This solicitation is for a shore protection project to renourish Fort Pierce Beach in St. Lucie County, Florida. Services required include beach fill placement, screening, tilling, remediation of noncompliant material, transportation and disposal of unacceptable material, sea turtle trawling, standby time, partnering meetings, and on-site munitions and explosives of concern support. The pre-bid conference will be held via teleconference on November 18, 2022, with bids due by December 2, 2022. The award is a firm-fixed price contract to be administered by the Department of the Army Corps of Engineers Engineering District Jacksonville.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SHORE PROTECTION PROJECT FORT PIERCE BEACH RENOURISHMENT 2023 ST. LUCIE COUNTY, FLORIDA

See SF30 Continuation Sheet for Amendment Details All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP23B0003

X 9B. DATED (SEE ITEM 11)

08-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Nov-2022

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EP23B0003 Amendment 0001

SF 30 CONTINUATION SHEET

SHORE PROTECTION PROJECT

FORT PIERCE BEACH RENOURISHMENT 2023

ST. LUCIE COUNTY, FLORIDA

Amendment 0001

SUMMARY OF CHANGES

1. SPECIFICATIONS:

A. In some Volume 1 sections, asterisks appear before and after the line or lines where amendments have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.

B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.

The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

Changes to Specifications:

Volume 1 of 2 – Technical Specifications:

N/A

Volume 2 of 2 – Technical Specifications:

DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.

DELETE Section 01 35 30 and REPLACE with the attached revised Section 01 35 30.

2. DRAWINGS:

N/A

3. ADDITIONAL INFORMATION:

Capron Shoal Borrow Area Survey Data – Survey # 21-167

(End of Summary of Changes)

Shore Protection Project Fort Pierce Beach Renourishment 2023

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

08/21

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Reference

1.2 RESIDENT MANAGEMENT SYSTEM (RMS)

1.2.1 Definition

1.2.2 Instructions

1.3 SUBMITTALS

1.4 JOB PAYMENT ITEMS

1.4.1 Mobilization and Demobilization (Line Item 0001)

1.4.2 Vibration Control and Monitoring (Line Item 0007 and 0020)

1.4.3 Environmental Species Monitoring (Line Item 0008 and 0021)

1.4.4 Turbidity Monitoring (Line Item 0009 and 0022)

1.4.5 Mobilization and Demobilization for Sea Turtle Trawl Sweeping

(Hopper Dredge Only, Line Item 0010)

1.4.6 Mobilization and Demobilization for Remote Munitions and

Explosives of Concern (MEC) Support (Line Item 0014)

1.5 UNIT PRICE PAYMENT ITEMS

1.5.1 Beach Fill (Line Item 0002 and 0016)

1.5.1.1 Payment

1.5.1.2 Measurement

1.5.1.3 Unit of Measure

1.5.2 Screening (Line Item 0003 and 0017)

1.5.2.1 Payment

1.5.2.2 Measurement

1.5.2.3 Unit of Measure

1.5.3 Beach Tilling (Line Item 0004 and 0018)

1.5.3.1 Payment

1.5.3.2 Measurement

1.5.3.3 Unit of Measure

1.5.4 Remediation of Noncompliant Material (Line Item 0005)

1.5.4.1 Payment

1.5.4.2 Measurement

1.5.4.3 Unit of Measure

1.5.5 Transportation & Disposal of Unacceptable Material (Line Item

0006 and 0019)

1.5.5.1 Payment

1.5.5.2 Measurement

1.5.5.3 Unit of Measure

1.5.6 Sea Turtle Trawl Sweeping (Hopper Dredge Only) (Line Item 0011)

1.5.6.1 Payment

1.5.6.2 Measurement

1.5.6.3 Unit of Measure

1.5.7 Standby Time (Line Item 0012)

1.5.7.1 Payment

1.5.7.2 Measurement

SECTION 01 22 00 Page 1

1.5.7.3 Unit of Measure

1.5.8 Partnering Regroup (Line Item 0013)

1.5.8.1 Payment

1.5.8.2 Measurement

1.5.8.3 Unit of Measure

1.5.9 On-Site MEC Support (Line Item 0015)

1.5.9.1 Payment

1.5.9.2 Measurement

1.5.9.3 Unit of Measure

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

3.1.1 Requesting Progress Payment

3.1.2 Options and Modification CLINS

-- End of Section Table of Contents --

SECTION 01 22 00 Page 2

SECTION 01 22 00

MEASUREMENT AND PAYMENT

08/21

PART 1 GENERAL

1.1 SUMMARY

This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.

Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.

1.1.1 Reference

The publication listed below forms a part of this specification to the extent referenced. This publication is referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1003 (2013) Hydrographic Surveying

1.2 RESIDENT MANAGEMENT SYSTEM (RMS)

1.2.1 Definition

The terms Contract Line Item Number (CLIN) and Line Item are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term CLIN is a contracting term used in the Resident Management System (RMS) payment data base.

1.2.2 Instructions

See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE

(RMS CM).

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar

SECTION 01 22 00 Page 3 days after Notice to Proceed:

SD-01 Preconstruction Submittals

Schedule of Values ; G, RO

SD-07 Certificates

Request for Progress Payment ; G, RO

1.4 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit JOB and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, will be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

Progress payments for job CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit Schedule of Values for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). Include a list of pay activities to breakdown bid for each job CLIN as part of the RMS Schedule. Schedule of Values will become basis for CLIN and Pay Activity data in the RMS payment data base. An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, take into account the amount reserved for contract payments when preparing the construction schedule.

1.4.1 Mobilization and Demobilization (Line Item 0001)

Payment will be made for costs associated with and incidental to mobilization and demobilization and establishment of initial project management and coordination. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.

1.4.2 Vibration Control and Monitoring (Line Item 0007 and 0020)

Payment will be made for costs associated with and incidental to the protection of existing structures from construction activities and monitoring of same. See Section 02 22 13 VIBRATION MONITORING

REQUIREMENTS FOR EXISTING STRUCTURES.

1.4.3 Environmental Species Monitoring (Line Item 0008 and 0021)

Payment will be made for costs associated with and incidental to endangered species monitoring. See Section 01 57 20 ENVIRONMENTAL

PROTECTION.

SECTION 01 22 00 Page 4

1.4.4 Turbidity Monitoring (Line Item 0009 and 0022)

Payment will be made for costs associated with and incidental to obtaining, analyzing, and reporting the results of monitoring for turbidity. See Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING.

1.4.5 Mobilization and Demobilization for Sea Turtle Trawl Sweeping (Hopper Dredge Only, Line Item 0010)

Payment will be made for costs associated with and incidental to mobilization and demobilization for sea turtle trawling and relocation (Hopper Dredge Only). See Section 01 57 20 ENVIRONMENTAL PROTECTION.

1.4.6 Mobilization and Demobilization for Remote Munitions and Explosives of Concern (MEC) Support (Line Item 0014)

Payment will be made for costs associated with or incidental to mobilization, demobilization, training, work plans, reporting, safety and standby for MEC support. Unexploded Ordinance (UXO) technician Technicians will provide consultation and support via remote location. See Section

01 35 30 MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT.

1.5 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. The unit price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

Each Unit Price CLIN may be a single pay activity item or may be broken down into pay activities with smaller quantities equal to CLIN total.

Contract unit price multiplied by agreed quantity is full compensation.

