This amendment modifies the solicitation for the construction of the Red River Structure portion of the Fargo Moorhead Metropolitan Flood Risk Management Project. Key details include:
The required response date is extended from November 23, 2021 to December 14, 2021. Specifications are revised for items such as archaeological monitoring, mass concrete mix design, gate operating machinery design, and as-built drawing requirements. Plan sheets are replaced. Evaluation criteria include experience with fabrication and installation of large gates, mass concrete placement, gate machinery design and manufacturing. The management team must demonstrate experience on heavy civil projects over $25 million. AISC certification is required. The estimated price range for this construction project by the U.S. Army Corps of Engineers, St. Paul District is $100-250 million.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Page 2 for the purpose of Amendment 0003 to W912ES22R0001 FMM Red River Structure.
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22R0001
X 9B. DATED (SEE ITEM 11)
12-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Nov-2021
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Nov-2021 02:00 PM to 14-Dec-2021 02:00 PM.
The following have been added by full text:
AMENDMENT 0003 INSTRUCTIONS
1. W912ES22R0001 RRS SPECS
a. Section 01 14 00.00 13 WORK RESTRICTIONS, Paragraph 1.3 SUBMITTALS, SD-01 Preconstruction
Submittals:
Delete: “Professional Archaeologist Qualifications”
b. Section 01 14 00.00 13 WORK RESTRICTIONS, Paragraph 1.3 SUBMITTALS, SD-01 Preconstruction Submittals:
Add: “, ENV” after Archaeological Monitoring Plan; G
c. Section 01 14 00.00 13 WORK RESTRICTIONS, add paragraph:
“1.4 ARCHAEOLOGICAL MONITORING PLAN
A. Prepare a historical, archaeological, and cultural resources plan that:
1. Defines procedures for identifying and protecting historical, archaeological, and cultural resources known to be on the project site.
2. Identifies procedures to be followed if historical, archaeological, or cultural resources not previously known to be onsite or in the area are discovered during construction.
B. The plan shall include methods to assure the protection of known or discovered resources and shall identify lines of communication between the Contractor personnel and the Contracting Officer. “
d. Section 01 14 00.00 13 WORK RESTRICTIONS:
Delete: Paragraph 3.22 ARCHAEOLOGICAL CONSTRUCTION MONITORING in its entirety.
Delete: Paragraph 3.23 PRIVATE DRIVE RESTRICTIONS in its entirety.
e. Section 01 33 00 SUBMITTAL PROCEDURES:
Add the attached Submittal Register sheet to the existing Submittal Register.
f. Section 01 57 20.00 13 ENVIRONMENTAL PROTECTION, Paragraph 1.6 SUBMITTALS, SD-01 Preconstruction Submittals:
Add: “Professional Archaeologist Qualifications; G, ENV”
g. Section 01 57 20.00 13 ENVIRONMENTAL PROTECTION, Paragraph 3.7 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES:
Add:
“3.7.1 Construction Monitoring for Cultural Resources
Professional Archaeologist
Provide a qualified professional archaeologist to monitor earth moving construction in the work area within 328 feet (100 meters) of the top of bank of the Red River to a depth of 15 feet below the surface or to the Argusville Formation clays, and in areas of large-scale tree removal when the trees exceed the 100-meter perimeter. The construction monitoring area is as indicated in the attachment. An Archaeological Monitoring Plan shall be submitted as specified in Section 01 14 00.00 13 WORK RESTRICTIONS.
