This is an amendment to a solicitation for a Multiple Award Task Order Contract to provide construction services in support of projects within the Kingdom of Saudi Arabia. The scope of work under the MATOC includes construction utilizing design-build, site-adapt-construction, design-bid-build, renovations and repairs. Key changes in this amendment include revisions to sections of the instructions to proposers and proposal evaluation process, clarification that offerors must provide proof of Saudi Arabia construction licensure with Phase I proposals or be ineligible for award, and extension of the Phase I proposal due date to January 3, 2022. The Department of the Army Corps of Engineers Engineering District Middle East is the issuing agency.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Refer to the SF30 Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER22R0019
X 9B. DATED (SEE ITEM 11)
08-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Dec-2021
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER22R0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to incorporate the following revisions:
1. Change to Table of Contents
SECTION 00 21 16 Instructions to Proposers changed from 28-38 to 19-38.
2. Proposal Evaluation Process Correction: 00 22 16 Page 29 3.1.2
3.1.2 Proposal Compliance Review and Responsibility Determination: This is an initial review to ensure that all required forms and certifications are complete, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
Changed to:
3.1.2 Proposal Compliance Review and Responsibility Determination: This is an initial review to ensure that all required forms and certifications are complete, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
NOTE: The information required for compliance review and responsibility determination, as set forth in Enclosure B, shall be required in Phase II, unless the information is requested elsewhere under Phase I evaluation factors, or under a separate Section in the Solicitation. For example, Evidence of Proof to Obtain Bonding and Proof of Financial Ability, as set forth in Section 00 21 16
7.3.1 shall be provided with Phase I proposal submissions.
3. Pre-Award/Contractor Responsibility Information Correction: 00 22 16 Page 38 7.4.1d.
d. Contractor Responsibility
Offerors are advised that the Contracting Officer will conduct a responsibility determination prior to award of a contract. Determinations of responsibility involve subjective business judgments that are within the broad discretion of the contracting agency. The Contracting Officer is vested with broad discretion in exercising the business judgment involved in a responsibility determination. The offeror will be required to respond to a Questionnaire which will be provided with the RFP. This Questionnaire is not an additional non-pricing factor; the information requested pertains to the offeror’s ability to perform the contract (if awarded) rather than the acceptability of the offer presented. Your responses to the Questionnaire will assist the Contracting Officer in making their responsibility determination.
In addition, offerors shall provide a copy of its current First Category licensure to perform construction projects in Saudi Arabia. This includes providing a copy of Grade 1 licensure, according to the Contractors’ Classification System, for the following types of work: electrical, mechanical/HVAC, civil, and communications, whether self- performed or performed by a major subcontractor.
Changed to:
d. Contractor Responsibility
W912ER22R0019
Offerors are advised that the Contracting Officer will conduct a responsibility determination prior to award of a contract. Determinations of responsibility involve subjective business judgments that are within the broad discretion of the contracting agency. The Contracting Officer is vested with broad discretion in exercising the business judgment involved in a responsibility determination. The offeror will be required to respond to a Questionnaire, Enclosure B, in Phase II. This Questionnaire is not an additional non-pricing factor; the information requested pertains to the offeror’s ability to perform the contract (if awarded) rather than the acceptability of the offer presented. Your responses to the Questionnaire will assist the Contracting Officer in making their responsibility determination.
NOTE: However, offerors should provide, in Phase I, a copy of its current Saudi Arabia construction licensure, or alternatively, demonstrate that it is in the process of securing the required licensure.
This information will not be evaluated or rated but will be used for the purpose of completing the Pre-award Survey. If not provided in Phase I, the licensure shall be required in Phase II. An offeror that fails to provide a copy of its Saudi Arabia construction licensure will be ineligible for award of a contract. This includes providing a copy of Grade 1 licensure, according to the Contractors’ Classification System, for the following types of work: electrical, mechanical/HVAC, civil, and communications, whether self- performed or performed by a major subcontractor.
4. Removal of Clause- Clause 252.223-7999- Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009)
5. Offerors who previously submitted a proposal may either resubmit a new proposal, or confirm that their proposal, as submitted, is valid. If an offeror fails to resubmit a new proposal or provide the confirmation by the due date for receipt of proposals, the Government will evaluate the proposal originally submitted by the offeror in accordance with the changes in this Amendment. New offerors may submit a proposal as well. All proposals are due by 10:00AM EST, 3 January 2022.
6. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .