This document is an Amendment to Solicitation W912ES22B0009 for the fabrication and delivery of replacement miter gates and associated ancillary equipment for Lock and Dam 3 and 4 on the Upper Mississippi River. The amendment revises the non-destructive testing requirements for the pintle balls, bushings, and socket castings. It extends the bid due date from August 8, 2024 to August 21, 2024. All other solicitation terms and conditions remain unchanged. The base contract is for the delivery of the Lock and Dam 4 gates in 2028, with the Lock and Dam 3 gates as a separately priced option with a delivery date in 2029. The work includes fabricating, testing, painting, prestressing, and delivering new lock chamber miter gate assemblies and disposing of the old miter gates. The solicitation is a total small business set-aside with a NAICS code of 332312 - Fabricated Structural Metal Manufacturing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES22B0009 Amendment 0003 Plans.pdf | ||
| W912ES22B0009 0003 Amendment 0003.pdf | ||
| W912ES22B0009 0002 Amendment 0002.pdf | ||
| Amendment 0002 Plans.pdf | ||
| W912ES22B0009 Amendment 0001 Plans.pdf | ||
| W912ES22B0009 0001 Amendment 0001.pdf | ||
| Attachment 2 - Source of Repair Instructions-VERSION2.1.pdf | ||
| W912ES22B0009_PLANS.pdf | ||
| Attachment 1 - Warranty Information-VERSION2.6.pdf | ||
| W912ES22B0009_SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make changes to the specif ications and extend the bid due date.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES22B0009
X 9B. DATED (SEE ITEM 11)
18-Jun-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jul-2024
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
SPECIFICATIONS
SECTION 05 50 13 MISCELLANEOUS METAL FABRICATIONS. Paragraph 3.9.2.1, which currently reads:
3.9.2.1 Pintle Balls, Bushings, and Pintle Socket Castings
Radiographic inspections must be performed by a Registered Radiographic Interpreter. Submit copies of certificates showing evidence of qualifications or certifications for radiographic interpreter. Provide a Registered Radiographic Interpretation Report With Films to the Contracting Officer for review and approval.
Perform radiographic testing of bushing and pintle balls in accordance with this section and specification section 35 20 16.33 GREASED PINTLE BALL AND BUSHING.
Perform visual and radiographic inspections of the bushings, pintle balls and sockets. Visual inspection and acceptance criteria in accordance with MSS SP-55. Procedures for making, evaluating, and reporting radiographic inspections must conform to the requirements of ASTM E94/E94M and ASTM E1030/E1030M.
The radiographic shooting diagram for bushings, pintle balls and sockets must be in accordance with ASTM E94/E94M. The castings are unacceptable if shown to have defects greater than the following severity levels (7-tables):
Is now changed to read:
3.9.2.1 Pintle Socket Castings
See SECTION 35 20 16.33 for Pintle Ball and Pintle Bushing non-destructive testing (NDT) requirements.
Perform visual and radiographic or ultrasonic inspections of the pintle socket castings. Visual inspection and acceptance criteria in accordance with ANSI/MSS SP-55. Procedures for making, evaluating, and reporting ultrasonic inspections must be in accordance with ASTM A609. Procedures for making, evaluating, and reporting radiographic inspections must be in accordance with ASTM E94.
Only ANSI/ANST CP-189 qualified personnel may perform radiographic or ultrasonic NDT. Submit personnel qualifications to the government prior to testing.
The radiographic shooting diagram for the pintle socket casting must be in accordance with ASTM
E94. The castings are unacceptable if shown to have defects greater than the following severity levels (3-tables):
SECTION 05 50 13 MISCELLANEOUS METAL FABRICATIONS, Paragraph 1.2 SUBMITTALS these sub-paragraphs currently read:
SD-06 Test Reports
Registered Radiographic Interpretation Report With Films; G, STR
SD-07 Certificates Anchorage Assembly Packing List; G Registered Radiographic Interpreter; G, STR
They are now changed to read, and submittal register updated accordingly:
SD-06 Test Reports has been removed
Anchorage Assembly Packing List; G
SECTION 35 20 16.33 GREASED PINTLE BALL AND BUSHING, Paragraph 1.2 SUBMITTALS, these sub-paragraphs currently read:
SD-03 Product Data:
Material Orders Submit copies of purchase orders, mill orders, shop orders and work orders for materials prior to the incorporation of the materials or components into the work
O-Ring Seal Catalog Cut Submit catalog cuts for the O-rings to include: method of splicing (bonding), material specifications, and dimensions.