Any monitoring at a Traditional Cultural Property (TCP) location will also have a knowledgeable tribal representative present or available.
a. Professional Archaeologist Qualifications: Contractor's archaeologist must meet the professional qualifications standards for prehistoric archaeologists as given in the Secretary of the Interior's Standards and Guidelines for Archaeology and Historic Preservation and will be required to have an archaeological license from the Archaeology and Historic Preservation Division (SHPO) of the State Historical Society of North Dakota prior to conducting the monitoring and associated field work. In addition to these qualifications, the Contractor's archaeologist shall have at least one year of full-time professional experience at a supervisory level in the study of archaeological resources of the prehistoric period.”
h. Section 01 57 20.00 13 ENVIRONMENTAL PROTECTION, Paragraph 3.14 ATTACHMENTS, 1. STATE OF
NORTH DAKOTA PERMIT TO CONSTRUCT OR MODIFY A DAM is revised to read:
1. “STATE OF NORTH DAKOTA PERMIT TO CONSTRUCT OR MODIFY A DAM 11 PAGES”
Revised STATE OF NORTH DAKOT PERMIT TO CONSTRUCT OR MODIFY A DAM Permit is herein provided as an Attachment in this Amendment.
i. Section 01 57 20.00 13 ENVIRONMENTAL PROTECTION, Paragraph 3.14 ATTACHMENTS:
Add:
“7. AM100 LIMITS OF ARCHAEOLOCIAL MONITORING 1 PAGE”
“8. BUFFALO-RED RIVER WATERSHED DISTRICT RED RIVER CONTROL STRUCTURE APPROVAL LETTER 1
PAGE”
AM100 LIMITS OF ARCHAEOLOGICAL MONITORING and BUFFALO-RED RIVER WATERSHED DISTRICT RED RIVER CONTROL STRUCTURE APPROVAL LETTER are herein provided as Attachments in this Amendment.
j. Section 01 78 02.00 10 CLOSEOUT SUBMITTALS, Paragraphs
1.3 AS-BUILT DRAWINGS
1.3.1 Working Drawings
1.3.2 Final Drawings
1.3.3 Changes and Corrections
1.3.4 Drawing Standards
are deleted in their entirety.
Replace with:
“1.3 AS-BUILT DRAWINGS
1.3.1 Working Drawings
The Contractor shall maintain a separate set of marked-up full-scale drawings indicating as-built conditions. These drawings shall show all changes and revisions made up to the time the work is completed and accepted. These drawings shall be maintained in a current condition at all times until completion of the work and shall be available for review by Government personnel at all times. All work that differs from the drawings, including modifications and optional materials shall be indicated.
1.3.2 Interim As-Builts Drawings
An electronic copy and a full-size hardcopy of the Interim As-Builts Drawings shall be submitted.
In addition to the requirements below, the drawings shall be in accordance with the As-built Survey requirements as stated in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS
The Interim As-Builts Drawings shall be submitted 60 days after the feature is completed.
The features that require an interim as-built include the following:
Approach apron Approach walls (East & West) Control structure foundation, abutments and piers Stilling Basin and stilling basin walls Dam walls (East & West) Downstream retaining walls (East & West) Vehicle service bridge Mechanical platform Trunnion girders and anchorage system Bulkheads Tainter gates (after installation is complete) Crane platform (East & West) Gage wells (upstream & downstream) Stairs, handrails, dogging platforms, etc.
Dam embankments Site access roads
1.3.3 Final Drawings
An electronic copy A of the Final As-built Drawings shall be submitted. In addition to the requirements below, the drawings shall be in accordance with the As-built Survey requirements as stated in SECTION 01 71 23.05 13 CONTRACTOR SURVEYS
1.3.4 Changes and Corrections
The Final As-built Drawings and the Interim As-Builts Drawings shall include, but not be limited to, the following information:
a. Changes in grade, elevation, cross sections, location or alignment of roads, earthwork, structures or utilities.
b. Changes in details.
1.3.5 Drawing Standards
For the Final As-built Drawings and the Interim As-Builts Drawings
a. Deleted items shall be indicated in red.
b. Added items or changed locations shall be shown in green.
c. Variations shall be shown in the same general detail utilized in the contract drawings.
d. Revisions shall be shown on all drawings and details related to the changed feature.
e. All markups shall be neat, clean and legible.
f. Where contract drawings or specifications present options, only the option selected for construction shall be shown.”
k. Section 03 51 00.00 13 CAST-IN-PLACE ARCHITECTURAL CONCRETE, Paragraph 2.1.2.1 Stain Color:
Delete: “Stain 1 is SAE AMS-STD-595A color 33522 to be applied on smooth surfaces.