1.5.1 Beach Fill (Line Item 0002 and 0016)

1.5.1.1 Payment

a. Payment will be made for costs associated with and incidental to barricades and signs, debris removal, pipeline crossing, excavation and transportation of beach fill, constructing the beach profile and final dressing; noise control; dive reports; and condition surveys and monitoring of hardbottom/reef communities. See Sections 01 57 20

ENVIRONMENTAL PROTECTION, 01 57 25 TURBIDITY AND DISPOSAL MONITORING,

and 35 20 25 BEACH FILL.

b. In addition to the above, payment will be made for in-place beach fill to the required tolerance line on both berm and slope. Payment quantities will be determined by the Government using average end area method of calculation. When beach fill is placed up-slope above slough zone to compensate for wave action, payment will be based on a cut and fill calculation. No payment will be made for material placed in excess of the tolerance template A(T) indicated on the drawings, less any voids that may be present in the tolerance template landward of the seaward edge of sloping berm.

SECTION 01 22 00 Page 5

1.5.1.2 Measurement

a. The maps and/or drawings already prepared (clause CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS of Section 00700 CONTRACT CLAUSES in Volume

1) are believed to represent accurately the existing conditions at the time the surveys were performed, but the depths and elevations shown thereon may be verified and corrected by elevations and soundings taken before commencing the work. Once quantities within a specified reach or section have been determined through the use of in-place measurement, they will not be reopened except on evidence of collusion, fraud, or obvious error.

b. Beach fill satisfactorily placed will be measured for payment by use of the average end area method. The quantities will be computed by the Government in accordance with clause QUANTITY SURVEYS of Section 00700 CONTRACT CLAUSES in Volume 1. Measurement of quantity placed for pay purposes will be based on original and final cross sections made on the section or reach indicated on the drawings. The Contractor will give 3 calendar days advance notice, in writing, to the Contracting Officer of the need to perform the original and final surveys. Quality Control Surveys will be the responsibility of the Contractor. Monthly partial payments will be based on approximate quantities determined by measurement of the in-place beach fill and in accordance with clause QUANTITY SURVEYS of Section 00700 CONTRACT CLAUSES in Volume 1.

c. In accordance with clause QUANTITY SURVEYS of Section 00700 CONTRACT CLAUSES in Volume 1, Contracting Officer will perform pre- and post-construction topographic survey at 100-foot stations with elevations taken at 10-foot range intervals from the baseline to the toe slope elevation. In order to achieve final grade in slough zone, Contractor will place material to final grade within tolerance for entire slope or may stockpile beach fill up-slope of slough zone.

After stockpiled beach fill is measured for payment, Contractor will shape slope to within 0.5 foot of final grade from top of slope to waterline producing a smooth uniform slope. Once post-construction survey is performed, no measurements will be revised except on suspicion of fraud or obvious error.

1.5.1.3 Unit of Measure

Cubic yard.

1.5.2 Screening (Line Item 0003 and 0017)

1.5.2.1 Payment

Payment will be made for costs associated with or incidental to separation of any material greater than 3/4 inch in diameter by a method detailed in Section 35 20 25 BEACH FILL.

1.5.2.2 Measurement

Separation of material greater than 3/4 inch in diameter will be measured for payment by the Beach fill quantity satisfactorily placed. The estimated volume in Section 00010A LINE ITEMS AND PRICING SCHEDULE is provided for bidding purposes only and will be determined on actual quantity screened.

SECTION 01 22 00 Page 6

1.5.2.3 Unit of Measure

Cubic yard.

1.5.3 Beach Tilling (Line Item 0004 and 0018)

1.5.3.1 Payment

Payment will be made for costs associated with or incidental to beach tilling.

1.5.3.2 Measurement

Beach tilling will be measured for payment by the actual area tilled to the tenth of an acre.

1.5.3.3 Unit of Measure

Acre.

1.5.4 Remediation of Noncompliant Material (Line Item 0005)

1.5.4.1 Payment

Payment will be made for costs associated with and incidental to remediation of noncompliant material found on the beach fill template and determined by the Contracting Officer to have originated from within the borrow area only. Remediation procedures for noncompliant material are indicated in paragraph QUALITY CONTROL FOR BEACH FILL of Section 35 20 25

BEACH FILL.

No payment will be made for remediation of noncompliant material resulting from overexcavation or excavation outside the limits of the borrow area.