Greased Pintle Ball Packing List; G
SD-06 Test Reports:
Non Destructive Testing Reports; G, MEC Registered Radiographic Interpretation Report With Films; G, STR
SD-07 Certificates:
Radius Certification; G, MEC Submit certification that the final machined hemispherical radii for each of the pintles and pintle bushings are within specified tolerances. The certification must be signed by the machinist and the shop's QA personnel
Pintle Bearing Hemisphere Centerpoint Location; G, MEC
Welder Qualification; G, MEC
Registered Radiographic Interpreter; G, STR
They are now changed to read, and submittal register updated accordingly:
SD-03 Product Data
Material Orders; G, MEC Submit copies of purchase orders, mill orders, shop orders and work orders for materials prior to the incorporation of the materials or components into the work
O-Ring Seal Catalog Cut Submit catalog cuts for the O-rings to include: method of splicing (bonding), material specifications, and dimensions.
Greased Pintle Ball Packing List; G
SD-06 Test Reports and Procedures
Radiographic Testing Procedure; G, MEC Ultrasonic Testing Procedure; G, MEC Radiographic Test Report; G, MEC Ultrasonic Test Report; G, MEC Liquid Penetrant Test Report; G, MEC
Radius Certification; G, MEC Submit certification that the final machined hemispherical radii for each of the pintles and pintle bushings are within specified tolerances. The certification must be signed by the machinist and the shop's QA personnel
Pintle Bearing Hemisphere Centerpoint Location; G, MEC
Welder Qualification; G, MEC
Certified ANSI/ASNT CP-189 Level II in Radiographic Testing (RT); G, MEC
Certified ANSI/ASNT CP-189 Level II in Penetrant Testing (PT); G, MEC Certified ANSI/ASNT CP-189 Level II in Ultrasonic Testing (UT); G, MEC American Welding Society Certified Welding Inspector (AWS CWI); G, MEC
SECTION 35 20 16.33 GREASED PINTLE BALL AND BUSHING Paragraph 2.1.3.1.1 Pintle Bushing Lifting Eyebolt, which currently reads:
Galvanized steel, 3/4"-10 UNC threads, minimum safe working load 5000 lbs. Certify eyebolts fit the bushing threads. These will be used for lifting pintle bushings in the field. Supply one (1) eyebolt per bushing plus one (1) additional spare. Detail included on drawings.
Galvanized steel, 3/4"-10 UNC threads, minimum safe working load 2500 lbs. Certify eyebolts fit the bushing threads. These will be used for lifting pintle bushings in the field. Supply one (1) eyebolt per bushing plus one (1) additional spare. Detail included on drawings.
SECTION 35 20 16.33 GREASED PINTLE BALL AND BUSHING Paragraph 3.2 PINTLE BUSHING MACHINING, which currently reads:
Machine the hemisphere surface to obtain the surface finish and tolerance required. Record and report the Pintle Bushing Hemisphere Centerpoint Location to the Contracting Officer for approval.
Mill two annular grooves into each pintle bushing hemisphere. The upper annular groove is the grease return channel. The lower annular groove is the O-ring seal recess.
Drill and tap the NPT threads specified on the drawing at the top of the bushing for grease connection.
As optional fabrication handling points, drill and tap the bores on top of each pintle bushing to accept a threaded eye bolt.
Machine the semicircular grease grooves last after resurfacing the hemispheres. Deburr and relieve all sharp edges on milled grooves.
"The aluminum bronze bushing is to be press fit into the pintle socket and secured by bolting to the socket. The amount of press fit of the bushing in the socket should be kept minimal" in accordance with USACE EM 110-2-2610. This is to "prevent any alteration of the machined fit between the bushing and pintle ball after assembly." The outer pintle bushing diameter must be 1'- 6" +0.003/+0.001 after machining. The pintle socket inner diameter must be 1'-6" +0.001/-0.000.
