W912ES22R0001 RRS Technical Factor Worksheet.pdf

PDF 32 KB Posted

Attached to
RED RIVER STRUCTURE of the Fargo Moorhead Metropolitan Flood Risk Management Project
Solicitation number
W912ES22R0001
Issued by

About this file

This document contains a technical factor submission worksheet and details of a related federal contract opportunity for construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Area Flood Risk Management Project. The U.S. Army Corps of Engineers, St. Paul District, seeks construction of the Red River Structure, which includes a gated structure, dam walls, bridges, stilling basin, end sill, retaining walls, approach structures, and slope protection. The project value is estimated between $100-250 million. Offerors must complete the technical factor submission worksheet to provide details of relevant past projects to be evaluated against criteria for factors like construction experience. The contract will be awarded following a full and open competition under FAR Parts 15 and 36.

View the file

Other files

File Type Posted
W912ES22R0001-0006 RRS Remove COVID-19 Clause 09Dec21.pdf PDF
W912ES22R0001-0005 RRS PLANS 01Dec21.pdf PDF
W912ES22R0001-0005 RRS SPEC 31 62 14.01 12 01Dec21.pdf PDF
W912ES22R0001-0005 RRS PRICE SCHEDULE 01Dec21.pdf PDF
W912ES22R0001-0005 RRS Amendment 01Dec21.pdf PDF
W912ES22R0001-0004 RRS WD PLAN SPEC 18Nov21.pdf PDF
W912ES22R0001-0004 RRS PLANS 18Nov21.pdf PDF
W912ES22R0001-0004 RRS MNDNR Contractor Resp Form 18Nov21.pdf PDF
W912ES22R0001-0003 RRS SPECS 10Nov21.pdf PDF
W912ES22R0001-0003 RRS Technical Factor Worksheet 10Nov21.pdf PDF
W912ES22R0001-0003 RR FINAL TOPSOIL US 10Nov21.xlsx XLSX spreadsheet
W912ES22R0001-0003 RRS Amendment 10Nov21.pdf PDF
W912ES22R0001-0003 RRS PLANS 10Nov21.pdf PDF
W912ES22R0001 RRS Site Visit Attendees 28Oct21.pdf PDF
W912ES22R0001-0002 FMM RRS Plans 2Nov21.pdf PDF
W912ES22R0001-0002 FMM RRS Permit 2Nov21.pdf PDF
W91ES22R0001-0002 RRS WD Spec Updates 2Nov21.pdf PDF
W912ES22R0001-0001 RRS Site Visit Update 21Oct21.pdf PDF
W912ES22R0001 RRS PLANS Pgs 80-280 12Oct21.pdf PDF
W912ES22R0001 RRS PLANS Pgs 281-413 12Oct21.pdf PDF
W912ES22R0001 RRS PLANS Pgs 1-79 12Oct21.pdf PDF
W912ES22R0001 RRS SPECS 12Oct21.pdf PDF
W912ES22R0001 RRS SPECS 12Oct21.pdf PDF
W912ES22R0001 JA Sealant Bond Breaker.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL FACTOR SUBMISSION WORKSHEET

W912ES22R0001 - Red River Structure

Technical Factor Number: ___ _ Project Number ____ of 2 for this Factor.

1. Prime Offeror Name and Address:

2. Name and Address of the firm that completed the relevant work:

3. Was the relevant work completed under subcontract? Yes __

4. Name of prime contractor for which this relevant work was completed:

5. Project Details

No

Title: ------------------------------- Location: ------------------------------- Contract Number: ___________________________ _ Total Cost:

Full contract start and completion dates:

6. A Letter of Commitment is provided (if applicable): Yes__ No__ N/A ___ _

7. An Engineer's License is provided (if applicable): Yes__ No__ NIA ____ _

8. Was the construction project complete or at least 50% complete as of 01 October 2021?

Yes __ No __ Completion Date: ______________ _

9. Name, title, email address and phone number of the reference who can confirm this work:

10. Provide details of the project that support the technical evaluation criteria of the respective technical factor including, but not limited to, descriptions, pictures, or diagrams in an attachment, as necessary.

11. Explain in one (1) attached, single-sided page or less, how this project meets each of the technical evaluation factors for which it was submitted.

File details come from the government source that posted it. Updated .