Remediation to remove material greater than 3/4 inch is at the Contractor's expense and this line item not implemented. If performance of this line item is not required or implemented per the NOTES in Section 00010A LINE ITEMS AND PRICING SCHEDULE, no payment will be made to the Contractor for this line item.

1.5.4.2 Measurement

Remediation will be measured for payment by the acre of noncompliant material blended with adjacent material or dispersed among the fill template to the tenth (0.1) of an acre. The quantity listed in Section 00010A LINE ITEMS AND PRICING SCHEDULE is provided for bidding purposes only.

1.5.4.3 Unit of Measure

Acre.

1.5.5 Transportation & Disposal of Unacceptable Material (Line Item 0006 and 0019)

1.5.5.1 Payment

Payment will be made for costs associated with or incidental to transportation and disposal of unacceptable material after the unacceptable material has been determined by the Contracting Officer to

SECTION 01 22 00 Page 7 have originated in the borrow area. See Section 35 20 25 BEACH FILL. If performance of this line item is not required or implemented per the NOTES in Section 00010A LINE ITEMS AND PRICING SCHEDULE, no payment will be made to the Contractor for this line item.

1.5.5.2 Measurement

Transportation and disposal of unacceptable material will be measured for payment by the quantity disposed. Partially filled dumpsters/truck/bins will be measured to the one cubic yard. The quantity listed in Section 00010A LINE ITEMS AND PRICING SCHEDULE is provided for bidding purposes only.

1.5.5.3 Unit of Measure

Cubic yard.

1.5.6 Sea Turtle Trawl Sweeping (Hopper Dredge Only) (Line Item 0011)

1.5.6.1 Payment

Payment will be made for costs associated with and incidental to the Sea Turtle Trawl Sweeping. This price includes all costs for furnishing labor, equipment, fuel, oil, materials, and supplies required for trawl sweeping to clear and/or relocate sea turtles from in the vicinity of the dredge, and the cost of reporting as specified. See Section 01 57 20

ENVIRONMENTAL PROTECTION.

1.5.6.2 Measurement

Sea Turtle Trawl Sweeping will be measured for payment based upon the duration of performance on a daily basis. A day of trawl sweeping is defined as 24 hours of continuous trawling. Conduct trawl sweeping as described in Section 01 57 20 ENVIRONMENTAL PROTECTION.

1.5.6.3 Unit of Measure

Day.

1.5.7 Standby Time (Line Item 0012)

1.5.7.1 Payment

Payment will be made for costs associated with or incidental to standby of dredge plant only upon implementation of this line item. Standby time is defined as when, at the direction of the Contracting Officer, the dredge is put out of operation for reasons outside the requirements in the contract.

1.5.7.2 Measurement

Standby time, when exercised by the Contracting Officer, will be measured for payment by each hour, or part thereof, that the plant is not in operation.

1.5.7.3 Unit of Measure

Hour.

SECTION 01 22 00 Page 8

1.5.8 Partnering Regroup (Line Item 0013)

1.5.8.1 Payment

Payment will be made for costs associated with and incidental to conducting a partnering regroup. See Section 01 30 00 ADMINISTRATIVE PROCEDURES. The initial partnering meeting will not be paid for under this line item as it is a distributed cost mandatory administrative action.

1.5.8.2 Measurement

The basis for payment will be for the completion of each partnering regroup meeting and Government receipt of all completed work products.

1.5.8.3 Unit of Measure

Each.

1.5.9 On-Site MEC Support (Line Item 0015)

1.5.9.1 Payment

Payment will be made for costs associated with or incidental to providing on-site MEC support in the event that suspected MEC are found or as directed by Contracting Officer. See Section 01 35 30 MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT. If performance of this line item is not required or implemented per the NOTES in Section 00010A LINE ITEMS AND PRICING SCHEDULE, no payment will be made to the Contractor for this line item.