This must result in a modified FN1 fit. Confirmation of dimensions for the pintle socket may be obtained by contacting the Contracting Officer.
Machine the hemisphere surface to obtain the surface finish and tolerance required. Record and report the Pintle Bushing Hemisphere Centerpoint Location to the Contracting Officer for approval.
Mill two annular grooves into each pintle bushing hemisphere. The upper annular groove is the grease return channel. The lower annular groove is the O-ring seal recess.
Drill and tap the NPT threads specified on the drawing at the top of the bushing for grease connection.
As optional fabrication handling points, drill and tap the bores on top of each pintle bushing to accept a threaded eye bolt.
Machine the semicircular grease grooves last after resurfacing the hemispheres. Deburr and relieve all sharp edges on milled grooves.
"The aluminum bronze bushing is to be press fit into the pintle socket and secured by bolting to the socket. The amount of press fit of the bushing in the socket should be kept minimal" in accordance with USACE EM 110-2-2610. This is to "prevent any alteration of the machined fit between the bushing and pintle ball after assembly." The outer pintle bushing diameter must be 1'- 6" +0.003/+0.001 after machining. The pintle socket inner diameter must be 1'-6" +0.001/-0.000.
This must result in a modified FN1 fit. Confirmation of dimensions for the pintle socket may be obtained by contacting the Contracting Officer.
Permanently label each pintle and bushing on a non-mating surface by engraving, stamping or laser etching a serial number. The serial numbers must be at least 12 font and follow the convention XXXXXXX-PN-001, where the first seven numbers (XXXXXXX) are the contract number, PN designates pintle, and the last three numbers are the individual identifier (example:
1111111-PN-001, 1111111-PN-002..., 1111111-PN-008).
SECTION 35 20 16.33 GREASED PINTLE BALL AND BUSHING, Paragraph 3.4.2 Welding of Steel Forgings, which currently reads:
Remove unsound material from the surfaces of steel forgings to be incorporated into welded connections by chipping, machining, air-arc gouging or grinding. Major connections designed for the transfer of stresses must not be welded if the temperature of the forging is lower than 100 degrees Fahrenheit. Preheat forgings containing over 0.35 percent carbon or over 0.75 percent manganese to a temperature not to exceed 450 degrees Fahrenheit and accomplish welding while the forgings are maintained at a temperature above 350 degrees Fahrenheit. Welding will not be permitted on forgings containing carbon in excess of 0.45 percent, except when authorized in writing. Forgings requiring welded repairs after the first annealing and forgings involving welding fabrication must be stress-relieved annealed prior to receiving final machining unless otherwise permitted.
Remove unsound material from the surfaces of steel forgings to be incorporated into welded connections by chipping, machining, air-arc gouging or grinding. Major connections designed for the transfer of stresses must not be welded if the temperature of the forging is lower than 100 degrees Fahrenheit. Preheat forgings containing over 0.35 percent carbon or over 0.75 percent manganese to a temperature not to exceed 450 degrees Fahrenheit and accomplish welding while the forgings are maintained at a temperature above 350 degrees Fahrenheit. Welding will not be permitted on forgings containing carbon in excess of 0.45 percent, except when authorized in writing. Forgings requiring welded repairs after the first annealing and forgings involving welding fabrication must be stress-relieved annealed prior to receiving final machining unless otherwise permitted.
All weld repairs must be inspected and approved by an American Welding Society Certified Welding Inspector (AWS CWI).
SECTION 35 20 16.33 GREASED PINTLE BALL AND BUSHING, which currently reads:
3.4.5 Inspection of Castings and Forgings
Perform radiographic inspections of all castings and forgings in accordance with this section and specification section 05 50 13 MISCELLANEOUS METAL FABRICATIONS. The castings and forgings are unacceptable if shown to have defects of greater severity than the applicable reference standards specified in specification section 05 50 13 MISCELLANEOUS METAL
FABRICATIONS.
Radiographic inspections must be performed by a registered radiographic interpreter. Submit copies of certificates showing evidence of qualifications or certifications for radiographic interpreter. Provide a registered radiographic interpretation report with films to the Contracting Officer for review and approval.