Stain 2 is SAE AMS-STD-595A color 33448 to be applied on the Form Liner”
Replace with: “The Contractor shall match the color used on the FMM Diversion Inlet Structure for Smooth Surface and Split Face Surface Stone.”
l. Section 05 50 16 SUPPORT GAGES is deleted its entirety and replaced with attached Section 05 50 16
GAGE SUPPORTS.
m. Section 05 51 33 METAL LADDERS is added per attachment.
n. Section 10 14 00.10 EXTERIOR SIGNAGE – GAUGES is deleted in its entirety and replaced with attached Section 10 14 00.10 STAFF GAGES.
2. W912ES22R0001 RRS PLANS
a. Replace plan sheet G-101 with the attached sheet G-101.
b. Replace plan sheet GC101 with the attached sheet GC101.
c. Replace plan sheet GC601 with the attached sheet GC601.
d. Replace plan sheet B-101 with the attached sheet B-101.
e. Replace plan sheet CD101 with the attached sheet CD101.
f. Replace plan sheet CD102 with the attached sheet CD102.
g. Replace plan sheet CP101 with the attached sheet CP101.
h. Replace plan sheet CP102 with the attached sheet CP102.
i. Replace plan sheet CS101 with the attached sheet CS101.
j. Replace plan sheet CS103 with the attached sheet CS103.
k. Replace plan sheet CS106 with the attached sheet CS106.
l. Replace plan sheet CS210 with the attached sheet CS210.
m. Replace plan sheet CS313 with the attached sheet CS313.
n. Replace plan sheet CS408 with the attached sheet CS408.
o. Replace plan sheet CS414 with the attached sheet CS414.
p. Replace plan sheet CS504 with the attached sheet CS504.
q. Replace plan sheet S-517 with the attached sheet S-517.
r. Replace plan sheet S-519 with the attached sheet S-519.
s. Replace plan sheet S-525 with the attached sheet S-525.
t. Replace plan sheet S-526 with the attached sheet S-526.
3. The As-Built Survey of the Red River Structure borrow area utilized by Industrial Builders, Inc. on the Interstate 29 Grade Raise and Borrow Ditch Crossing project is included for information purposes only. See attached file:
W912ES22R0001-0003 RR FINAL TOPSOIL US 10Nov21.xlsx.
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
BASIS OF AWARD
Award will be made to the responsible offeror representing the best value based on the Lowest Priced, Technically Acceptable (LPTA) proposal received in response to this Request for Proposals (RFP). Firms will be rated in accordance with the adjectival ratings of Acceptable or Unacceptable as noted in the table below. Each technical evaluation factor must be determined Acceptable for the proposal to be found technically acceptable. Proposals will not be ranked. Award will be made to the offeror providing the lowest priced, technically acceptable proposal.
Firms may only submit one proposal. Facsimile proposals will not be accepted. Offerors must propose pricing for all Contract Line Item Numbers (CLINs), including subCLINs, for their proposal to be considered for contract award.
Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
It is the offeror’s responsibility to ensure the completeness of its proposal. Incomplete proposals may not be considered for contract award. The Government may evaluate solely on the information provided in the initial proposal and not assume that an offeror possesses any capability that is not specifically identified in the proposal.
Firms are cautioned that the Government will make no inferences of experience or duration calculations based on general experience or resume submissions.
The Government intends to evaluate proposals and award a contract without discussions with offerors [except clarifications as described in FAR 15.306(a)]. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Procuring Contractitng Officer later determines them necessary. If discussions are opened and the Procuring Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Procuring Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Failure to submit required information for a factor, indicated by the word “shall” or similar verbiage below, will result in a rating of Unacceptable for that factor, and the offeror will be ineligible for award unless the Procuring Contracting Officer (PCO) decides to hold discussions and includes the offeror in the competitive range.
