This solicitation is for construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Area Flood Risk Management Project. The scope of work includes construction of a gated structure, dam walls, vehicle and mechanical bridges, a stilling basin, dentated end sill, downstream retaining walls, approach apron, slope protection slab and approach walls. The project is estimated to cost between $100-250 million. The U.S. Army Corps of Engineers, St. Paul District is the contracting agency, with responses due under Solicitation Number W912ES22R0001. This is designated as an unrestricted, full and open competition utilizing FAR Part 15 for evaluation. Payment and performance bonds are required in accordance with FAR Part 28. The NAICS code is 237990 for other heavy and civil engineering construction, with a size standard of $39.5 million.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL REGISTER SHEET
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Red River Structure Amendment
05 50 16 SD-02 Shop Drawings
2.1 GLow-Flow Radar Moveable
Support
2.2 GWire Weight Gage Support
05 51 33 SD-02 Shop Drawings 2.3Ladders 2.4Ship's Ladder
SD-03 Product Data 2.3Ladders 2.4Ship's Ladder 2.3.1Ladder Safety Devices
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 1.3Fabricator Certification for Ships
Ladder Assembly 10 14 00.10 SD-02 Shop Drawings
2.1 G HYDUSGS Staff gage Type E
SD-10 Operation and Maintenance Data
G ARCProtection and Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
STATE OF NORTH DAKOTA PERMIT TO CONSTRUCT OR MODIFY A DAM
STATE OF NORTH DAKOTA PERMIT TO CONSTRUCT OR
MODIFY A DAM
900 East Boulevard Ave | Bismarck, ND 58505 | 701.328.2750 | DWR.nd.gov
October 4, 2021
Mr. Kris Bakkegard, Director of Engineering Metro Flood Diversion Authority 207 4th Street N, Suite A Fargo, ND 58102
RE: Construction Permit No. 2489 – FMM Red River Structure (RRS) – Accepted
Dear Mr. Bakkegard:
The Department of Water Resources1 (DWR) has reviewed and accepted the final plans and specifications for the Red River Structure (RRS) portion of the Southern Embankment from the Metro Flood Diversion Authority (MFDA), satisfying Condition No. 3 of Construction Permit No. 2489.
It is also the DWR’s understanding that the MFDA is adhering to Special Condition No. 4 in the acquisition of property rights and construction timing, and therefore, the MFDA is hereby noticed to proceed with construction of the RRS and associated infrastructure.
Please recognize that all future phases of the Southern Embankment must be reviewed and accepted by the DWR pursuant to the conditions outlined in Construction Permit No. 2489.
1 The North Dakota Office of the State Engineer, as a codified regulatory entity, was repealed and replaced with the Department of Water Resources on August 1, 2021, via House Bill 1353 of the 67th Legislative Assembly.
Mr. Kris Bakkegard October 4, 2021
If you have any questions, please feel free to contact me at 701-328-4288 or kahuber@nd.gov.
Sincerely, Kelsey Huber Water Resource Engineer
KH:/1928
Enclosures: DWR Red River Structure Acceptance Map cc (electronic): Terry Williams - US Army Corps of Engineers – St. Paul District
Nathan Boerboom – City of Fargo Cass County Joint Water Resource District ND Game and Fish Department ND Department of Environmental Quality Minnesota Department of Natural Resources Richland County Water Resource District
CONSTRUCTION PERMIT NO. 2489
Permit Continued on Page 2
This permit authorizes the permittee to construct or modify a structure, pursuant to North Dakota Century Code § 61-16.1-38, subject to the permit conditions.
Name of Permittee: Metro Flood Diversion Authority 207 4th Street N, Suite A Fargo, ND 58102
Structure Type: Dam
Purpose: Flood Control
Location and Waterway on which Project will be constructed:
Location: See Attached Map
Stream: Red River, Wild Rice River, Various Drains
Basin: Upper Red
Project: Southern Embankment and associated infrastructure
This permit covers the Southern Embankment (Dam) and associated infrastructure that form a portion of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
Location Map: See Attached Map
CONSTRUCTION PERMIT NO. 2489 (CONTINUED)
CONDITIONS TO PERMIT
1. The Permittee, Project owner, Project sponsor, landowner, and any associated parties may be liable for all activity conducted and all effects caused by the construction, modification, and operation of the dam, dike, or other device as described in the application and this permit. Consequently, the receipt of this permit does not relieve the Permittee, Project owner, Project sponsor, landowner, or any associated parties from liability resulting from the construction, modification, operation, or maintenance of the dam, dike, or other device, as approved under this permit.
2. In accordance with North Dakota Century Code chapter 61-03, section 61-04-11, and section 61-16.1-38, this permit and the project approved under this permit are subject to changes, conditions, or modifications as in the judgement or discretion of the State Engineer may be necessary for safety or the protection of property. Such changes, conditions, or modifications, if required, will be at the expense of the Permittee, Project owner, Project sponsor, or any associated parties.
3. Prior to construction, in accordance with North Dakota Century Code section 61-16.1-38, plans and specifications associated with each Project component must be signed by a professional engineer eligible to practice engineering in the state of North Dakota, and reviewed and accepted by the State Engineer.
4. In accordance with North Dakota Administrative Code section 89-08-02-07, the Permittee must provide the State Engineer with As-Built plans within six months after the Project’s construction.
5. Access to the Project for inspection will not be denied to the county water resource district of jurisdiction, State Engineer staff, or State Water Commission staff.
6. If prior to or during construction items of substantial archeological value are discovered or a deposit of such items are disturbed, the Permittee must cease construction activities in the affected area. The State Historical Preservation Office and the State Engineer must be promptly notified of the discovery, and construction will not resume until the State Engineer gives written permission.
