Text version
W81G6791628773
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to change the solicitation as follow s:
(1) The closing date and time for bids is changed to 02:00 PM local time 15 December 2009.
(2) Replace the Bid Schedule as show n in the Summary of Changes.
(3) Add the follow ing clauses that apply to sealed bid actions; 52.211-5000 and 52.211-5001.
-----See BLOCK 14 CONTINUATION PAGE beginning on page 2 of this SF30 for further changes-----
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-09-B-0008
X 9B. DATED (SEE ITEM 11)
30-Sep-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2009
CODE
CONTRACTING DIVISION
USACE - ST. PAUL�
190 5TH STREET E
ST. PAUL MN 55101
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-09-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
(CONT FROM BLOCK 14 SF 30)
AMENDMENT 0002 CONTINUED
(4) Replace paragraph 1.5.2 On – Site Haul Roads in Section 01 50 02.00 13 with the following paragraph:
1.5.2 On – Site Haul Roads
The Contractor shall, at its own expense, construct access and haul roads necessary for proper prosecution of the work under this contract. Haul roads shall be constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided. The Contractor shall provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control chosen by the Contractor shall be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads shall be subject to approval bythe Contracting Officer. Lighting shall be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Upon completion of the work, haul roads shall be modified to meet the requirements for the access trail as specified in Section 35 31 19.00 13 STONE PROTECTION.
(5) Replace paragraph 3.7 ACCESS TRAIL in Section 35 31 19.00 13 with the following paragraph:
3.7 ACCESS TRAIL
If a construction haul road is required it shall follow the designed access trail alignment. The haul road may bypass channel closure structures within the limits of work. Prior to any high water events which will overtop the existing grades along the access trail alignment, the top of the haul road shall be restored to original ground elevations. Only trees that are required to be removed to construct the designed access trail shall be removed to construct the haul road. Trees outside the footprint of the access trail shall be protected from damage. Individual trees outside the footprint of the access trail may be removed at no additional expense to the Government if approved by the Contracting Officer after coordination with the WIDNR. When the haul road is no longer needed, it shall be reshaped to the configuration of the access trail and proof rolled. Areas outside the footprintof the access trail shall be restored to their original condition and seeded. Following is the minimum criteria for access trail construction:
a. Strip and dispose of at least the top 6 inches of material.
b. Furnish and provide a minimum of 6 inches of breaker run material.
c. Proof – roll the access trail as specified in paragraph 3.7.1 below. If displacement occurs, the Contractor shall immediately notify the Contracting Officer. At the direction of the Contracting Officer the Contractor shall furnish and install additional breaker rock and repeat the proof-rolling process. This process shall be repeated until no noticeable displacement is observed during proof-rolling. The Contractor shall be reimbursed for additional breaker rock at the bid price for the “over” split bid item for Breaker Rock for Minimum Access Trail Section.
d. Furnish and install aggregate surface course material, chinking the breaker run to provide a smooth, 10 foot wide driving surface at the design elevation.
(6) Delete paragraph 2.2.2.3 Welding of Steel Studs in Section 05 50 00 in its entirety.
(7) Replace Section 01 14 00.00 13 Work Restrictions with LD3 AMEND 0002 SECTION 01 14 00.00 13 WORK RESTRICTIONS.pdf.
(8) Replace Section 01 22 00.00 13 Measurement and Payment with LD3 AMEND 0002 SECTION 01 22 00.00 13 MEAS AND PAY.pdf
(9) Add LD3 AMEND 0002 SECTION 01 42 00 SOURCES FOR REF PUB.pdf.
(10) Replace submittal register with LD3 AMEND 0002 SUBMITTAL REGISTER.pdf
(11) References listed in LD3 Amend 0002 REFERENCES ADDED TO SPEC SECTIONS.pdf have been added to the specifications.
(12) Section 00 83 00.00 List of Attachments has been added to the specification. Attachment B Material Sources has been modified to delete Note 3, which refers to the Government government purchasing material from one of the listed sources. The Government will not be purchasing material for the Contractor. The listed source that referenced Note 3 was also deleted.
(13) Replace the latest DOL Wage Rates
(14) Reference Clause 52.211-10Alt1, Change the Proceed date from 16 November 2009 to 18 January 2010 and the Completion date from 15 September 2011 to 31 December 2011.
(15) Replace Structural Drawings S-401, S-302, S-203, S-504, S-105 and S-206 on the half and full size.