1.5.9.2 Measurement

MEC support will be measured for payment based upon the duration of performance on a daily basis. A day of MEC support is defined as any calendar day or portion thereof during dredging operations that the UXO Technician Technicians are is required to work on-site.

1.5.9.3 Unit of Measure

Day.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

Upon receiving initial Resident Management System import file, go to PAY ACTIVITIES and establish a link between bid breakdown schedule of values of PAY ACTIVITIES to contract CLINs using SCHEDULE ACTIVITIES data entry page.

3.1.1 Requesting Progress Payment

For progress payments, ensure ACTIVITY SCHEDULE, FEATURE SCHEDULE, submittal register, and punchlists are all up to date. Use PROGRESS PAYMENTS to REQUEST ACTIVITY for both ACTIVITY EARNINGS data entry page and OTHER EARNING. Provide hard copies of supporting invoices and quantity measurements to support all requested earnings. Ensure that sums

SECTION 01 22 00 Page 9 of payment activities do not exceed contract award CLIN funding amounts, or unbalanced CLINs error will prevent processing the payment. Submit a request for progress payment monthly in accordance with Clause 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES. In addition to the items listed in Clause 52.232-5(b)(1), submit the following in the request for progress payment:

a. Approved construction schedule.

b. Up-to-date payroll records.

c. Current submittal register.

d. Approved submittals on installed property.

e. QA/QC deficiency tracking list.

f. Environmental reports.

g. Progress photographs.

h. Working/current as-built drawings: progress map and cross sections showing completion of acceptance sections to be paid. Include certified field notes, computations, and other records relating to quantity or as-built surveys.

Once the complete pay application package is received to include the Contractor's signed ENG 93, the 14 calendar days will commence.

3.1.2 Options and Modification CLINS

When additional work is added by modification, existing CLINs funding amounts must be updated, or new CLINs for modification will be created.

If contract has option CLINs not yet awarded, option CLINs will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested for Options or Modification CLINs until contract modification has been funded and signed.

-- End of Section --

SECTION 01 22 00 Page 10

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 35 30

MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT

10/18

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 SUBMITTALS

1.4 MEC SAFETY AND WORK PLAN

1.4.1 MEC Safety and Work Plan Requirements

1.5 MEC IN PROJECT AREAS

1.6 UXO TECHNICIANS

1.6.1 Qualifications

1.6.2 Preparatory Phase Meeting

1.6.3 MEC Safety and Work Plan Review

1.6.4 Training

1.6.4.1 MEC Recognition and Safety Training

1.6.4.2 Dredge Operational Training

1.7 QUALITY CONTROL

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 SCREENING DEVICES

3.1.1 Inspection of Oversized Material

3.2 VISUAL INSPECTION OF PIPELINE DISCHARGE END

3.3 DISCOVERY OF MEC

3.3.1 Contractor Support

3.4 FAILURE OF BEACH SCREENING EQUIPMENT OR PROCEDURES

3.5 DETECTION AND REMOVAL OF OVERSIZED MATERIAL

-- End of Section Table of Contents --

SECTION 01 35 30 Page 1

SECTION 01 35 30

MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) CONSTRUCTION SUPPORT

10/18

PART 1 GENERAL

1.1 SCOPE

The work required under this section involves safety support and avoidance of potential unexploded ordnance and exploded ordnance, inert ordnance, and ordnance fragments and similar explosives debris material (defined and identified in these specifications as "Munitions and Explosives of Concern" (MEC), within the project area during construction. The work required under this section follows a Low-Probability assessment for the project fill site and borrow area. It involves on-call/standby unexploded ordinance (UXO) safety support for the identification of potential MEC, Material Possibly Presenting and Explosive Hazard (MPPEH), and Munition Debris (MD) within the project area. All work performed under this project work scope is to comply with all applicable government regulations.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY (DA)

DA PAM 385-64 (2011) Ammunition and Explosives Safety Standards

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 200-1-15 (2015) Technical Guidance for Military Munitions Response Actions

