This document is an amendment to a solicitation for a Multiple Award Task Order Contract (MATOC) to provide construction services in support of projects in the Kingdom of Saudi Arabia. The MATOC is part of an acquisition strategy by the U.S. Army Corps of Engineers to support Saudi Arabia's Foreign Military Sales program and U.S. forces requirements within the U.S. Central Command area of responsibility. Services include construction utilizing design-build, site-adapt construction, design-bid-build, renovations and repairs. Phase one proposals were due by October 28, 2021. The amendment provides corrections to attachments and enclosures to reflect updates to the solicitation. It also modifies bond amounts and the percentage of work to be self-performed. No other terms or conditions were changed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See SF 30 Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ER22R0019
X 9B. DATED (SEE ITEM 11)
08-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Nov-2021
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
The purpose of this amendment is to incorporate the following revisions:
1. APPENDIX A Correction: Section 00 10 00 Page 4
ATTACHMENT: 1 - Past Performance Overview Sheet changed to
ATTACHMENT: 1 Project Overview Sheet
2. APPENDIX A Correction: Section 00 10 00 Page 4
ENCLOSURE: C -CONTRACTOR RESPONSIBILITY changed to
ENCLOSURE: C -PRE-A WARD/CONTRACTOR RESPONSIBILITY
3. APPENDIX A Correction: Section 00 10 00 Page 4
ENCLOSURE: B- PERFORMANCE DISTRIBUTION STATEMENT
Removed
ENCLOSURE: C -PRE-A WARD CONTRACTOR RESPONSIBILITY
changed to ENCLOSURE: B -PRE-A WARD CONTRACTOR
RESPONSIBILITY
ATTACHMENT: 5 - BID SURETY FORM - Removed
ATTACHMENT: 6 - PERFORMANCE SURETY FORM - Removed
ATTACHMENT: 7- PAYMENT SURETY FORM-Removed
ATTACHMENT: 8 - ANTI-COLLUSION CERTIFICATION changed to
ATTACHMENT: 5 - ANTI-CO22LLUSION CERTIFICATION
4. Attachment Title Correction: Section 00 21 00 Page 14 1.10.5
Change (Attachment 6) to (Enclosure A)
5. Volume II for Phase I Correction Section 00 21 16 Page 28 2.1.4
Change Volume II-Tab D: Pre-Award Information to Volume II-Tab D: Pre
Award/Contractor Responsibility Information
6. Volume II-Pro Forma Information Correction: Section 00 21 16 Page 30
Change Tab D Pre-Award Information to Tab D Pre-Award/ Contractor
Responsibility Information
W912ER22R0019
7. Element 2: Designer of Record (DOR) Correction: 00 22 16 Page 33 5.1.9
5.1.9 Element 2: Designer of Record (DOR)
Provide descriptions of a minimum of three (3) and a maximum of five (5) projects that have been completed within the last six ( 6) years of the solicitation issuance date, or currently under construction and at least 75% complete as of the solicitation issuance date, that are similar in size and scope as defmed in paragraphs 5 .1.3 and 5 .1.4 above, on which the proposed A/E firm was the DOR. Projects completed more than 6 years before the solicitation issuance date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Only one (1) DOR shall be submitted for past performance. The proposed A/E firm shall be used to the greatest extent possible for the MA TOC awarded under this solicitation. Deviations may be permitted with prior approval from the Contracting Officer. Any changes of the DOR must meet or exceed the same minimum qualifications standards as stated in the specification document SPEC DIV 1 section 1.2.
8. Tab C - Evidence of Ability to Obtain Bonding and Proof of Financial Ability
Submission Requirements Correction- Section 00 21 16 Page 37 7.3.1
7.3 Tab C - Evidence of Ability to Obtain Bonding and Proof of Financial Ability
7.3 .1 Submission Requirements:
a. Financial Capability. Submit Proof of Financial Ability (Most recent fmancial statement covering assets and liabilities). Include the name, address and telephone number of firm's banking institution.
b. Bonding Capability. Submit information showing offeror's ability to be bonded for projects up to $1 OM. Include the name, address and telephone number of the firm's bonding company. Bonding information shall include the offerors current single and aggregate performance and payment bond limits.
Bank Letter of Guarantees will not be accepted.