All other terms and conditions remain unchanged.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
BID SCHEDULE
BID SCHEDULE
ITEM UNIT TOTAL
NO DESCRIPTION QTY UNIT PRICE AMOUNT
1 Stripping 1 LS
2. Clearing and Grubbing 1 LS
3. Protection for 1 LS Cultural Resource
4. Contractor Haul Road 1 LS
5. Excavation
5AA First 10,500 CY 10,500 CY
5AB Over 10,500 CY 3,100 CY
6. Geotextile 6,600 SY
7. Aggregate Surface Material for Minimum Access Trail Section and Spot Dikes
7AA First 1,200 Tons 1,200 TN Cover
7AB Over 1,200 Tons 300 TN
8. Breaker Rock for Minimum Access Trail Section
8AA First 2,400 Tons 2,400 TN
8AB Over 2,400 Tons 700 TN _______________ ____________
9. 24” Riprap 4,140 TN _______________ ____________
10. 36” Riprap 2,010 TN _______________ ____________
11. B2 Bedding 7,610 TN _______________ ___________
12. Sheetpile 100,475 SF _______________ ___________
13. Control Structure 1 LS _______________ ___________
14. Vehicle Gate 1 EA _______________ ___________
15. Topsoil & Seeding 1 LS _______________ ___________
TOTAL
WAGE RATES
General Decision Number: WI080019 10/30/2009 WI19
Superseded General Decision Number: WI20070019
State: Wisconsin
Construction Type: Heavy
Counties: Wisconsin Statewide.
HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines), AND HOPPER DREDGE PROJECTS
Modification Number Publication Date 0 02/08/2008 1 02/29/2008 2 05/02/2008 3 06/13/2008 4 06/27/2008 5 07/11/2008 6 07/25/2008 7 08/08/2008 8 08/15/2008 9 08/22/2008 10 08/29/2008 11 09/12/2008 12 10/03/2008 13 11/07/2008 14 12/19/2008 15 02/20/2009 16 03/13/2009 17 03/20/2009 18 05/29/2009 19 06/05/2009 20 06/26/2009 21 07/03/2009 22 07/10/2009 23 08/07/2009 24 08/21/2009 25 10/30/2009
BOIL0107-001 07/01/2009
Rates Fringes
BOILERMAKER
Boilermaker.................$ 33.64 19.27 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00
BRWI0001-002 06/01/2008
CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND
VERNON COUNTIES
BRICKLAYER.......................$ 29.24 13.80
BRWI0002-002 06/01/2008
ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 35.24 13.35
BRWI0002-005 06/01/2008
ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,
CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,
FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,
LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,
OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,
SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,
WINNEBAGO, AND WOOD COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 28.15 12.80
BRWI0003-002 06/01/2008
BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 29.24 13.80
BRWI0004-002 06/01/2008
KENOSHA, RACINE, AND WALWORTH COUNTIES
BRICKLAYER.......................$ 32.88 14.50
BRWI0006-002 06/01/2008
ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,
ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES
BRICKLAYER.......................$ 29.74 13.30
BRWI0007-002 06/01/2008
GREEN, LAFAYETTE, AND ROCK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.41 14.30
BRWI0008-002 06/01/2008
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
BRICKLAYER.......................$ 32.71 14.54
BRWI0009-001 06/01/2008
GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA,
AND WINNEBAGO COUNTIES
BRWI0011-002 06/01/2008
CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES
BRWI0013-002 06/01/2008
DANE, GRANT, IOWA, AND RICHLAND COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.61 14.10
BRWI0019-002 06/01/2008
BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,
PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES
BRICKLAYER.......................$ 28.99 14.05
BRWI0021-002 06/01/2008
DODGE AND JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.88 13.85
BRWI0034-002 06/04/2007
COLUMBIA AND SAUK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 30.66 14.05
CARP0087-001 05/01/2007
BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES
Carpenter & Piledrivermen........$ 26.76 11.61
CARP0252-002 06/01/2009
ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.