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EM 385-1-97 (2013) Explosives -- Safety and Health Requirements Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

Technical Paper 18 DDESB TP-18 (Revision 1, 2020) Department of Defense Explosives Safety Board (DDESB) Technical Paper (TP)-18 , Minimum Qualifications for Personnel Conducting Munitions and Explosives of Concern-Related Activities (attached after the end of this section)

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

SECTION 01 35 30 Page 2 used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

MEC Safety and Work Plan ; G, DO

1.4 MEC SAFETY AND WORK PLAN

Submit a MEC Safety and Work Plan for MEC safety support and avoidance. to include Accident Prevention Plan (APP) and Site Safety and Health Plan (SSHP) as referenced in accordance with EM 385-1-97 (including Errata sheets), EM 200-1-15 , and EM 385-1-1 . The MEC Safety and Work Plan will consist of the items as specified herein . Include , including MEC personnel qualifications.

1.4.1 MEC Safety and Work Plan Requirements

MEC Safety and Work Plan must follow EM 385-1-1 , EM 385-1-97 , EM 200-1-15 , and all other applicable regulations. Additionally, coordinate the plan with the Activity/Job Hazard Analysis and the project Accident Prevention Plan in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS to ensure worker safety and safety of the public is addressed at all times during the contract. Include the following in the MEC Safety and Work Plan:

a. Shop drawings and detailed descriptions of the required screening devices at the discharge end of the pipeline. Also include the materials, equipment, procedures and personnel to be used in the construction, operations and oversight of such devices.

b. Personnel, equipment, and procedures to be used to perform visual inspections at the discharge end of the pipeline on the beach.

c. The corrective actions to be followed if oversized material is discovered in the screening devices.

d. The corrective actions to be followed if oversized material is identified as deposited on the beach.

e. The corrective actions to be followed if MEC is discovered in the screening devices.

f. The corrective actions to follow if MEC is identified as deposited on the beach.

1.5 MEC IN PROJECT AREAS

The project placement and borrow areas are within or in the vicinity of the former Fort Pierce Naval Amphibious Training Base. The Fort Pierce Naval Amphibious Training Base is a FUDS that was used for training during World War II. Munitions have been found along the Fort Pierce shoreline on the beach and nearshore area.

Those working in coastal areas should use due caution. In the event a suspect MEC is encountered, follow the 3Rs of explosive safety: Recognize, Retreat, Report. Recognize that munitions are dangerous; Retreat — do not approach, touch, move or disturb it, but carefully leave the area; and Report immediately what you saw and where you saw it to local law

SECTION 01 35 30 Page 3 enforcement — call 911 and then inform the Contracting Officer.

1.6 UXO TECHNICIANS

a. UXO Technicians: Provide one Unexploded Ordnance (UXO) Technician on standby as specified in Department of Defense Explosives Safety Board (DDESB) Technical Paper 18 (see paragraph REFERENCES above). The UXO Technician will provide MEC support for the dredging and placement operations. The UXO Technician will provide MEC Training to all Contractor personnel that will be responsible for preliminary identification of MEC and will inspect suspected MEC identified by Contractor personnel on an as-needed basis. If screened material containing suspected MEC is segregated into a separate disposal container from the screening apparatus, the UXO Technician will also inspect the disposal container (or dumpster) for MEC as needed. For Low-Probability, the required on-call/standby Support will consist of two UXO personnel, one of which must be at least UXO Tech III and the other at least a UXO Tech II in accordance with EM 385-1-97 for UXO On-Call/Standby Construction Support. The technicians serve in an advisory role for determining if suspect items identified by the dredge or beach crews are MPPEH or not MPPEH. If the item is MPPEH and can be determined to be hazard free through a visual inspection the UXO Techs may move the item out of the way and operations may resume. This visual inspection must not include handling or manipulation of the item to determine the item's status. If the suspect item cannot be determined to be free of explosive hazards via the visual inspection, notify local authorities so EOD can be requested.

