Bid Schedule 11-18-24.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
- Solicitation number
- W912ES23B0016
About this file
This document is a Bid Schedule for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The project is a Firm, Fixed-Price contract being procured by the U.S. Army Corps of Engineers, St. Paul District as a Total Small Business Set-Aside. The solicitation number is W912ES23B0016 and the anticipated magnitude is between $25,000,000 and $100,000,000.
The project requires construction of a 1.7-mile embankment section, utility crossings, County Road 81 crossing, temporary levee removal, and other related civil and site work. The Bid Schedule outlines the various line items, quantities, and unit prices for the base bid and an option. Key elements include demolition, earthwork, drainage, paving, erosion control, and landscaping. Prospective offerors must be registered in the System for Award Management (SAM) and have an active account prior to award.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FMM SE-3 |
| Bid Schedule - 18-NOV-2024 |
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
| 1 | PERFORMANCE AND PAYMENT BONDS | 1 | JOB |
| 2 | DEMOLITION | 1 | JOB |
| 3 | TEMPORARY TRAFFIC CONTROL | 1 | JOB |
| 4 | TEMPORARY EROSION CONTROL | 1 | JOB |
| 5 | WATER AND SEWER | 1 | JOB |
| 6 | COMUNICATION AND ELECTRICAL | 1 | JOB |
| 7 | TOPSOIL STRIPPING | 1 | JOB |
| 8 | PAVEMENT MARKING | 1 | JOB |
| 9 | PERMANENT HIGHWAY SIGNS | 1 | JOB |
| 10 | TEMPORARY IRRIGATION SYSTEM | 1 | JOB |
| 11 | WATERING | 1 | JOB |
| 12 | INSPECTION TRENCH | 8,600 | LF |
| 14 | EMBANKMENT | ||
| 14 | FIRST 715,694 CY - EMBANKMENT | 715,694 | CY |
| 14 | OVER 715,694 CY - EMBANKMENT | 178,923 | CY |
| 15 | TURF REINFORCEMENT MAT (TRM) | 879,968 | SF |
| 16 | AGGREGATE SURFACE | 18,719 | TON |
| 17 | SALVAGED BASE COURSE | ||
| 17 | FIRST 6,391 CY - SALVAGED BASE COURSE | 6,391 | CY |
| 17 | OVER 6,391 CY - SALVAGED BASE COURSE | 1,598 | CY |
| 18 | PERMANENT CR81 ASPHALT PAVEMENT | 16,499 | SY |
| 19 | PIPE CORRUGATED STEEL; .064IN 24IN | 90 | LF |
| 20 | PIPE CORRUGATED STEEL; .064IN 30IN | 92 | LF |
| 21 | PIPE CORRUGATED STEEL; .064IN 36IN | 52 | LF |
| 22 | END SECTION CORRUGATED STEEL; .064IN 24IN | 4 | EA |
| 23 | END SECTION CORRUGATED STEEL; .064IN 30IN | 4 | EA |
| 24 | END SECTION CORRUGATED STEEL; .064IN 36IN | 2 | EA |
| 25 | PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 5 | 92 | LF |
| 26 | PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10 X 7 | 69 | LF |
| 27 | PRECAST REINFORCED CONCRETE BOX(RCB) CULVERT; 10 X 10 | 364 | LF |
| 28 | PRECAST CONCRETE END SECTION; 10 X 5 | 2 | EA |
| 29 | PRECAST CONCRETE END SECTION; 10 X 7 | 2 | EA |
| 30 | PRECAST CONCRETE END SECTION; 10 X 10 | 4 | EA |
| 31 | TOPSOIL RESPREAD | ||
| 31 | FIRST 229,850 CY - TOPSOIL RESPREAD | 229,850 | CY |
| 31 | OVER 229,850 CY - TOPSOIL RESPREAD | 57,463 | CY |
| 32 | SEEDING | 140.11 | AC |
| 33 | RIPRAP; R20 | 634 | TON |
| 34 | RIPRAP; R30 | 442 | TON |
| 35 | RIPRAP; R80 | 384 | TON |
| 36 | RIPRAP; R140 | 664 | TON |
| 37 | ACCESS GATE | 2 | EA |
TOTAL OF AMOUNTS
(ITEM NOS. 0001 THROUGH 0037 INCL.)
| OPTION 1 | |||
| 1001 | PERFORMANCE AND PAYMENT BONDS | 1 | JOB |
| 1002 | DEMOLITION | 1 | JOB |
| 1003 | TEMPORARY TRAFFIC CONTROL | 1 | JOB |
| 1004 | TEMPORARY EROSION CONTROL | 1 | JOB |
| 1005 | TOPSOIL STRIPPING | 1 | JOB |
| 1006 | PERMANENT HIGHWAY SIGNS | 1 | JOB |
| 1007 | TEMPORARY IRRIGATION SYSTEM | 1 | JOB |
| 1008 | WATERING | 1 | JOB |
| 1009 | INSPECTION TRENCH | 2,176 | LF |
| 1011 | MUCK EXCAVATION | ||
| 1011 | FIRST 14,222 CY - MUCK EXCAVATION | 14,222 | CY |
| 1011 | OVER 14,222 CY - MUCK EXCAVATION | 3,556 | CY |
| 1012 | EMBANKMENT | ||
| 1012 | FIRST 147,098 CY - EMBANKMENT | 147,098 | CY |
| 1012 | OVER 147,098 CY - EMBANKMENT | 36,774 | CY |
| 1013 | TURF REINFORCEMENT MAT (TRM) | 198,281 | SF |
| 1014 | AGGREGATE SURFACE | 867 | TON |
| 1015 | TOPSOIL RESPREAD | ||
| 1015 | FIRST 56,458 CY - TOPSOIL RESPREAD | 56,458 | CY |
| 1015 | OVER 56,458 CY - TOPSOIL RESPREAD | 14,114 | CY |
| 1016 | ARTICULATED CONCRETE BLOCK | 27,326 | SF |
| 1017 | SEEDING | 38.73 | AC |
| 1018 | RIPRAP; R20 | 84 | TON |
| TOTAL PRICE OF OPTION 1 (ITEMS 1001 THROUGH 1018 INCL.) | |||
| TOTAL PRICE BASE AND OPTION 1 |
File details come from the government source that posted it. Updated .