of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
CARPENTER
CARPENTER...................$ 29.06 13.36
MILLWRIGHT..................$ 30.66 13.36
PILEDRIVER..................$ 29.56 13.36
CARP0252-010 05/27/2007
ASHLAND COUNTY
Rates Fringes
Carpenters Carpenter...................$ 23.82 11.26 Millwright..................$ 27.71 11.26 Pile Driver.................$ 24.81 10.43
CARP0264-003 06/01/2008
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON
CARPENTER........................$ 30.52 14.41
CARP0361-004 05/01/2008
BAYFIELD (Western 1/3) AND DOUGLAS COUNTIES
Rates Fringes
CARPENTER........................$ 29.77 13.40
CARP2337-001 06/01/2008
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON
ZONE B: KENOSHA & RACINE
PILEDRIVERMAN
Zone A......................$ 27.25 19.46 Zone B......................$ 24.47 19.46
CARP2337-003 06/02/2008
Rates Fringes
MILLWRIGHT
Zone A......................$ 27.92 19.08 Zone B......................$ 26.82 19.08
ZONE DEFINITIONS
ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES
ZONE B: KENOSHA & RACINE COUNTIES
ELEC0014-002 06/01/2009
ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK
(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA
CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST
CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN
Electricians:....................$ 28.74 35.25%+8.82
ELEC0127-002 06/01/2008
KENOSHA COUNTY
Rates Fringes
Electricians:....................$ 33.59 28%+7.56
ELEC0158-002 06/02/2008
BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES
Electricians:....................$ 27.27 26.75%+7.62
ELEC0159-003 06/01/2009
COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK
Electricians:....................$ 31.61 28%+8.95
ELEC0219-004 06/01/2009
FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)
Electricians:
Electrical contracts over $90,000.....................$ 28.39 3.75%+14.95 Electrical contracts under $90,000.....................$ 26.19 3.75%+14.95
ELEC0242-005 05/31/2009
DOUGLAS COUNTY
Rates Fringes
Electricians:....................$ 31.24 63.5%
ELEC0388-002 03/01/2007
ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Area North of the town of Wausaukee), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Area North of the townships of Aniwa and Hutchins), VILAS AND WOOD COUNTIES
Electricians:....................$ 27.68 15.23
ELEC0430-002 06/01/2009
RACINE COUNTY (Except Burlington Township)
Rates Fringes
Electricians:....................$ 32.53 3%+17.59
ELEC0494-005 06/01/2009
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Electricians:....................$ 31.10 14.85%+$15.70
ELEC0494-006 06/01/2008
CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES
Electricians:....................$ 28.33 3%+$17.21
ELEC0577-003 06/01/2009
CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO
Electricians:....................$ 27.40 26.5%+8.90
ELEC0890-003 06/01/2009
DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES
Electricians:....................$ 29.10 27.95%+8.92
ELEC0953-001 06/01/2008
Rates Fringes
Line Construction:
(1) Lineman.................$ 34.57 4.75+29%
(2) Heavy Equipment Operator....................$ 31.11 4.75+29%
(3) Equipment Operator......$ 27.66 4.75+29%
(4) Heavy Groundman Driver..$ 24.20 4.75+29%
(5) Light Groundman Driver..$ 22.47 4.75+29%
(6) Groundsman..............$ 19.01 4.75+29%
* ENGI0139-001 06/01/2009
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA
Power Equipment Operator Group 1.....................$ 36.56 17.30 Group 2.....................$ 36.06 17.30 Group 3.....................$ 35.56 17.30 Group 4.....................$ 35.12 17.30 Group 5.....................$ 33.24 17.30 Group 6.....................$ 28.09 17.30
EPA PREMIUMS:
Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.
$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.
GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.
GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting
Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;
Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over
GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);
Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;
Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.
GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;
Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);
Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;
Robotic Tool Carrier with or without attachments
GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;
Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);
Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);
Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;
Conveyor; Forklifts/Telehandler 8000 lbs & under;
Elevators: Automatic Hoists; Pumps (well points);
Combination Small Equipment Operators
ENGI0139-003 06/01/2009
REMAINING COUNTIES
Rates Fringes
Power Equipment Operator Group 1.....................$ 33.37 16.95 Group 2.....................$ 32.37 16.95 Group 3.....................$ 31.42 16.95 Group 4.....................$ 30.89 16.95 Group 5.....................$ 28.82 16.95 Group 6.....................$ 28.19 16.95
EPA PREMIUMS:
Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;
Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.
GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;
Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;
Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver
GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;
Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor;
Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump.
GROUP 4: Hydraulic Backhoe (tractor or truck mounted);
Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or
End Loader (over 40 hp); Motor Patrol; Scraper Operator;
Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);
Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Material Haulers.
GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);
Tampers -Compactors, riding type; Stump Chipper, large;
Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large;
Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;
Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer
GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;
Generators; Pumps over 3"; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler;
Greaser; Rotary Drill Tender; Conveyor; Elevator Operator
IRON0008-002 06/01/2008
BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,
MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO
COUNTIES:
IRONWORKER.......................$ 27.73 19.04
IRON0008-003 06/01/2009
KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),
WASHINGTON, AND WAUKESHA COUNTIES
IRONWORKER.......................$ 30.51 20.59
IRON0383-001 06/01/2009
ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,
GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES
IRONWORKER.......................$ 30.90 17.13
IRON0512-008 05/01/2009
BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,
PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU
IRONWORKER.......................$ 33.80 20.44
IRON0512-021 05/01/2009
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,
PRICE, SAWYER, VILAS AND WASHBURN COUNTIES
IRONWORKER.......................$ 29.76 19.50
LABO0113-002 06/01/2008
MILWAUKEE AND WAUKESHA COUNTIES
Rates Fringes
Laborers:
Group 1.....................$ 23.26 14.18 Group 2.....................$ 23.41 14.18 Group 3.....................$ 23.61 14.18 Group 4.....................$ 23.76 14.18 Group 5.....................$ 23.91 14.18 Group 6.....................$ 19.75 14.18
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning TOrch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagperson; traffic control person
LABO0113-003 06/01/2008
OZAUKEE AND WASHINGTON COUNTIES
Laborers:
Group 1.....................$ 22.51 14.18 Group 2.....................$ 22.61 14.18 Group 3.....................$ 22.66 14.18 Group 4.....................$ 22.86 14.18 Group 5.....................$ 22.71 14.18 Group 6.....................$ 19.60 14.18
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated);
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson and Traffic Control Person
LABO0113-011 06/01/2008
KENOSHA AND RACINE COUNTIES
Rates Fringes
LABORERS
Group 1.....................$ 21.52 14.98 Group 2.....................$ 21.67 14.98 Group 3.....................$ 21.87 14.98 Group 4.....................$ 21.84 14.98 Group 5.....................$ 22.17 14.98 Group 6.....................$ 18.66 14.98
LABORERS CLASSIFICATIONS:
GROUP 1: General laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster and Powderman
GROUP 6: Flagman; traffic control person
LABO0140-002 06/01/2008
ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,
CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,
DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,
GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,
JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,
MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,
OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,
RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.
CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,
WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES
Laborers:
Group 1.....................$ 23.87 11.75 Group 2.....................$ 23.97 11.75 Group 3.....................$ 24.02 11.75 Group 4.....................$ 24.22 11.75
Group 5.....................$ 24.07 11.75 Group 6.....................$ 20.50 11.75
LABORERS CLASSIFICATIONS
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;
Bituminous Worker (Dumper, Ironer, Smoother and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated)
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk and Pavement); Strike Off Man
GROUP 4: Line and Grade Secialist
GROUP 5: Blaster; powderman
GROUP 6: Flagperson; Traffic Control
LABO0464-003 06/01/2008
DANE COUNTY
Rates Fringes
Laborers:
Group 1.....................$ 24.15 11.75 Group 2.....................$ 24.25 11.75 Group 3.....................$ 24.30 11.75 Group 4.....................$ 24.50 11.75 Group 5.....................$ 24.35 11.75 Group 6.....................$ 20.50 11.75
LABORERS CLASSIFICATIONS:
GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;
Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;
Stone Handler; Bituminous Worker (Shoveler, Loader, and
Utility Man); Batch Truck Dumper or Cement Handler;
Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);
Concrete Handler
GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer
GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man
GROUP 4: Line and Grade Specialist
GROUP 5: Blaster; Powderman
GROUP 6: Flagperson and Traffic Control Person
PAIN0106-008 05/01/2008
ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES
Rates Fringes
Painters:
New:
Brush, Roller..............$ 27.41 12.52 Spray, Sandblast, Steel....$ 28.01 12.52 Repaint:
Brush, Roller..............$ 25.91 12.52 Spray, Sandblast, Steel....$ 26.51 12.52
PAIN0108-002 06/01/2009
RACINE COUNTY
Rates Fringes
Painters:
Brush, Roller...............$ 28.00 15.24 Spray & Sandblast...........$ 29.00 15.24
PAIN0259-002 05/01/2008
BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,
SAWYER, ST. CROIX, AND WASHBURN COUNTIES
PAINTER..........................$ 24.11 12.15
PAIN0259-004 05/01/2008
BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND
PAINTER..........................$ 20.43 8.40
PAIN0781-002 06/01/2009
JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
Painters:
Bridge......................$ 27.47 14.39 Brush.......................$ 27.12 14.39 Spray & Sandblast...........$ 27.87 14.39
PAIN0802-002 06/01/2009
COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,
ROCK, AND SAUK COUNTIES
PAINTER
Brush.......................$ 25.65 13.10
PREMIUM PAY:
Structural Steel, Spray, Bridges = $1.00 additional per hour.
PAIN0802-003 06/01/2009
ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN
LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,
MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,
OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,
WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES
PAINTER..........................$ 21.87 10.07
PAIN0934-001 06/01/2008
KENOSHA AND WALWORTH COUNTIES
Rates Fringes
Painters:
Brush.......................$ 27.10 14.14 Spray.......................$ 28.10 14.14 Structural Steel............$ 27.15 14.14
PAIN1011-002 06/01/2009
FLORENCE COUNTY
Rates Fringes
Painters:........................$ 23.40 8.57
PLAS0599-010 06/01/2007
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
Area 1......................$ 28.27 12.73 Area 2 (BAC)................$ 28.15 12.80 Area 3......................$ 26.10 13.65 Area 4......................$ 26.82 12.93 Area 5......................$ 26.97 12.78 Area 6......................$ 24.08 15.67
AREA DESCRIPTIONS
AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN
AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,
CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,
FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,
LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,
MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,
PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,
VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD
COUNTIES
AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA
CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND
AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK
AREA 6: KENOSHA AND RACINE COUNTIES
PLUM0011-003 05/01/2008
ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, SAWYER, AND WASHBURN
PLUMBER..........................$ 33.70 14.35
PLUM0075-002 06/01/2009
MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES
Rates Fringes
PLUMBER..........................$ 35.28 14.96
PLUM0075-004 06/01/2009
DODGE (Watertown), GREEN, JEFFERSON, LAFAYETTE, AND ROCK
PLUMBER/PIPEFITTER...............$ 35.53 14.96
PLUM0075-009 06/01/2008
COLUMBIA, DANE, IOWA, MARQUETTE, RICHLAND AND SAUK COUNTIES
Rates Fringes
PLUMBER..........................$ 34.78 12.76
PLUM0118-002 06/01/2009
KENOSHA, RACINE, AND WALWORTH COUNTIES
Rates Fringes
Plumber and Steamfitter..........$ 35.26 16.44
PLUM0400-003 06/01/2009
ADAMS,BROWN, CALUMET, DODGE (except Watertown), DOOR, FOND DU LAC, GREEN LAKE,KEWAUNEE, MANITOWOC, MARINETTE (except Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, SHEBOYGAN, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES
PLUMBER/PIPEFITTER...............$ 31.43 14.46
PLUM0434-002 06/01/2009
BARON, BUFFALO, CHIPPEWA, CLARK, CRAWFORD, DUNN, EAU CLAIRE,
FLORENCE, FOREST, GRANT, JACKSON, JUNEAU, LA CROSSE, LANGLADE,
LINCOLN, MARATHON, MONROE, ONEIDA, PEPIN, PIERCE, POLK,
PORTAGE, PRICE, RUSK, ST. CROIX, TAYLOR, TREMPEALEAU, VERNON,
VILAS, AND WOOD COUNTIES
PIPEFITTER.......................$ 32.59 13.78
PLUM0506-007 06/01/2003
MARINETTE COUNTY (Niagara only)
PLUMBER/PIPEFITTER
(1) Jobs where plumbing bid is $50,000 or less......$ 20.56 12.05
(2) All other work..........$ 25.71 12.05
TEAM0039-002 05/01/2009
Rates Fringes
TRUCK DRIVER
1 & 2 Axle Trucks...........$ 23.84 14.70 3 or more axles; Euclids or Dumptor, Articulated Truck, Mechanic.............$ 23.99 14.70
SELF-PROPELLED HOPPER DREDGE:
Drag Tender $ 8.78 $4.23+A
FOOTNOTE:
A. Paid Holidays: New years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20), Veteran,s Day, Thanksgiving Day, and Christmas Day
WELL DRILLER $16.52 $3.70
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .12/31/2011. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 1/18/2010. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos.__________are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of provision)
52.211-5001 VARIATIONS IN ESTIMATED QUANTITIES, SUBDIVIDED ITEMS
(MAR 1995)--EFARS
This variation in estimated quantities clause is applicable only to Items Nos.__________.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Items Nos.____________ is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. ____________ exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos.__________ exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
(End of clause)
(End of Summary of Changes)