1. Proposal Submission Requirements
a. The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies as set forth below.
b. The offeror’s proposal shall consist of two volumes:
1) Volume 1-Technical proposal
2) Volume 2-Price proposal
c. Each hardcopy volume shall be submitted in separate three-ring binders that are clearly identified with project title, volume number, solicitation number W912ES22R0001, and the name and contact information of the offeror.
d. Facsimile of proposals and modifications thereto will not be accepted.
e. All pages in the Volume 1-Technical Proposal containing text in response to this RFP shall be consecutively numbered, type-written on 8.5” X 11” paper with margins of at least one inch, and use a font no smaller than 12 with a maximum of 50 pages printed double-sided (25 pieces of paper). Pages beyond the limitation will not be read nor evaluated. All pages of both volumes shall be identified by the prime offeror’s name in the header or footer. Text shall begin at the top of each page. Printing shall be single-spaced. Each paragraph shall be separated by at least one blank line. The submission shall be clearly indexed and logically assembled using a table of contents and tabbed dividers. Tables and illustrations shall use a font size of no less than 12-point. Management Team resumes shall be no more than two (2) pages each and shall be included in the Volume 1-Technical Proposal page count. The Technical Factor Submission Worksheets are included in the Volume 1-Technical Proposal page count. These formatting requirements and page limitations do not apply to the Letters of Commitment, the Mechanical Engineer’s license, nor the required AISC Certification detailed below. Tabbed dividers, the table of contents, or other means of providing an organized proposal do not count towards the page limitation.
f. There are no page limitations for the Volume 2-Price Proposal. All pages in the Price Proposal shall be consecutively numbered and include the prime offeror’s name in the header or footer.
g. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. The electronic files shall contain identical information to the hard copy files. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of their proposal. Proprietary information shall be clearly marked as such.
h. Electronic copies shall be submitted on CDs. Zip disks or external drives are not permitted. Self-extracting exe files are not acceptable. Files shall be in read-only format, using PDF files that are configured for printing by the Government. Each CD shall be externally labeled with the volume number, solicitation number, and offeror’s name. All hardcopy versions shall be identical, if the hardcopy versions differ from the electronic version, the hardcopy versions will govern.
i. Proposals shall be mailed, delivered by courier, or hand delivered to the following:
Mrs. Toni Wasgatt or Mr. Kevin Henricks Contracting Division U.S. Army Corps of Engineers, St. Paul District 180 5th Street E, Suite 700 St. Paul, MN 55101
Proposals must be received by the Government on or before the solicitation closing due date and time found in Block 13A of the SF1442 or as Amended.
j. Submit the following number of proposal copies:
Volume Number Offeror-signed Original
Number of Hardcopies Electronic version Number of copies
1-Technical Proposal 1 1 2-Price Proposal 1 1
2. Proposal Contents - Volume 1 and Volume 2
a. Volume 1-Technical Proposal shall include all of the following:
i) The offeror’s name, address, CAGE, DUNS, and telephone numbers with the signature, title, and email address of the person authorized to sign the proposal;
ii) Responses to all technical evaluation factors.
(1) Factors 1 through 5: Provide two (2) recent and relevant projects for each Technical Factors 1 through 5 using the attached Technical Factor Submission Worksheets. Ten (10) total worksheets shall be submitted. If more than ten (10) total worksheets are submitted in response to this solicitation, only the first two worksheets provided for each Technical Factor 1 through 5 will be read and evaluated. Incomplete Technical Factor Submission Worksheets may result in an Unacceptable rating for that factor.
(2) Factor 4: In addition to the two (2) Technical Factor Submission Worksheets, provide a copy of the license for the Mechanical Engineer and a letter of commitment between the Offeror and the Mechanical Engineer whose experience is submitted for this Technical Factor, that acknowledges that the Mechanical Engineer will be assigned to this contract. The requirements for a letter of commitment are stated below.