3.4.5.1 Bushings and Pintle Balls
The procedure for making, evaluating, and reporting the radiographic inspections must conform to the requirements of ASTM E 94. Each pintle bushing, ball and fabricated pintle component must have the following NDT testing performed.
a. Pintle ball: radiographic testing per ASTM E94/E94M, ASTM E1742/E1742M, ASTM E1030/E1030M, and ASTM E1032.
b. Pintle bushing: radiographic testing per ASTM E94/E94M, ASTM E1742/E1742M, ASTM E1030/E1030M, and ASTM E1032.
c. Other fabricated pintle components: magnetic particle testing in accordance with supplementary requirement S3.1 of ASTM A290/A290M. Other NDT methods are subject to Government approval
Only ANSI/ASNT CP-189, ASNT SNT-TC-1A, AIA/NAS NAS410 qualified personnel may perform radiographic NDT testing. Radiographic acceptance criteria for castings and forgings satisfies the minimum severity level requirements for a Grade I condition as defined by ASTM E1955.
Any cracks found are unacceptable and reason for immediate rejection. The castings are unacceptable if shown to have defects greater than the severity levels listed in the tables in section 05 50 13 MISCELLANEOUS METAL FABRICATIONS. Evaluate all relevant indications greater than 1/16 inch in length present on radiographic films against the specified acceptance criteria where the length of each indication (li) within an area of interest and along a continuous straight line oriented in the direction of interest are measured. If the distance between two indications is smaller in length than the length of the smaller indication, then both indications must be added and treated as a single indication to include the distance of both indications as well as the distance between the indications. The total indication length is obtained as the sum of all indication lengths on a straight line within the area of interest. The maximum total indication length (lim) on any such single straight line is used to assess acceptance of the casting being evaluated.
This maximum total indication length (lim) is divided by the feature length (Lf), where (Lf) equals 1-1/8 inches, to calculate the indication fraction F (F = lim / Lf). The value of indication fraction F must be acceptable for values less than a Level I F=0.1. Provide 7-day advance notice of the NDT testing and perform all testing in the presence of the Contracting Officer. If testing and certification is not performed in the presence of the Contracting Officer, the Government reserves the right to perform independent quality verification, at the expense of the Contractor, and the acceptable total indication length (lim) for the acceptable indication fraction Level will be increased by 1/16 inch for the calculation to account for reproducibility in the evaluation. The manufacturer must certify in writing that the inspection was performed in accordance with the requirements specified and found to meet or exceed the requirements of the specified inspection level.
3.5 Pintle Socket Casting
This section covers components to be furnished for Greased Pintle Balls and Greased Pintle Bushings. Fabricate the pintle socket casting in accordance with ASTM A148/A148M Grade 80-
50. See section 05 50 13 for information on the pintle casting sockets and nondestructive testing for all castings included in this contract.
Is now changed to read
3.4.5 Inspection of Castings and Forgings
After casting or forging is complete and prior to any machining, a radiographic or ultrasonic inspections must be performed on all castings and forgings and must be performed by a Certified ANSI/ASNT CP-189 Level II in Radiographic Testing (RT), Certified ANSI/ASNT CP-189 Level II in Ultrasonic Testing (UT), or Certified ANSI/ASNT CP-189 Level II in Penetrant Testing (PT) personnel. Submit copies of certificates showing evidence of qualifications or certifications.
Submit the Radiographic Testing Procedure or Ultrasonic Testing Procedure prior to inspection.
Once the inspection is complete, submit the Radiographic Test Report or Ultrasonic Test Report, and the Liquid Penetrant Test Report. All nondestructive testing reports must be submitted to the QA inspector prior to final acceptance.
Perform visual and radiographic or ultrasonic inspections of the bushings and pintle balls. Visual inspection and acceptance criteria in accordance with ANSI/MSS SP-55. Procedures for making, evaluating, and reporting ultrasonic inspections must be in accordance with ASTM A388.
Procedures for making, evaluating, and reporting radiographic inspections must conform to the requirements of ASTM E94/E94M and ASTM E1030/E1030M. All radiographic or ultrasonic inspection work must be completed by an ANSI/ASNT CP-189 qualified person.