7. The permit applies to the specific Project and Project location described in the permit application.
8. Any activity below the Ordinary High Water Mark of the Red River may not be conducted until an approved sovereign lands permit is obtained from the Office of the State Engineer.
9. Construction for works authorized under this permit are to be completed within a total of 4 years under North Dakota Administrative Code sections 89-08-02-03.1 and 89-08-02- 03.2, including extensions, from the approval date. Construction expected beyond 4 years will require the permit to be reauthorized.
10. In accordance with North Dakota Administrative Code chapter 89-08-03, a registered and licensed professional engineer must be in charge of and responsible for inspections during construction.
11. In accordance with North Dakota Administrative Code chapter 89-08-03, inspections during construction must be performed at intervals necessary to ensure conformity with the construction permit as well as the plans and specifications.
12. In accordance with North Dakota Administrative Code chapter 89-08-03, the information obtained during an inspection must be documented in a written report. The report will specify any changes necessary under section 89-08-03-03. The inspection reports must be provided to the State Engineer upon request.
SPECIAL CONDITIONS
1. This permit is subject to compliance with the FM Area Diversion Project Property Rights Acquisition and Mitigation Plan. Any modifications to the Project Property Rights Acquisition and Mitigation Plan are subject to approval by the State Engineer. If additional mitigation needs are deemed necessary, the State Engineer reserves the right to require modifications to the approved Property Rights Acquisition and Mitigation Plan.
2. An Operation and Maintenance Plan for the Project must be submitted, reviewed, and accepted by the State Engineer before the Project is operated.
3. Prior to construction, the final Memorandum of Understanding between the Metro Flood Diversion Authority and Southeast Cass Water Resource District must be submitted to the Office of the State Engineer.
4. Prior to construction, the permittee must provide certification that the Project component being constructed is in compliance with the FM Area Diversion Project Property Rights Acquisition and Mitigation Plan.
5. Prior to Project completion, the Office of the State Engineer must be notified of and accept any changes to the Project plans or specifications.
6. An Emergency Action Plan must be submitted to and approved by the State Engineer before the Project is operated.
7. With regard to any Project component or phase that will impact or require modification of any Southeast Cass County water resource District Facility, the USACE must submit all engineering designs and construction plans to the Southeast Cass County Water Resource District.
8. USACE should consult with the Southeast Cass County Water Resource District to ensure acceptable mitigation of impacts to drainage as a result of construction or operation of the Diversion Inlet Structure; the USACE should otherwise ensure the Diversion Inlet Structure does not impede or inhibit drainage.
9. No portion of the Project shall be constructed, including those portions of the Project located in Minnesota, without approval from the North Dakota State Engineer. For review of Project components in Minnesota, the State Engineer will review only the Project design without consideration of Minnesota statutes and rules.
RECOMMENDATIONS
The following list of recommendations, though not binding to the approval of this permit, are strongly encouraged:
1. Given the high hazard nature of the Project, the State Engineer strongly encourages wise and sound development downstream of the Project to ensure those high-risk areas downstream of the Project are developed in a way that will minimize risk to the public.
2. The Permittee is encouraged to coordinate with the Office of the State Engineer regarding
Project status updates and the format in which they will be submitted to the Office of the State Engineer.
3. The Permittee is responsible for obtaining any other local, state, or federal permits or approvals that may be necessary prior to construction.
_____________________________ Date: ________________________ John Paczkowski, P.E.
Interim State Engineer
02/24/2021 ir NORTH DAKOTA DEPARTMeTT oJ HEALTH
ENVI RONMENTAL HEALTH SECTION
Gold Seal Center, 918 E. Divíde Ave.
Bismarck, ND 58501-1 947
701.328.5200 (fax) www.ndhealth.gov
Construction and Environmental Disturbance Requirements
These represent the minimum requirements of the North Dakota Department of Health.
They ensure that minimal environmental degradatíon occurs as a result of construction or related work which has the potential to affect the waters of the State of North Dakota All projects will be desígned and implemented to restrict the losses or disturbances of soil, vegetative cover, and pollutants (chemical or biological) from a site.
Soils
Prevent the erosion of exposed soil surfaces and trapping sediments being transported.
Examples include, but are not restricted to, sediment dams or berms, diversion dikes, hay bales as erosion checks, riprap, mesh or burlap blankets to hold soil during construction, and immediately establishing vegetative cover on disturbed areas after construction is completed. Fragile and sensitive areas such as wetlands, riparian zones, delicate flora, or land resources will be protected against compaction, vegetation loss, and unnecessary damage.
Surface Waters
All construction which dÍrectly or indirectly impacts aquatic systems will be managed to minimize impacts. All attempts will be made to prevent the contamination of water at construction sites from fuel spillage, lubricants, and chemicals, by following safe storage and handling procedures. Stream bank and stream bed disturbances will be controlled to minimize and/or prevent silt movement, nutrient upsurges, plant dislocation, and any physical, chemical, or biological disruption. The use of pesticides or herbicides in or near these systems is forbidden without approval from this Department.
Fill Material
Any fill material placed below the high water mark must be free of top soils, decomposable materials, and persistent synthetic organic compounds (in toxic concentrations). This includes, but is not limited to, asphalt, tires, treated lumber, and construction debris. The Department may require testing of fill materials. All temporary fills must be removed. Debris and solid wastes will be removed from the site and the impacted areas restored as nearly as possible to the oríginal condition.
Environmental Health Section Chiefs Office
701 .328.5150
Division of Air Quality
701.328.5188
Division of Municipal Facilities
701.328.5211
Division of Waste Management
701.328.5166
Division of Water Quality 701.328.5210
Printed on recycled paper.