(3) Factor 6: For this technical evaluation factor, the Management Team is:
Project Manager – Responsible for overall contract administration and personnel management of the project management team.
Site Superintendent – The highest-level manager responsible for the overall construction activities at the site, including quality and production. The site project superintendent shall maintain a physical presence at the site at all times.
Quality Control Manager – Individual within the onsite work organization who shall be responsible for overall management of construction quality control matters.
Separate resumes for the Project Manager, the Site Superintendent, and the Quality Control Manager that demonstrate relevant experience shall be submitted for this factor. Relevant experience for the assigned role on the Red River Structure is demonstrated by past experience in that same role in accordance with Technical Evaluation Factor 6. For example, the resume submitted for the proposed RRS Project Manager must demonstrate at least five (5) years of experience as a Project Manager on other heavy civil construction projects that are valued (total price) at $25M dollars or more.
(4) Factor 7: One (1) Active AISC certification shall be submitted in response to this technical evaluation factor.
iii) Recent is defined as work that is ongoing but not less than 50% physically complete as of 01 October 2021, or work that was completed within the last 10 years (completed on or after 01 October 2011). The definitions of relevant are included within each of the technical factors below;
iv) If an offeror wishes to be credited with a subcontractor’s experience, certification, or license, a letter of commitment signed by both the subcontractor and the prime contractor (offeror) must be submitted with the proposal. Subcontractors may be, but are not limited to, suppliers, fabricators, or professional services. The letter of commitment shall clearly state that the offeror and the subcontractor have committed to construct the RRS project together if the offeror receives the contract award. For example, if Offeror A is demonstrating experience, certification, or license by submitting a project that was performed and completed by Subcontractor Z, then Offeror A must submit a signed letter of commitment between Offeror A and Subcontractor Z for the RRS project.
If a letter of commitment is not submitted, the experience/certification/license will not be considered; and,
v) Attachments to the Technical Factor Submission Worksheets for each project submitted as described in the Technical Factor Submission Worksheet.
vi) Volume 1-Technical Proposal shall not include pricing information.
b. Volume 2-Price Proposal shall include all of the following:
i) Completed and signed Standard Form (SF) 1442, including acknowledgement of all Amendments.
ii) The offeror's name, title and signature of the representative who is authorized to sign the proposal and legally bind the offeror. Include their telephone number and email address.
iii) Documentation verifying the individual noted above who signed the proposal and SF 1442 has the authority to bind the offeror, appropriate to the partnership, company, corporation, or joint venture demonstrating the business relationship such as copies of corporate resolutions, powers of attorney, or official meeting notes.
iv) Completed pricing schedule/schedule of items. Offerors shall complete and submit the final amended
(if applicable) schedule of items with their proposal and include a price for each contract line item number (CLIN) and subCLIN including subtotals (as applicable) and a contract total. Failure to provide complete pricing on all CLINs and subCLINs and a total price may result in the proposal being rejected without further consideration.
v) DUNS number, CAGE code, and TAX ID number.
vi) Proof of current System for Award Management (SAM) registration with your firm’s business size under the applicable North American Industry Classification System (NAICS) code for this acquisition: 237990-Other Heavy and Civil Engineering Construction.
vii) Firms must complete Federal Acquisition Regulation (FAR) and Defense Federal Acquisition
Regulation Supplement (DFARS) representations and certifications in its entity record at SAM.gov.
3. Basis of Award
a. Evaluation Factors:
i) Technical Factor 1: Fabrication of tainter gates, tainter valves, radial gates, miter gates, sector gates, or vertical lift gates.