The radiographic shooting diagram for pintle bushings and pintle balls must be in accordance with ASTM E94/E94M. The castings and forgings are unacceptable if shown to have defects greater than the following severity levels:
Pintle Bushing; ASTM E272 (Cu and Ni based alloy castings) Radiographic Indication Acceptance Criteria Description Code Severity Level Gas Porosity A 3 Sand Inclusions Ba 3 Dross Inclusions Bb 2 Shrinkage, Linear Ca 3 Shrinkage, Feathery Cd 3 Shrinkage, Spongy Cd 3 Cracks None Allowed
Hot Tears None Allowed Chaplets None Allowed
Pintle Ball; ASTM E446 (thickness up to 2 inches)
Category Description Severity Level A Gas Porosity 3 B Sand and Slag Inclusions 2 C Shrinkage
CA 2
CB 1
CC 2
CD 1
D Cracks None Allowed E Hot Tears None Allowed F Inserts None Allowed
Pintle Ball; ASTM E186 (thickness 2 to 4 ½ inches)
Category Description Severity Level A Gas Porosity 4 B Sand and Slag Inclusions 3 C Shrinkage Type 1 3 Type 2 3 Type 3 3 D Cracks None Allowed
F Inserts None Allowed, unfused
Pintle Ball; ASTM E280 (thickness 4 ½ to 12 inches)
Category Description Severity Level A Gas Porosity 4 B Sand and Slag Inclusions 4 C Shrinkage Type 1 3 Type 2 3 Type 3 3 D Cracks None Allowed
F Inserts None Allowed
3.4.5.1 Pintle Balls, Pintle Bushings, and Components
All pintle bushings, balls and fabricated pintle components must have the following NDT testing performed.
• Pintle ball: radiographic testing per ASTM E94/E94M, ASTM E1742/E1742M, ASTM
E1030/E1030M, and ASTM E1032 or ultrasonic testing per ASTM A388
• Pintle bushing: radiographic testing per ASTM E94/E94M, ASTM E1742/E1742M, ASTM
E1030/E1030M, and ASTM E1032 or ultrasonic testing per ASTM A388
• Set screws, key screw, and key: liquid penetrant testing per ASTM E1417/E1417M, Type 1
- Fluorescent dye, Sensitivity Level 3 – High, no cracks allowed
Only an ANSI/ASNT CP-189 qualified person may perform radiographic NDT testing.
Radiographic acceptance criteria for castings and forgings satisfies the minimum severity level requirements for a Grade I condition as defined by ASTM E1955.
Only an ANSI/ASNT CP-189 qualified person may perform ultrasonic testing.
Any cracks found are unacceptable and reason for immediate rejection. Evaluate all relevant indications greater than 1/16 inch in length present on radiographic films against the specified acceptance criteria where the length of each indication (li) within an area of interest and along a continuous straight line oriented in the direction of interest are measured. If the distance between two indications is smaller in length than the length of the smaller indication, then both indications must be added and treated as a single indication to include the distance of both indications as well as the distance between the indications. The total indication length is obtained as the sum of all indication lengths on a straight line within the area of interest. The maximum total indication length (lim) on any such single straight line is used to assess acceptance of the casting being evaluated.
This maximum total indication length (lim) is divided by the feature length (Lf), where (Lf) equals 1-1/8 inches, to calculate the indication fraction F (F = lim / Lf). The value of indication fraction F must be acceptable for values less than a Level I F=0.1. Provide 7-day advance notice of the NDT testing and perform all testing in the presence of the POC. If testing and certification is not performed in the presence of the POC, the Government reserves the right to perform independent quality verification, at the expense of the Contractor, and the acceptable total indication length (lim) for the acceptable indication fraction Level will be increased by 1/16 inch for the calculation to account for reproducibility in the evaluation. The manufacturer must certify in writing that the inspection was performed in accordance with the requirements specified and found to meet or exceed the requirements of the specified inspection level.
3.5 Pintle Socket Casting
Perform visual and radiographic or ultrasonic inspection of the pintle socket castings in accordance with Section 05 50 13 paragraph 3.9.2.1.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Aug-2024 02:00 PM to 21-Aug-2024 02:00 PM.
(End of Summary of Changes)