Rainbow Bid Schedule_LRH_Revised_2022.04.06.pdf
PDF 144 KB Posted
- Solicitation number
- W912EQ22B0006
About this file
This bid schedule and related federal contract opportunity outline requirements for constructing a temporary housing site in Saint John The Baptist Parish, Louisiana. Work will include developing 97 housing site pads with gravel roads, home site pads, parking pads, and positive storm water drainage. Potable water and sewer lines, an on-site waste water treatment plant, electric power service, site lighting, fencing, and other site amenities must also be provided. Estimated value is between $10-$15 million. The solicitation was issued by the U.S. Army Corps of Engineers Memphis District on behalf of FEMA. Responses are due by the date specified in the solicitation. The temporary housing community will provide sites for recreational vehicles to house residents displaced by a disaster, though the vehicles themselves will be supplied under a separate contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D
Item # Item Quantity Unit of Measure
WATER SERVICE
1 Fire Hydrant, Dry Barrel 36" Bury Depth 4 LF
2 3/4" Water Service Pipe 3,038 LF
3 3/4" Water Service Taps 99 EA
4 3/4" Water Service Shut Off Valves 99 EA
5 Water Service Coordination & Fees- Main to Meter Install by Utility 1 LS
6 4" Water Main Pipe 1,848 LF
7 4" Gate Valve w/ Cast Iron Box 2 EA
8 6" Water Main Pipe 3,358 LF
9 6" Gate Valve w/ Cast Iron Box 8 EA
10 6" Double Check Valve Backflow Preventer Assembly 1 EA
SEWER SERVICE
11 8" Gravity Sewer Pipe 4,535 LF
12 4" Gravity Sewer Service Pipe 2,745 LF
13 Cleanout (Service and Main Line) 102 EA
14 Main Line Service Tee/Wye 99 EA
15 Manhole (Typical) 12 EA
16 Connect to Existing Gravity Main 1 LS
17 Connect to Existing Manhole 1 LS
ELECTRICAL SERVICE
18 Connect to Electric Utility (All Costs Upstream of Metering Structure) 1 LS
19 30 KVA Pole Mounted Transformer 12 EA
20 75 KVA Pole Mounted Transformer 7 EA
21 112.5 KVA Pole Mounted Transformer 8 EA
22 Primary Power Pole 35 EA
23 Primary Overhead Circuit 4,842 LF
24 Primary Metering Structure 1 LS
25 Secondary Overhead Circuit 3,950 LF
26 Below Grade Secondary Circuit (Conduit & Conductors) 2,971 LF
A B C D
27 Secondary Power Pole 60 EA
28 Site Lighting - Lamp Assembly 21 EA
29 MHU Service / Power Disconnect 99 EA
MISC. SITE SERVICE
30 Fencing - 6' with Privacy Screen 2,308 LF
31 Fencing - 8' with Privacy Screen 1,121 LF
32 Fencing Gates (Various Sizes) 1 EA
33 Post Mounted Street Sign 8 EA
34 Flexible Dileneator Posts 1 LS
35 Pet Waste Station 1 EA
36 Bus Stop (Not Including Concrete) 1 EA
37 Mail Box Assembly (Not Including Concrete) 1 EA
38 Dumpster Pad (Not Including Concrete) 1 EA
39 DOTD Driveway Apron (Inc. Concrete) 2 EA
40 Concrete - UFAS Pads, Misc. 58,370 SF
41 Aggregate - MHU Pads, UFAS Pads, Roads, Streets, Misc. 259,021 SF
42 Aggregate - Roads / Streets 111,674 SF
GENERAL
43 Overhead, Incidentals, and Other Costs Not Otherwise Specified 1 LS
44 Mobilization 1 LS
45 Demobilization 1 LS
46 Bonding 1 LS
File details come from the government source that posted it. Updated .