Proposal must provide two (2) recent projects from the same firm or entity demonstrating experience in the fabrication of any of the following weighing 20 tons or more: tainter gates, tainter valves, radial gates, miter gates, sector gates, or vertical lift gates.
ii) Technical Factor 2: Installation of tainter gates, tainter valves, radial gates, miter gates, sector gates, or vertical lift gates.
experience in the installation of any of the following weighing 20 tons or more: tainter gates, tainter valves, radial gates, miter gates, sector gates, or vertical lift gates.
iii) Technical Factor 3: Mix design with thermal analysis and temperature monitoring of mass concrete.
experience in developing a mix design that includes thermal analysis and a temperature monitoring plan for 1,000 cubic yards or more of mass concrete in a single continuous (no cold or construction joints) concrete operation or placement, meeting the definition of mass concrete defined by the American Concrete Institute (ACI) Committee 207 as, “any volume of concrete in which a combination of dimensions of the member being cast, the boundary conditions, the characteristics of the concrete mixture, and the ambient conditions can lead to undesirable thermal stresses, cracking, deleterious chemical reactions, or reduction in long-term strength as a result of elevated concrete temperatures due to heat from hydration.”
iv) Technical Factor 4: Design of electro-mechanical gate operating machinery.
Proposal must provide two (2) recent projects demonstrating experience of a Mechanical Engineer, licensed (in any state or country) in the design of electro-mechanical gate operating machinery, with a rated capacity of 20 tons or more. The electro-mechanical gate operating machinery experience submitted for this factor MUST be the type that consists of an electric-motor-driven hoisting winch with a geared reduction. The Mechanical Engineer submitted as providing relevant experience must be the Mechanical Engineer used in the design of the electro-mechanical gate operating machinery for this RRS contract. A copy of the license for the professional Mechanical Engineer and a letter of commitment between the Offeror and the Mechanical Engineer must be provided.
v) Technical Factor 5: Manufacture and assembly of electro-mechanical gate operating machinery.
Proposal must provide two (2) recent projects from the same firm or entity demonstrating the manufacture and assembly of electro-mechanical gate operating machinery with a rated capacity of 20 tons. The electro-mechanical gate operating machinery submitted for this factor MUST be the type that consists of an electric-motor-driven hoisting winch with a geared reduction.
vi) Technical Factor 6: Management Team experience.
The Management Team is the Project Manager, Site Superintendent, and Quality Control Manager. Provide a resume (maximum of two (2) pages) for the individual that will be serving in each of these respective positions for this RRS contract. The experience for the Project Manager and the Site Superintendent shall be for at least five (5) years on heavy civil construction projects valued at $25 million dollars or more. In accordance with Section 01 45 04.00 13, paragraph 1.3.2, the experience for the Quality Control Manager shall be for a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 10 years’ experience in related duties on construction similar to this contract. A Quality Control Manager without a college degree with a minimum of 15 years of experience in related work is also acceptable. The resumes must clearly show the roles/responsibilities of the individuals being submitted for the management team roles on the RRS project. An individual being assigned one of the roles identified above did not need to have the exact title in the experience being presented but does need to have had the roles/responsibilities associated with that title. For example, the individual assigned as Quality Control Manager may have been a Project Manager on previous projects meeting the thresholds, but the resume must clearly detail how that individual managed and was involved in the responsibilities of quality control.
vii) Technical Factor 7: AISC Certification.
The fabricator of the tainter gate must be an American Institute of Steel Construction (AISC) certified plant with one of the active certification options listed below. An active certification is defined as in effect as of the date this solicitation closes, including any amended date. The AISC certification must remain active for the entire contract duration.
(1) IBR: Certified Bridge Fabricator – Intermediate (Major) with fracture critical endorsement
(FCE) and sophisticated paint endorsement (P1, P2, or P3); or,
(2) CBR: Major Steel Bridges with fracture critical endorsement (FCE) and sophisticated paint endorsement (P1, P2, or P3); or,
(3) ABR: Certified Bridge Fabricator – Advanced (Major) with sophisticated paint endorsement
(P1, P2, or P3); or,
(4) HYD: Certified Metal Hydraulic Fabricator with sophisticated paint endorsement (P1, P2, or
P3).
b. Approved Substitutions:
In connection with this contract, any in-house personnel, subcontractors, and suppliers will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Procuring Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, or suppliers. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Procuring Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.
