CY - EMBANKMENT147,098CY
1012OVER 147,098 CY - EMBANKMENT36,774CY
1013TURF REINFORCEMENT MAT (TRM)198,281SF
1014AGGREGATE SURFACE867TON
1015TOPSOIL RESPREAD
1015FIRST 56,458 CY - TOPSOIL RESPREAD56,458CY
1015OVER 56,458 CY - TOPSOIL RESPREAD14,114CY
1016ARTICULATED CONCRETE BLOCK27,326SF
1017SEEDING38.73AC
1018RIPRAP; R2084TON
TOTAL PRICE OF OPTION 1 (ITEMS 1001 THROUGH 1018 INCL.)