NORTH DAKOTA STATE WATER COMMISSION
CONSTRUCTION COMPLETION NOTIFICATION
Mail To:
2I¿FH�RI�WKH�6WDWH�(QJLQHHU
����(DVW�%RXOHYDUG�$YH
%LVPDUFN��1'�����������
&RQWDFW�,QIR�
�3����������������
ZZZ�VZF�QG�JRY
&RQWLQXH�7R�3DJH��
REGULATORY DIVISION
6)1���������������� OFFICE OF
THE STATE
ENGINEER
USE ONLY
)RU�VWUXFWXUHV�WKDW�UHTXLUH�D�FRQVWUXFWLRQ�SHUPLW�IURP�WKH�6WDWH�(QJLQHHU��WKLV�IRUP�LV�WR�EH�VXEPLWWHG�WR�WKH�6WDWH�(QJLQHHU�XSRQ� FRPSOHWLRQ�RI�WKH�VWUXFWXUH�LQ�DFFRUGDQFH�ZLWK�1RUWK�'DNRWD�$GPLQLVWUDWLYH�&RGH�89-08-02-03.1��$V�EXLOW�SODQV�RI�WKH�VWUXFWXUH� PXVW�EH�VXEPLWWHG�ZLWK�WKLV�IRUP�LQ�DFFRUGDQFH�ZLWK�1RUWK�'DNRWD�$GPLQLVWUDWLYH�&RGH�89-08-02-07��)RU�VWUXFWXUHV�WKDW�GR�QRW� UHTXLUH�D�FRQVWUXFWLRQ�SHUPLW��WKH�6WDWH�(QJLQHHU�UHTXHVWV�WKDW�WKH�RZQHU�RI�WKH�VWUXFWXUH�FRPSOHWH�DSSOLFDEOH�VHFWLRQV�RI�WKLV�IRUP� IRU�WKH�6WDWH�(QJLQHHU¶V�UHFRUGV��$V�EXLOW�SODQV�DUH�QRW�UHTXLUHG�IRU�VWUXFWXUHV�QRW�UHTXLULQJ�D�FRQVWUXFWLRQ�SHUPLW�
89-08-02-03.1: &RQVWUXFWLRQ�PXVW�EH�FRPSOHWHG�DQG�WKH�6WDWH�(QJLQHHU�PXVW�EH�QRWL¿HG�RI�FRPSOHWLRQ�LQ�ZULWLQJ� ZLWKLQ�WZR�\HDUV�IURP�WKH�GDWH�RI�¿QDO�DSSURYDO�RU�WKH�SHUPLW�LV�YRLG��7KH�WZR�\HDU�SHULRG�GRHV�QRW�EHJLQ�XQWLO�DQ\�
DSSHDO�LV�FRPSOHWH�
89-08-02-07: $V�D�FRQGLWLRQ�RQ�DOO�FRQVWUXFWLRQ�SHUPLWV��WKH�RZQHU�RI�WKH�GDP��GLNH��RU�RWKHU�GHYLFH�ZLOO�SURYLGH�WKH� VWDWH�HQJLQHHU�ZLWK�³DV�EXLOW´�SODQV�ZLWKLQ�VL[�PRQWKV�DIWHU�WKH�GDP��GLNH��RU�RWKHU�GHYLFH�KDV�EHHQ�FRQVWUXFWHG�WR�
SURYLGH�GHWDLOV�RI�WKH�PRGL¿FDWLRQV�WKDW�RFFXUUHG�GXULQJ�FRQVWUXFWLRQ��
1. General Information
7\SH�2I�6WUXFWXUH��FKRRVH�RQH�
1DPH�2I�6WUXFWXUH
/HJDO�'HVFULSWLRQ ¼ ¼ 6HFWLRQ 7RZQVKLS 5DQJH
&RQVWUXFWLRQ�3HUPLW�1XPEHU��LI�DSSOLFDEOH� :DWHU�8VH�3HUPLW�1XPEHU��LI�DSSOLFDEOH�
&RQVWUXFWLRQ�3HUPLW�$SSURYDO�'DWH��LI�DSSOLFDEOH�
���9HUL¿FDWLRQ�2I�&RQVWUXFWLRQ��FRPSOHWH�VHFWLRQV�$��%�RU�&�DV�DSSOLFDEOH�
$��)RU�6WUXFWXUHV�5HTXLULQJ�$�&RQVWUXFWLRQ�3HUPLW
7KLV�VWUXFWXUH�KDV�EHHQ�EXLOW�RU�PRGL¿HG�LQ�DFFRUGDQFH�ZLWK�WKH�FRQVWUXFWLRQ�SHUPLW��$V�EXLOW�SODQV�DUH�DWWDFKHG�
&RPSOHWLRQ�'DWH
%��)RU�6WUXFWXUHV�1RW�5HTXLULQJ�$�&RQVWUXFWLRQ�3HUPLW
7KLV�VWUXFWXUH�KDV�EHHQ�EXLOW�LQ�DFFRUGDQFH�ZLWK�WKH�VXEPLWWHG�SODQV
/LVW�$Q\�0RGL¿FDWLRQV�)URP�7KH�6XEPLWWHG�3ODQV�7KDW�2FFXUUHG�'XULQJ�&RQVWUXFWLRQ
&RPSOHWLRQ�'DWH
&��7KLV�6WUXFWXUH�:LOO�1RW�%H�&RQVWUXFWHG
5HDVRQ
'DP
<HV No �,I�QR��SOHDVH�FRPSOHWH�VHFWLRQ�&�
<HV No �,I�QR��SOHDVH�FRPSOHWH�VHFWLRQ�&�
'LNH 2WKHU��'LYHUVLRQ��3RQG��/DJRRQ��HWF��
<HV
���2ZQHUVKLS�$QG�0DLQWHQDQFH��FRPSOHWH�DOO�
$��2ZQHU�2I�7KH�3URSHUW\�2Q�:KLFK�7KH�6WUXFWXUH�,V�/RFDWHG
1DPH�2U�$JHQF\
$JHQF\�&RQWDFW�3HUVRQ��LI�DSSOLFDEOH�
0DLOLQJ�$GGUHVV &LW\ 6WDWH =,3�&RGH
(PDLO�$GGUHVV +RPH�7HOHSKRQH�1XPEHU
:RUN�7HOHSKRQH�1XPEHU &HOO�7HOHSKRQH�1XPEHU
%��$JHQF\�2U�,QGLYLGXDO�5HVSRQVLEOH�)RU�2SHUDWLRQ�$QG�0DLQWHQDQFH�2I�7KH�6WUXFWXUH
������/DQG�2ZQHU�/LVWHG�$ERYH������������2WKHU��LI�RWKHU��SOHDVH�FRPSOHWH�LQIRUPDWLRQ�EHORZ�
1DPH�2U�$JHQF\
$JHQF\�&RQWDFW�3HUVRQ��LI�DSSOLFDEOH�
0DLOLQJ�$GGUHVV &LW\ 6WDWH =,3�&RGH
(PDLO�$GGUHVV +RPH�7HOHSKRQH�1XPEHU
:RUN�7HOHSKRQH�1XPEHU &HOO�7HOHSKRQH�1XPEHU
6)1����������������
3DJH���RI��
�6LJQDWXUH�2I�2ZQHU�RU�$JHQF\�5HSUHVHQWDWLYH� �3ULQW�1DPH� �'DWH�
AM100 LIMITS OF ARCHAEOLOGICAL MONITORING
AM100 LIMITS OF ARCHAEOLOGICAL MONITORING
BUFFALO‐RED RIVER WATERSHED DISTRICT
RED RIVER CONTROL STRUCTURE APPROVAL LETTER
BUFFALO-RED RIVER WATERSHED DISTRICT RED RIVER
CONTROL STRUCTURE APPROVAL LETTER
PROTECTING • MANAGING • EDUCATING
1303 4th Ave NE
Barnesville, MN 56514
Phone: 218-789-3100
Board of Managers
Peter Fjestad
President
Otter Tail County
Catherine Affield
Vice President
Wilkin County
Troy Larson
Treasurer
Wilkin County
John Hanson
Secretary
Becker County
Gerald Van Amburg
Manager
Clay County
Paul Krabbenhoft
Mark Hanson
September 14, 2021
Kris Bakkegard, Director of Engineering
Metro Flood Diversion Authority
207 4th St. N
Suite A
Fargo, ND 58102
RE: Red River Control Structure
Dear Kris:
On August 30, 2021, on behalf of the Metro Flood Diversion Authority (MFDA) you provided a copy of the plans, specifications, and other supporting information to the Buffalo-Red River
Watershed District (BRRWD) for the Red River Control Structure. The BRRWD issued permit
19-003 to the MFDA for the Flood Diversion Project. As a condition of that approval, the
BRRWD staff reviews and provides approval prior to the start of construction of any components of the dam in Minnesota. Per the permit conditions, the intention of this plan review and approval is to ensure consistency with the original project design and ensure local drainage accommodations and erosion control are adequate. Based on our review of the drainage and erosion control, it appears that they are adequate.
According to the conditions of BRRWD Permit 19-003, the construction of the Red River control structure can proceed when all property rights necessary for its individual construction are acquired. We understand that those rights are in process of being obtained. Once those rights are obtained, the Metro Flood Diversion Authority may proceed with construction.
We appreciate the opportunity to review the plans for this component of the overall Flood
Diversion project.
If you have any questions or need assistance, contact the Buffalo-Red River Watershed District by telephone at (218) 789-3100 or by email at kaltrichter@brrwd.org.
Sincerely, Kristine M. Altrichter
BRRWD Administrator mailto:kaltrichter@brrwd.org
SPECIFICATION SECTION 05 50 16
GAGE SUPPORTS
Red River Structure Amendment W912ES22R0001
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 50 16
GAGE SUPPORTS
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
2.1 LOW-FLOW RADAR MOVEABLE SUPPORT
2.2 WIRE WEIGHT GAGE SUPPORT
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Low-Flow Radar Gage Moveable Support
3.1.2 Wire Weight Gage Support
3.2 TESTING
3.2.1 Operability Testing
3.2.1.1 Low-Flow Radar Gage Moveable Support
3.2.2 Soundness Testing
-- End of Section Table of Contents --
SECTION 05 50 16 Page 1 RRSAMEND3 Nov 05, 2021
SECTION 05 50 16
GAGE SUPPORTS
PART 1 GENERAL
The gage support work includes the design, fabrication, installation, and testing of the equipment required to soundly support the Low-Flow Radar Gage and the wire weight gage. The gage supports shall firmly anchor the gages to the concrete, provide access for maintenance, and to convey electrical conduits to the gages.
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Low-Flow Radar Moveable Support; G
Include design calculations and catalog cuts if applicable.
Wire Weight Gage Support; G
Include design calculations and catalog cuts if applicable.
PART 2 PRODUCTS
2.1 LOW-FLOW RADAR MOVEABLE SUPPORT
The Contractor shall design and fabricate a movable support for the low-flow radar gage. The low-flow radar moveable support shall:
a. appropriately house and support the low-flow radar gage, which shall be provided by USACE, and is approximately 1.5 feet wide by 1 foot in length by 1 foot in depth;
b. be designed and constructed in accordance with Section 05 50 13
MISCELLANEOUS METAL FABRICATION;
c. extend a minimum of 36 inches from the control structure wall and shall provide a direct line-of-sight between the radar and the moving water;
d. be constructed with corrosion resistant finishes;
e. be movable to provide ready maintenance access to the low-flow radar gage by maintenance personnel standing safely protected by handrail and not require maintenance personnel to don fall-protection equipment in order to service the gage;
SECTION 05 50 16 Page 2
f. include a latch or removable pin that shall soundly secure the support in both the deployed and maintenance positions.
g. not deflect more than 1/2 inch when subjected to a 100 pound load in any direction applied to the cantilever arm 36 inches out from the edge of the control structure concrete wall;
The moveable mechanism may be manual and need not be automated.