4. Evaluation Process
a. After receipt of proposals, the Source Selection Evaluation Board (SSEB) will convene. Each member will independently evaluate all submitted proposals according to the evaluation factors set forth in the solicitation as amended, beginning with the Technical proposals. Once the Technical evaluations are completed, the SSEB Chairperson will lead the SSEB in discussions of each proposal, and they will come to a consensus decision as to the acceptability of each factor for each offeror. If the SSEB cannot achieve consensus, the Source Selection Authority (SSA) will resolve the matter. After concluding the evaluations, the SSEB Chairperson will provide an oral briefing of the consensus evaluation results to the SSA and submit a written consensus evaluation report for the record.
b. The written consensus report will detail the reasons for acceptability or unacceptability of proposals noted during the SSEB evaluation. The SSEB will make no recommendation as to which offeror shall receive the award and will not establish a ranking order or order of merit list pertaining to the offers begin evaluated.
Upon completion of the Technical Evaluation Report, the SSEB will evaluate all offered price proposals.
c. The SSEB will evaluate each offeror’s price in terms of unbalancing and for potential performance risks.
The PCO and Contract Specialist will evaluate each offeror’s price per FAR 15.404 to determine price reasonableness. Reasonableness will be determined by comparing offered prices to one another, to the Government estimate, and using pricing for previous work of a similar nature unless additional methods are required.
d. After receiving the SSEB Chairperson’s written, consensus evaluation report and briefing, the SSA, independently exercising his prudent business judgment, will make a source selection decision on the LPTA basis of award as solicited and amended. While the SSA may use reports and analyses prepared by others, the source selection decision is the SSA’s independent judgment. The source selection decision will be documented in the Source Selection Decision Document.
e. If during the evaluation process, any offerors are eliminated from the competition, they will be promptly notified in writing. The notice will state the basis for the elimination and that proposal revisions will not be considered. The PCO will award one contract to the successful, responsible, offeror by furnishing the executed contract or other notice of award to that offeror. Each offeror whose proposal was unsuccessful, will be notified in writing within three (3) days after the date of the contract award. Debriefings will be provided to all offerors who submit timely requests.
TECHNICAL FACTOR SUBMISSION WORKSHEET
W912ES22R0001 – Red River Structure
(provided as a separate attachment to this Solicitation)
Technical Factor Number: __________. Project Number __________ of 2 for this Factor.
1. Prime Offeror Name and Address:
2. Name and Address of the firm that completed the relevant work:
3. Was the relevant work completed under subcontract? Yes_____ No _____
4. Name of prime contractor for which this relevant work was completed:
5. Project Details Title: ___________________________________________________________________________ Location: ________________________________________________________________________ Contract Number: _________________________________________________________________ Total Cost: ______________________________________________________________________ Full contract start and completion dates: _______________________________________________
6. A Letter of Commitment is provided (if applicable): Yes_____ No_____ N/A______
7. An Engineer’s License is provided (if applicable): Yes_____ No_____ N/A______
8. Was the construction project complete or at least 50% complete as of 01 October 2021?
Yes_____ No_____ Completion Date: ___________________________________
9. Name, title, email address and phone number of the reference who can confirm this work:
10. Provide details of the project that support the technical evaluation criteria of the respective technical factor including, but not limited to, descriptions, pictures, or diagrams, as necessary.
11. Explain how this project meets each of the technical evaluation factors for which it was submitted.
(End of Worksheet)
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than as follows:
1. Site Work (includes cleanup of site premises minus turf establishment): 19 March 2026
2. Turf Establishment (includes final cleanup of premises): 19 March 2027
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 15 April 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)