W912ES22R0001-0003 RRS Technical Factor Worksheet 10Nov21.pdf
PDF 183 KB Posted
- Solicitation number
- W912ES22R0001
About this file
This document contains a technical factor submission worksheet and details of a federal contract opportunity for construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Flood Risk Management Project. The U.S. Army Corps of Engineers, St. Paul District is seeking construction including a gated structure, dam walls, bridges, stilling basin, dentated end sill, retaining walls, approach apron, slope protection slab and approach walls. The project magnitude is estimated between $100 million and $250 million. Offerors must complete the technical factor submission worksheet to provide details of relevant previous projects that meet the stated technical evaluation criteria. The NAICS code is 237990 and size standard is $39.5 million. This is a full and open competition under FAR Parts 15 and 36, with payment and performance bonds required under FAR Part 28.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL FACTOR SUBMISSION WORKSHEET
W912ES22R0001 – Red River Structure
Technical Factor Number: __________. Project Number __________ of 2 for this Factor.
1. Prime Offeror Name and Address:
2. Name and Address of the firm that completed the relevant work:
3. Was the relevant work completed under subcontract? Yes_____ No _____
4. Name of prime contractor for which this relevant work was completed:
5. Project Details
Title: __________________________________________________________________________ Location: _______________________________________________________________________ Contract Number: ________________________________________________________________ Total Cost: _____________________________________________________________________ Full contract start and completion dates: ______________________________________________
6. A Letter of Commitment is provided (if applicable): Yes_____ No_____
7. An Engineer’s License is provided (if applicable): Yes_____ No_____
8. Was the construction project complete or at least 50% complete as of 01 October 2021?
Yes_____ No_____ Completion Date: ___________________________________
9. Name, title, email address and phone number of the reference who can confirm this work:
10. Provide details of the project that support the technical evaluation criteria of the respective technical factor including, but not limited to, descriptions, pictures, or diagrams, as necessary.
11. Explain how this project meets each of the technical evaluation factors for which it was submitted.
File details come from the government source that posted it. Updated .