2.2 WIRE WEIGHT GAGE SUPPORT
The Contractor shall design and fabricate a ?movable support for the wire weight gage. The wire weight moveable support shall:
a. appropriately house and support the wire weight gage, which shall be provided by USACE, and is approximately 1 cubic foot in size and shape;
b. be designed and constructed in accordance with Section 05 50 13
MISCELLANEOUS METAL FABRICATION;
c. be constructed with corrosion resistant finishes.
d. allow personnel to operate and view the gage while standing, without requiring personnel to bend or kneel to gain access;
e. provide ready operation and maintenance access to the wire weight gage by maintenance personnel standing safely protected by handrail and not require personnel to don fall-protection equipment to operate or service the gage;
f. not deflect more than 1/2 inch when subjected to a 100 pound load in any direction;
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Low-Flow Radar Gage Moveable Support
The Contractor shall install the low-flow radar gage in the location shown on the plans. The support shall be anchored to the concrete using a minimum of 4 epoxy-grouted anchor bolts. The installation shall allow a direct line-of-sight to the flowing water and not interfere with the tainter gate or control structure members.
3.1.2 Wire Weight Gage Support
The Contractor shall install the wire weight gage support within four feet of the low-flow radar gage support. The wire weight gage support shall be anchored to the concrete surface using a minimum of 4 epoxy-grouted anchor bolts, or alternatively be connected to the handrail. The wire weight shall have direct line-of-sight to the flowing water and not interfere with the tainter gate or control structure members.
3.2 TESTING
The Contractor shall test the installation of the low-flow radar gage moveable support and the wire weight gage support for operability and
SECTION 05 50 16 Page 3 soundness. Operability and soundness tests shall be performed in the presence of the Contracting Officer, or their representative.
3.2.1 Operability Testing
The operability tests shall include the provisions listed below for the gage supports.
3.2.1.1 Low-Flow Radar Gage Moveable Support
a. Operate the moveable support between the deployed and maintenance positions 10 times consecutively.
b. Confirm that one person can safely operate the support, within OSHA safety guidelines, without donning fall-arrest equipment.
3.2.2 Soundness Testing
The soundness tests shall consist of applying a 100-pound force to the supports. The force shall be applied in the vertical and horizontal directions independently. The force shall be applied to the low-flow radar gage support in the cantilevered position. If the gages are attached at the time of testing, the vertical force may be reduced by the weight of the gage. The Contractor shall confirm that the supports do not deflect more than 1/2 inch.
-- End of Section --
SECTION 05 50 16 Page 4
SPECIFICATION SECTION 05 51 33
METAL LADDERS
DIVISION 05 - METALS
SECTION 05 51 33
METAL LADDERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATES
1.4 QUALIFICATION OF WELDERS
1.5 DELIVERY, STORAGE, AND PROTECTION
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
2.1.2 Structural Tubing
2.1.3 Steel Pipe
2.1.4 Fittings for Steel Pipe
2.1.5 Aluminum Alloy Products
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
2.2.2 Galvanize
2.2.3 Repair of Zinc-Coated Surfaces
2.2.4 Shop Cleaning and Painting
2.2.4.1 Surface Preparation
2.2.4.2 Pretreatment, Priming and Painting
2.2.5 Nonferrous Metal Surfaces
2.2.6 Aluminum Surfaces
2.2.6.1 Surface Condition
2.2.6.2 Aluminum Finishes
2.3 LADDERS
2.3.1 Ladder Safety Devices
2.3.1.1 Fall Arrest Systems
2.4 SHIP'S LADDER
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
3.2 WORKMANSHIP
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
3.4 WELDING
3.5 FINISHES
3.5.1 Dissimilar Materials
3.5.2 Field Preparation
3.5.3 Environmental Conditions
3.6 LADDERS
-- End of Section Table of Contents --
SECTION 05 51 33 Page 1
SECTION 05 51 33
METAL LADDERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes
AMERICAN LADDER INSTITUTE (ALI)
ALI A14.3 (2008; R 2018) Ladders - Fixed - Safety Requirements
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP Z359.16 (2016) Safety Requirements for Climbing Ladder Fall Arrest Systems
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A500/A500M (2020) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
SECTION 05 51 33 Page 2
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A924/A924M (2020) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B26/B26M (2014; E 2015) Standard Specification for Aluminum-Alloy Sand Castings
ASTM B108/B108M (2019) Standard Specification for Aluminum-Alloy Permanent Mold Castings
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM D1187/D1187M (1997; E 2011; R 2011) Asphalt-Base Emulsions for Use as Protective Coatings for Metal
MASTER PAINTERS INSTITUTE (MPI)
MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.23 (Nov 2016) Ladders
29 CFR 1910.28 (Nov 2016)Duty to Have Fall Protection and Falling Object Protection
29 CFR 1910.29 (Nov 2016) Fall Protection System and Falling Object Protection - Criteria and Practices
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in
SECTION 05 51 33 Page 3 accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Ladders, Installation Drawings
Ship's Ladder (With or Without Guards), Installation Drawings
SD-03 Product Data
Ladders
Ship's Ladder (With or Without Guards)
Ladder Safety Devices (Climbing Ladder Fall Arrest Systems)
SD-07 Certificates
Fabricator Certification for Ladder Assembly
Fabricator Certification for Ships Ladder Assembly
1.3 CERTIFICATES
Provide fabricator certification for ladder assembly stating that the ladder and associated components have been fabricated according to the requirements of 29 CFR 1910.23.
Provide fabricator certification for ships ladder assembly stating that the ships ladder and associated components have been fabricated according to the requirements of 29 CFR 1910.23.
1.4 QUALIFICATION OF WELDERS
Qualify welders in accordance with AWS D1.1/D1.1M. Use procedures, materials, and equipment of the type required for the work.
1.5 DELIVERY, STORAGE, AND PROTECTION
Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
ASTM A36/A36M.
2.1.2 Structural Tubing
ASTM A500/A500M.
2.1.3 Steel Pipe
ASTM A53/A53M, Type E or S, Grade B.
SECTION 05 51 33 Page 4
2.1.4 Fittings for Steel Pipe
Standard malleable iron fittings ASTM A47/A47M.
2.1.5 Aluminum Alloy Products
Conform to ASTM B209 for sheet plate, ASTM B221 for extrusions and ASTM B26/B26M or ASTM B108/B108M for castings, as applicable. Provide aluminum extrusions at least 1/8 inch thick and aluminum plate or sheet at least 0.050 inch thick.
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
Hot-dip galvanize items specified to be zinc-coated, after fabrication where practicable. Galvanizing: ASTM A123/A123M, ASTM A153/A153M, ASTM A653/A653M or ASTM A924/A924M, G90, as applicable.
2.2.2 Galvanize
Anchor bolts, washers, and parts or devices necessary for proper installation, unless indicated otherwise.
2.2.3 Repair of Zinc-Coated Surfaces
Repair damaged surfaces with galvanizing repair method and paint conforming to ASTM A780/A780M or by application of stick or thick paste material specifically designed for repair of galvanizing, as approved by Contracting Officer. Clean areas to be repaired and remove slag from welds. Heat surfaces to which stick or paste material is applied, with a torch to a temperature sufficient to melt the metallics in stick or paste; spread molten material uniformly over surfaces to be coated and wipe off excess material.
2.2.4 Shop Cleaning and Painting
2.2.4.1 Surface Preparation
Blast clean surfaces in accordance with SSPC SP 6/NACE No.3. Surfaces that will be exposed in spaces above ceiling or in attic spaces, crawl spaces, furred spaces, and chases may be cleaned in accordance with SSPC SP 3 in lieu of being blast cleaned. Wash cleaned surfaces which become contaminated with rust, dirt, oil, grease, or other contaminants with solvents until thoroughly clean.
2.2.4.2 Pretreatment, Priming and Painting
Apply pretreatment, primer, and paint in accordance with manufacturer's printed instructions. On surfaces concealed in the finished construction or not accessible for finish painting, apply an additional prime coat to a minimum dry film thickness of 1.0 mil. Tint additional prime coat with a small amount of tinting pigment.
2.2.5 Nonferrous Metal Surfaces
Protect by plating, anodic, or organic coatings.
SECTION 05 51 33 Page 5
2.2.6 Aluminum Surfaces
2.2.6.1 Surface Condition
Before finishes are applied, remove roll marks, scratches, rolled-in scratches, kinks, stains, pits, orange peel, die marks, structural streaks, and other defects which will affect uniform appearance of finished surfaces.
2.2.6.2 Aluminum Finishes
Unexposed plate and extrusions may have mill finish as fabricated.
Sandblast castings' finish, medium, AA DAF45. Unless otherwise specified, provide all other aluminum items with hand sanded or machine finish to a 240 grit. Provide a coating thickness not less than that specified for protective and decorative type finishes for items used in interior locations or architectural Class I type finish for items used in exterior locations in AA DAF45.
2.3 LADDERS
Fabricate vertical ladders conforming to 29 CFR 1910.23 and Section 5 of ALI A14.3. Ladders shall be capable of supporting their maximum intended load. Use 2 1/2 by 3/8 inch steel flats for stringers and 3/4 inch diameter steel rods for rungs. Ladder rungs, step and cleats must be spaced not less than 10 inches and not more than 16 inches wide (measured before installation of ladder safety system), spaced no more than 14 inches apart, plug welded or shouldered and headed into stringers. Install ladders so that the maximum perpendicular distance from the centerline of the steps or rungs, or grab bars, or both, to the nearest permanent object in the back of the ladder or to the finished wall surface will not be less than 7 inches, except for the elevator pit ladders, which have a minimum perpendicular distance of 4.5 inches. Provide heavy clip angles riveted or bolted to the stringer and drilled for not less than two 1/2 inch diameter expansion bolts as indicated. Provide intermediate clip angles not over 48 inches on centers. The top rung of the ladder must be level with the top of the access level, parapet or landing served by the ladder except for hatches or wells. Extend the side rails of through or side step ladders 42 inches above the access level. Provide ladder access protective swing gates at the top of access/egress level. The drawings must indicate ladder locations and details of critical dimensions and materials.
2.3.1 Ladder Safety Devices
Conform to 29 CFR 1910.28 (Nov 2016).
Ladders greater than 20 feet, shall utilize a personal fall arrest system.
The Gage well ladder, shall have overhead beam and trolley for fall arrest system.
2.3.1.1 Fall Arrest Systems
Conform to 29 CFR 1910.29, Section 7 of ALI A14.3 and ASSP Z359.16.
Install ladder safety devices on ladders over 20 feet long or more. The ladder safety systems must meet the design requirement of the ladders which they serve. The ladder safety system must be capable of sustaining a minimum static load of 1,000 pounds. The applied loads transferred to the climbing ladder mounting locations as a result of a fall shall be specified by the manufacturer of the climbing ladder fall arrest system. Each ladder safety system must allow the worker to climb up and down using both hands
SECTION 05 51 33 Page 6 and does not require the employee continuously, hold, push, or pull any part of the system while climbing. The connection between the carrier or lifeline and the point of attachment to the body harness does not exceed 9 inches. The ladder safety system consists of a rigid or flexible carrier.
