W912ES23B0016 0008 Amendment 0008.pdf
PDF 267 KB Posted
- Attached to
- Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3
- Solicitation number
- W912ES23B0016
About this file
This document is an amendment to Solicitation W912ES23B0016 for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-3. The amendment makes changes to the provisions and clauses, and removes and replaces the Bid Schedule. The key details are:
The solicitation is for construction of a 1.7-mile-long embankment section, including a utility crossing, County Road 81 crossing, temporary levee removal, and utility relocation. The anticipated contract value is between $25-100 million. The North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction. The contract type is Firm, Fixed-Price. The solicitation is a Total Small Business Set-Aside and an Invitation for Bid (IFB). Offerors must be registered in the System for Award Management (SAM) prior to award. The contract will be administered by the U.S. Army Corps of Engineers, St. Paul District.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to the provisions and clauses, and to remove and replace the Bid Schedule. The Bid Schedule included w ith this amendment should be used unless replaced by a future amendment.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES23B0016
X 9B. DATED (SEE ITEM 11)
16-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2024
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES23B0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
to
CONTRACTING DIVISION
USACE, ST. PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
5152.211-9000 Evaluation of Subline Items (DEC 2019)
Item Nos. 0013, 0016, 0030, 1010, 1011, and 1014 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of provision)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES — SUBLINE ITEMS (DEC 2019)
This variation in estimated quantities clause is applicable only to item Nos. 0013, 0016, 0030, 1010, 1011, and 1014.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0013, 0016, 0030, 1010, 1011, and 1014 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation (FAR) 52.211-18, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under item Nos. 0013, 0016, 0030, 1010, 1011, and 1014 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. 0013, 0016, 0030, 1010, 1011, and 1014 exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
(End of clause)
BID SCHEDULE
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001 PERFORMANCE AND PAYMENT BONDS 1 JOB
0002 DEMOLITION 1 JOB
0003 TEMPORARY TRAFFIC CONTROL 1 JOB
0004 TEMPORARY EROSION CONTROL 1 JOB
0005 WATER AND SEWER 1 JOB
0006 COMUNICATION AND ELECTRICAL 1 JOB
0007 TOPSOIL STRIPPING 1 JOB
0008 PAVEMENT MARKING 1 JOB
0009 PERMANENT HIGHWAY SIGNS 1 JOB
0010 TEMPORARY IRRIGATION SYSTEM 1 JOB
0011 WATERING 1 JOB
0012 INSPECTION TRENCH 8,600 LF
0013 EMBANKMENT
0013AA FIRST 715,694 CY - EMBANKMENT 715,694 CY
0013AB OVER 715,694 CY - EMBANKMENT 178,923 CY
0014 TURF REINFORCEMENT MAT (TRM) 879,968 SF
0015 AGGREGATE SURFACE 18,719 TON
0016 SALVAGED BASE COURSE
0016AA FIRST 6,391 CY - SALVAGED BASE COURSE 6,391 CY
0016AB OVER 6,391 CY - SALVAGED BASE COURSE 1,598 CY
0017 PERMANENT CR81 ASPHALT PAVEMENT 16,499 SY
0018 PIPE CORRUGATED STEEL; .064IN 24IN 90 LF
0019 PIPE CORRUGATED STEEL; .064IN 30IN 92 LF
0020 PIPE CORRUGATED STEEL; .064IN 36IN 52 LF
0021 END SECTION CORRUGATED STEEL; .064IN 24IN 4 EA
0022 END SECTION CORRUGATED STEEL; .064IN 30IN 4 EA
0023 END SECTION CORRUGATED STEEL; .064IN 36IN 2 EA
0024 PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10
X 5
92 LF
0025 PRECAST REINFORCED CONCRETE BOX (RCB) CULVERT; 10
X 7
69 LF
0026 PRECAST REINFORCED CONCRETE BOX(RCB) CULVERT; 10 X
364 LF
0027 PRECAST CONCRETE END SECTION; 10 X 5 2 EA
0028 PRECAST CONCRETE END SECTION; 10 X 7 2 EA
0029 PRECAST CONCRETE END SECTION; 10 X 10 4 EA
0030 TOPSOIL RESPREAD
0030AA FIRST 229,850 CY - TOPSOIL RESPREAD 229,850 CY
0030AB OVER 229,850 CY - TOPSOIL RESPREAD 57,463 CY
0031 SEEDING 140.11 AC
0032 RIPRAP; R20 634 TON
0033 RIPRAP; R30 442 TON
0034 RIPRAP; R80 384 TON
0035 RIPRAP; R140 664 TON
0036 ACCESS GATE 2 EA
TOTAL OF AMOUNTS(ITEM NOS. 0001 THROUGH 0036 INCL.)
OPTION 1
1001 PERFORMANCE AND PAYMENT BONDS 1 JOB
1002 DEMOLITION 1 JOB
1003 TEMPORARY TRAFFIC CONTROL 1 JOB
1004 TEMPORARY EROSION CONTROL 1 JOB
1005 TOPSOIL STRIPPING 1 JOB
1006 PERMANENT HIGHWAY SIGNS 1 JOB
1007 TEMPORARY IRRIGATION SYSTEM 1 JOB
1008 WATERING 1 JOB
1009 INSPECTION TRENCH 2,176 LF
1010 MUCK EXCAVATION
1010AA FIRST 14,222 CY - MUCK EXCAVATION 14,222 CY
1010AB OVER 14,222 CY - MUCK EXCAVATION 3,556 CY
1011 EMBANKMENT
1011AA FIRST 147,098 CY - EMBANKMENT 147,098 CY
1011AB OVER 147,098 CY - EMBANKMENT 36,774 CY
1012 TURF REINFORCEMENT MAT (TRM) 198,281 SF
1013 AGGREGATE SURFACE 867 TON
1014 TOPSOIL RESPREAD
1014AA FIRST 56,458 CY - TOPSOIL RESPREAD 56,458 CY
1014AB OVER 56,458 CY - TOPSOIL RESPREAD 14,114 CY
1015 ARTICULATED CONCRETE BLOCK 27,326 SF
1016 SEEDING 38.73 AC
1017 RIPRAP; R20 84 TON
TOTAL OPTION 1 (ITEMS 1001 THROUGH 1017)
TOTAL BASE AND OPTION 1
(End of Summary of Changes)
| 5152.211-9000 Evaluation of Subline Items (DEC 2019) |
| 5152.211-9001 VARIATIONS IN ESTIMATED QUANTITIES — SUBLINE ITEMS (DEC 2019) |
File details come from the government source that posted it. Updated .