W912EQ22B0006 Amendment 0003.pdf

PDF 231 KB Posted

Attached to
Rainbow Temporary Housing, Saint John The Baptist Parish, Louisiana
Solicitation number
W912EQ22B0006
Issued by

About this file

This document contains an amendment to a federal solicitation for construction services. The solicitation is to construct a temporary community housing site in Saint John The Baptist Parish, Louisiana consisting of 97 housing site pads, gravel roads, parking pads, drainage, utilities and other site amenities. The contractor will be responsible for coordinating electrical power installation with the local utility according to their standards, including a single primary metering point and infrastructure from the meter to each housing unit. Housing units will be installed by others. The response due date is not provided. The magnitude of construction is estimated between $10 million to $15 million. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Memphis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ22B0006

X 9B. DATED (SEE ITEM 11)

01-Apr-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Apr-2022

CODE

DEPARTMENT OF THE ARMY

CORPS OF ENGINEERS, MEMPHIS DISTRICT

167 N. MAIN ST., B-202

MEMPHIS TN 38103-1894

7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

xx

W912EQ22B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

QUESTION AND ANSWER

The electrical plans and specs that were developed require all power company interaction including detailed engineering requirements for primary work to be done by the site Contractor, not by USACE. FEMA required these sites to have a single metering location and, technically all infrastructure beyond that metering point is to be completed by the contractor under local and power company standards.

1) Need the secondary size to trailers? As shown on Details sheet 6, the secondary to each MHU is aluminum 3#4/0 and #4 GND in 2" PVC conduit.

2) Need the primary size of the cables? Primary size depends on the availability of transformers and grouping to be determined by the Contractor. Per electrical plan sheet 3E, the desired layouts consist of 1-2 housing units are fed from a 30KVA xfmr, 3-4 housing units are fed from a 75KVA xfmr, and 6-8 units are fed from a 112.4 KVA xfmr. This is based on the NEC's Article 550 basing an MHU's design load as 16KVA. Note, each MHU is protected by a 200A breakered disconnect.

3) Need to have a complete engineered primary and secondary one line as to where cut out is wanted ( fuse protection etc.) An example layout is shown on contract drawing 3E. Secondary wiring sizes are shown on detail page 6 and mentioned in the answer to question 1) above. Primary wiring is based on transformer availability and final layout.

4) Need the proper size of pole mounted transformers with voltage and KVA sizes (Note: pole mounted transformers are sized different than dry type) This is what the contract requires the Contractor to determine. A rule of thumb is mentioned in the answer to question 2 above.

5 ) Need to know if they will accept used transformers (there is difficulty in obtaining them) USACE is in agreement with this as long as the transformers are tested for continuity and the Government is not charged for replacement if they prematurely fail before these temporary housing sites are deactivated.

6) Need more time to price, and we need the above answered before we can price? Power company is working on this price for the Contractor and not for the Federal Government because it is the Corps understanding the Contractor has to coordinate, pay for, arrange all power company work.

7) Entergy has supplied form titled Customer Load Data Sheet, Entergy needs this filled out by the Engineer on Record for Design before they can fully price. Regarding the Entergy form, each MHU is assumed to have a demand factor of 16KW, 200A, 120/240V single phase. Please note the site has a single primary meter for the entire site and it is up to the contractor to coordinate all electrical infrastructure including the meter and to each MHU pad. Although the Contractor has to use Entergy for work up to the meter, it is the Contractor can use any approved electrical (sub)contractor to install infrastructure from the metering point to each MHU pad. If the Contractor wants to use Entergy for this task, they are more than welcomed to.

W912EQ22B0006

(End of Summary of Changes)

Please make sure that all amendment are acknowledge.

NOTE: This inquiry is NOT an application for service. It is a request for information only.

To Apply For Service: Call 1-800-368-3749

ELECTRIC SERVICE INQUIRY

RETURN TO: ENTERGY

CUSTOMER INFORMATION:

Name Address .

P.O. Box Street City State ZIP Contact Voice Phone ( ) FAX ( ) SERVICE LOCATION: (Attach applicable maps or prints such as site, utility plan, etc.)

Lot or Tract Street City State ZIP SERVICE DETAILS: (check one response for items 1 through 3):

1. New customer or Increased load w/Acct# or Existing Building Turn-On

2. Requesting: Overhead Service Underground Service

3. Has point of service (metering location) been approved by ENTERGY? Yes No REQUESTED IN-SERVICE DATES: temporary permanent

PROPOSED BUILDING CLASSIFICATION:

SIC Code (or, check one of the following):

residential office restaurant/bar retail grocery warehouse school university hospital hotel/motel mobile home nursing home misc. non-manufacturing building misc. non-manufacturing (no building) misc. manufacturing

LOAD SUMMARY:

Phase/Voltage: 1 -120/240 3 -120/240 3 -120/208 3 -277/480 ** Other

Single Three Comments Square Footage SQ/FT. ____________________________________ ___________ Lights KW KW ____________________________________ ___________ Cooking KW KW Heating KW KW

Note: If more than one A/C unit please list the total load in the appropriate column and largest unit in the comment section.

A/C (heat pump) KW KW Refrigeration KW KW Water Heating KW KW Motors HP HP Motors HP HP Receptacles KW KW Miscellaneous KW KW Total Connected KW KW Existing Peak Load KW KW Total Diversified KW KW

Largest Motor: HP~ 1 3 Motor HP Code No.

Locked Rotor Current: Amps. Motor Duty: hrs./day~ continuous intermittent

All-electric facility? yes no Computer equipment? yes no Number & Size of Wires in Risers or Wires in Switchgear Being Run by Electrician: No.: Size:

Submitted by: Title:

Date: Phone No.: Alt. No.: Rev.4/14/14

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Text Box SINGLE PRIMARY METERING POINT TO GROUP HOUSING SITE (MULTIPLE MOBILE HOMES). PRIMARY SHALL BE AERIAL TO EACH HOME DISCONNECT, THEN UNDERGROUND TO STUB-UP POINT. FED GOV'T CONTRACTOR RESPONSIBLE FOR COORDINATION, PAYMENT, INSTALLATION BY ENTERGY AND ELEC SUB-CONTRACTOR.

H1ECXDB9

Text Box

TEMPORARY SERVICE AS COORDINATED BY FED GOV'T CONTRACTOR

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Line

H1ECXDB9

Text Box

DESIGN ASSUMPTION IS 16KVA FOR EACH MOBILE HOME UNIT.

THE 'RAINBOW' SITE HAS 99 MHUS AND (ASSUMING) ONE OFFICE TRAILER DURING CONSTRUCTION.