7.3 .2 Evaluation Criteria: This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
Changed to:
7.3 Tab C - Evidence of Ability to Obtain Bonding and Proof of Financial
Ability
7.3 .1 Submission Requirements:
W912ER22R0019
a. Financial Capability. Submit Proof of Financial Ability (Most recent fmancial statement covering assets and liabilities). Include the name, address and telephone number of firm's bankig institution.
b. Bonding Capability. Submit proof of offeror's ability to obtain acceptable surety in the form of performance and payment bonds, Irrevocable Letters of Credit, or other surety as described in FAR Part 28. The surety bond provider or bank shall attest to the offeror' s ability to obtain bonding or a satisfactory Irrevocable Letter of Credit (ILC) for not less than $3.5 million coverage for each year of the seven-year MATOC performance period, which includes all option years. The contractor will be required to provide a bond or ILC in the amount of20% of the task order amount for each awarded task order. Acceptable proof of the offeror's ability to obtain acceptable surety includes the following:
(a) a letter of commitment from a surety contained on the Department of Treasury Circular 570 list if performance and payment bonds will be provided;
(b) a letter of commitment from a Federally Insured Financial Institution if an Irrevocable Letter of Credit (ILC) is contemplated;
( c) a statement providing evidence of adequate fmancial assets in the name of the offeror and a signed statement from an person with authority to bind the offeror that those assets will be available to meet the security requirements for performance and payment bonds awarded to the offeror if a certified check will be provided. Include the name, address and telephone number of the firm's bonding company. Bonding information shall include the offeror's current single and aggregate performance and payment bond limits.
NOTE: Bank Letter of Guarantees will not be accepted.
7.3 .2 Evaluation Criteria: This information will be used for the purpose of completing the Pre-Award Survey. This requirement is not listed as an evaluation factor and will not be rated. However, an offeror that fails to demonstrate satisfactory fmancial capability to perform the solicitation requirements and provide acceptable proof of their ability to obtain the required surety, will not be eligible to advance to Phase II of the competition.
9. Tab D- Pre- Award Information Correction: Section 00 21 16 Page 37 7.4
Change Tab D Pre-Award Information to Tab D Pre-Award/Contractor
Responsibility Information
10. Contractor Responsibility Correction: Section 00 21 16 Page 3 7 7 .4.1
W912ER22R0019
Narrative Addition:
( d) Contractor Responsibility
Offerors are advised that the Contracting Officer will conduct a responsibility determination prior to award of a contract. Determinations of responsibility involve subjective business judgments that are within the broad discretion of the contracting agency. The Contracting Officer is vested with broad discretion in exercising the business judgment involved in a responsibility determination.
The offeror will be required to respond to a Questionnaire which will be provided with the RFP. This Questionnaire is not an additional non-pricing factor; the information requested pertains to the offeror's ability to perform the contract (if awarded) rather than the acceptability of the offer presented. Your responses to the Questionnaire will assist the Contracting Officer in making their responsibility determination.
In addition, offerors shall provide a copy of its current First Category licensure to perform construction projects in Saudi Arabia. This includes providing a copy of Grade 1 licensure, according to the Contractors' Classification System, for the following types of work: electrical, mechanical/HY AC, civil, and communications, whether self- performed or performed by a major subcontractor.
11. Contractor Responsibility Correction: Section 00 22 16 Page 44 11.0, 11.1, and 11.2
Contractor Responsibility moved to Page 37 7.4.1 Submission Requirements (d)
12. Table of Contents Correction: Section 00 01 10
Section 00 21 16 changed to Pages 28-38
Section 00 22 16 changed to Pages 39-45
Section 00 45 00 changed to Pages 46-62
Section 00 70 00 changed to Pages 63-127
Section 00 73 00 changed to Pages 128-139
13. Clause Correction 52.228-15: Section 00 73 00 Page 137 (b) (1) and (2)
W912ER22R0019
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award of the Seed Task Order shall be 20 percent of the contract price or $2,000,000.00 U. S. Dollars, whichever is less.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award of the Seed Task Order shall be 20 percent of the original contract price or $2,000,000.00 U. S. Dollars, whichever is less.
Changed to:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award of the Seed Task Order shall be 20 percent of the contract price or $3,500,000.00 U. S. Dollars, whichever is less.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award of the Seed Task Order shall be 20 percent of the original contract price or $3,500,000.00 U. S. Dollars, whichever is less.
14. Clause Correction 52.236-1: Section 00 70 00 Page 93
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) The
Contractor shall perform on the site, and with its own organization, work equivalent to at least Thirty-Five Percent (35) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the
Contracting Officer determines that the reduction would be to the advantage of the
Government.
Changed to:
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) The
Contractor shall perform on the site, and with its own organization, work equivalent to at least Twenty Percent (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting
Officer determines that the reduction would be to the advantage of the Government.
15. All attachments and enclosures have been updated to reflect the solicitation.
Attachments and Enclosures will be footnoted with "Revision 1 - 27 Oct 2021"