Mountings for the rigid carries are attached at each end of the carrier, with intermediate mountings spaced as necessary, along the entire length of the carrier. Mountings for flexible carrier are attached at each end of the carrier and cable guides for flexible carriers are installed at least 25 feet apart but not more than 40 feet apart along the entire length of the carrier. The design and installation of mountings and cable guides does not reduce the design strength of the ladder.
2.4 SHIP'S LADDER
Fabricate stringers and framing of steel plate or shapes. Bolt, rivet or weld connections and anchor to supporting construction. Provide treads with non-slip surface as specified for safety treads. Aluminum ladders may be provided, subject to approval of treads, materials, and shop drawings.
Requirements shown or specified for steel apply. Provide anchor items of zinc-coated steel. Design assembly, including tread connections and methods of attachment, to support a live load of 300 pounds per tread.
Provide railings as specified for metal handrails.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Install items at locations indicated, according to manufacturer's instructions. Verify all measurements and take all field measurements necessary before fabrication. Provide Exposed fastenings of compatible materials, generally matching in color and finish, and harmonize with the material to which fastenings are applied. Include materials and parts necessary to complete each item, even though such work is not definitely shown or specified. Poor matching of holes for fasteners will be cause for rejection. Conceal fastenings where practicable. Thickness of metal and details of assembly and supports must provide strength and stiffness.
Formed joints exposed to the weather to exclude water. Items listed below require additional procedures.
3.2 WORKMANSHIP
Metalwork must be well formed to shape and size, with sharp lines and angles and true curves. Drilling and punching must produce clean true lines and surfaces. Continuously weld along the entire area of contact.
Do not tack weld exposed connections of work in place. Grid smooth exposed welds. Provide smooth finish on exposed surfaces of work in place, unless otherwise approved. Where tight fits are required, mill joints. Cope or miter corner joints, well formed, and in true alignment. Install in accordance with manufacturer's installation instructions and approved drawings, cuts, and details.
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
Provide anchorage where necessary for fastening metal items securely in place. Include for anchorage not otherwise specified or indicated slotted inserts, expansion anchors, and powder-actuated fasteners, when approved for concrete; toggle bolts and through bolts for masonry; machine bolts, carriage bolts and powder-actuated threaded studs for steel; through bolts, lag bolts, and screws for wood. Do not use wood plugs in any material.
SECTION 05 51 33 Page 7
Provide non-ferrous attachments for non-ferrous metal. Make exposed fastenings of compatible materials, generally matching in color and finish, to which fastenings are applied. Conceal fastenings where practicable.
3.4 WELDING
Perform welding, welding inspection, and corrective welding, in accordance with AWS D1.1/D1.1M. Use continuous welds on all exposed connections.
Grind visible welds smooth in the finished installation.
3.5 FINISHES
3.5.1 Dissimilar Materials
Where dissimilar metals are in contact, protect surfaces with a coat conforming to MPI 79 to prevent galvanic or corrosive action. Where aluminum is in contact with concrete, plaster, mortar, masonry, wood, or absorptive materials subject to wetting, protect with ASTM D1187/D1187M, asphalt-base emulsion.
3.5.2 Field Preparation
Remove rust preventive coating just prior to field erection, using a remover approved by the rust preventive manufacturer. Surfaces, when assembled, must be free of rust, grease, dirt and other foreign matter.
3.5.3 Environmental Conditions
Do not clean or paint surface when damp or exposed to foggy or rainy weather, when metallic surface temperature is less than 5 degrees F above the dew point of the surrounding air, or when surface temperature is below 45 degrees F or over 95 degrees F, unless approved by the Contracting Officer.
3.6 LADDERS
Secure to the adjacent construction with the clip angles attached to the stringer. Secure to masonry or concrete with not less than two 1/2 inch diameter expansion bolts. Install intermediate clip angles not over 48 inches on center. Install brackets as required for securing of ladders welded or bolted to structural steel or built into the masonry or concrete. Ends of ladders must not rest upon floor.
-- End of Section --
SECTION 05 51 33 Page 8
SPECIFICATION SECTION 10 14 00.10
STAFF GAGES
Red River Structure Amendment W912ES22R001
DIVISION 10 - SPECIALTIES
SECTION 10 14 00.10
STAFF GAGES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 USGS STAFF GAGE TYPE E
2.1.1 Materials
2.1.2 Dissimilar Materials
2.2 ALUMINUM ALLOY PRODUCTS
2.3 ANODIC COATING
2.4 ORGANIC COATING
2.5 STEEL PRODUCTS
2.6 COLOR, FINISH, AND CONTRAST
PART 3 EXECUTION
3.1 SHOP FABRICATION
3.1.1 Factory Workmanship
3.1.2 Shop Painting
3.2 LOCATIONS
3.3 MOUNTING
3.4 ATTACHMENTS
ATTACHMENTS:
Type E
-- End of Section Table of Contents --
SECTION 10 14 00.10 Page 1 RRSAMEND3 Nov 09, 2021
SECTION 10 14 00.10
STAFF GAGES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes
AMERICAN WELDING SOCIETY (AWS)
AWS C1.1M/C1.1 (2012) Recommended Practices for Resistance Welding
AWS D1.1/D1.1M (2020) Structural Welding Code - Steel
AWS D1.2/D1.2M (2014; Errata 1 2014; Errata 2 2020) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A924/A924M (2020) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
ASTM B26/B26M (2014; E 2015) Standard Specification for Aluminum-Alloy Sand Castings
ASTM B108/B108M (2019) Standard Specification for
SECTION 10 14 00.10 Page 2
Aluminum-Alloy Permanent Mold Castings
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2020) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM AMP 500 (2006) Metal Finishes Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
USGS Staff gage Type E; G, HYD
SD-10 Operation and Maintenance Data
Protection and Cleaning; G , ARC
PART 2 PRODUCTS
2.1 USGS STAFF GAGE TYPE E
The purpose of these United States Geological Survey (USGS) gages is to read water levels around the structure. Provide gage markings for tenths of feet with both graphical tick marks and numbers. Additionally provide two number plates for each foot. Materials and manufacturer shall be the same for all gage plates. Submit manufacturer's descriptive data and catalog cuts. Refer to the attachment, Type E for Gage example.
Staff Gage Plates: Staff gage plates shall be provided in 4 foot plate sections with predrilled screw holes, two holes (one on each side) for every foot, ten holes per plate section. Staff gage shall be white with black numbers and ticks. Every foot and half foot shall be marked by a clipped tick mark.
Number Plates: Utilize the last two elevation numbers,(example:
elevation 904, Number plates shall be 04). Two number plates shall be centered on the foot increments to the right of the staff gage plate.
Each metal plate is 2 inches wide by 3 inches tall with white background and black numbers. Each plate shall have two predrilled holes for screws at diagonal corners.
2.1.1 Materials
Use high grade galvanized Steel or aluminum for plates. All edges and plates shall be finished. Plates shall be baked enamel or anodized conforming to AA DAF45.
SECTION 10 14 00.10 Page 3
2.1.2 Dissimilar Materials
Where dissimilar metals are in contact, or where aluminum is in contact with concrete, mortar, masonry, wet or pressure-treated wood, or absorptive materials subject to wetting, the surfaces must be protected with a coat of asphalt varnish or a coat of zinc-molybdate primer to prevent galvanic or corrosive action or, where applicable, diametrically isolated with nylon washers.
2.2 ALUMINUM ALLOY PRODUCTS
Aluminum alloy products must conform to ASTM B209 for sheet or plate, ASTM B221 for extrusions and ASTM B26/B26M or ASTM B108/B108M for castings. Aluminum extrusions must be provided at least 1/8 inch thick and aluminum plate or sheet at least 16 gage thick. Welding for aluminum products must conform to AWS C1.1M/C1.1 .
2.3 ANODIC COATING
Anodized finish must conform to AA DAF45 as follows:
Integrated color anodized designation AA-M10-C22-A32, Architectural Class 0.4 to 0.7 mil.
Electrolytically deposited color - anodized designation AA-M10-C22-A34, Architectural Class II 0.4 to 0.7 mil.
2.4 ORGANIC COATING
Clean, prime and give surfaces a semi-gloss baked enamel finish in accordance with NAAMM AMP 500, AMP 505, with total dry film thickness not less than 1.2 mils.
2.5 STEEL PRODUCTS
Structural steel products must conform to ASTM A36/A36M. Sheet and strip steel products must conform to ASTM A1011/A1011M . Welding for steel products must conform to AWS D1.2/D1.2M .
2.6 COLOR, FINISH, AND CONTRAST
Color must be as indicated on the drawings. For buildings required to be handicapped-accessible, the characters and background of signs must be eggshell, matte, or other non-glare finish. Characters and symbols must contrast with their background - either light characters on a dark background or dark characters on a light background.
PART 3 EXECUTION
3.1 SHOP FABRICATION
3.1.1 Factory Workmanship
Work must be assembled in the shop, as far as practical, ready for installation at the site. Work that cannot be shop assembled must be given a trial fit in the shop to ensure proper field assembly. Holes for bolts and screws must be drilled or punched. Drilling and punching must produce clean, true lines and surfaces. Welding to or on structural steel must be in accordance with AWS D1.1/D1.1M . Welding must be continuous
SECTION 10 14 00.10 Page 4 along the entire area of contact. Exposed welds must be ground smooth.
Exposed surfaces of work must have a smooth finish and exposed riveting must be flush. Fastenings must be concealed and tamper proof where practical. Items specified to be galvanized must be by hot-dip process after fabrication if practical. Galvanization must be in accordance with ASTM A123/A123M and ASTM A653/A653M , as applicable. Other metallic coatings of steel sheet must be in accordance with ASTM A924/A924M .
Joints exposed to the weather must be formed to exclude water. Drainage and weep holes must be included as required to prevent condensation buildup.
3.1.2 Shop Painting
Surfaces of miscellaneous metal work, except nonferrous metal, corrosion resisting steel, and zinc-coated work, must be given one coat of zinc-molybdate primer or an approved rust-resisting treatment and metallic primer in accordance with manufacturer's standard practice. Surfaces of items to be embedded in concrete must not be painted. Upon completion of work, damaged surfaces must be recoated.
3.2 LOCATIONS
Refer to the drawings for locations. Refer to Structural drawings for details.
Survey in gage plates and utilize the NAVD88 Datum. Vertical control will utilize point NGSFMM04 and as agreed to and approved by COR. For the Red River Structure (RRS) the expected elevations are as indicated below.
Confirm with COR prior to ordering.
Upstream:Top Elevation Marker shall be 929 Feet.
Upstream: Bottom Elevation Marker shall be 905 Feet.
Downstream:Top Elevation Marker shall be 920 Feet.
Downstream: Bottom Elevation Marker shall be 904 Feet.
3.3 MOUNTING
Provide non-corrosive 1-1/4 inch wood screws to attach plates onto pressure treated lumber.
3.4 ATTACHMENTS
1. USGS STAFF GAGE TYPE E 1 PAGE
-- End of Section --
SECTION 10 14 00.10 Page 5
SECTION 10 14 00.10
STAFF GAGES
ATTACHMENTS
USGS STAFF GAUGE TYPE E
File details come from the government source that posted it. Updated .