(1) The UXO Technicians will determine the classification of MEC-like objects and determine the appropriate course of action to properly safeguard and dispose of the MEC or have the MEC disposed of by the appropriate agency. are to visually evaluate MEC-like objects and determine the appropriate course of action to properly resolve the situation or have the MEC disposed of by the appropriate agency.

(2) Provide support to the UXO Technicians as required and specified in this attachment. The UXO Technicians are to provide MEC support for the dredge and placement operations as necessary and are to visually inspect any potential MPPEH discovered to determine the MPEH’s classification.

(3) A single UXO technician can be mobilized to the site to provide the required 3R/MEC awareness training for project personnel.

(4) UXO Technicians must comply with the dredge Captain’s orders while on aboard dredge ship.

(5) Submit a daily report of activity. If no MEC/MPPEH response or activity occurred, reflect no MEC activity in the report.

1.6.1 Qualifications

A UXO Tech III ( Technical Paper 18 ) and UXO Tech II meeting the qualifications requirements of DDESB TP-18 must be consulted and mobilized to the project site for inspection in the event that suspected MEC /MPPEH are found

SECTION 01 35 30 Page 4 during project operations. The UXO Tech III may be supported by additional UXO Techs as needed. UXO Tech I’s can only work under the direct supervision of a UXO Tech III or II. A UXO Tech III must be available for consultation when using UXO Tech II’s.

1.6.2 Preparatory Phase Meeting

Prior to conducting initial dredging/beachfill activities, addition of a new employee to the project, and resuming dredging/beach fill activities following a period of inactivity, hold a Preparatory Phase meeting which the UXO Technician s will attend to answer any of the Government’s or Contractor's questions concerning MEC /MPPEH.

1.6.3 MEC Safety and Work Plan Review

The Contracting Officer will have review the Contractor's MEC Safety and Work Plan reviewed to ensure MEC aspects are adequately addressed. The Contractor's MEC Safety and Work Plan must communicate the Contractor's understanding of the Contractor's role and responsibility in the management of dredging and dredged material placement operations to prevent MEC from being dredged and placed on the beach. The Contractor's MEC Safety and Work Plan must also identify the work and safety procedures to be utilized by the supporting UXO Personnel and address actions by the non-uxo personnel upon the discovery of potential MEC/MPPEH items.

1.6.4 Training

1.6.4.1 MEC Recognition and Safety Training

The UXO Technician must conduct MEC safety/awareness/recognition In accordance with DA PAM 385-64 and EM 385-1-97 Change 1 Paragraph III.A.03.- All personnel involved in the operation need to receive UXO/3Rs awareness training prior to the start of work.

A UXO Technician must conduct 3R/MEC Awareness training for the Contractor's dredging vessel and shore based workers, as well as Corps personnel. Provide this training prior to resuming dredging/beach fill activities, and to all newly reporting personnel assigned to the project who have not attended MEC training in the previous twelve months. The MEC Training video can be found at https://youtu.be/bGr4K_v6NjA. Maintain a legible roster of MEC Training attendees.

1.6.4.2 Dredge Operational Training

Provide operational training to UXO Technicians by the dredge crew immediately when they report aboard the dredge. This training consists of basic training that the Contractor provides to regular crew members (i.e.

man overboard, fire, and inclement weather). UXO Technicians must comply with the dredge Captains orders while aboard the dredge.

1.7 QUALITY CONTROL

The Contractor must monitor the beachfill operations on a continuous basis and must be on-site to address problems as problems arise. Upon observation by the Contractor or athe UXO Technician that the screening system has degraded and is not functioning as intended, stop work and correct the deficiency to prevent oversized material or potential MEC from being dredged and placed on the beach during material placement operations.

SECTION 01 35 30 Page 5

1.8 MEC SAFETY AND WORK PLAN REQUIREMENTS

Coordinate the plan with the Activity/Job Hazard Analysis and the project Accident Prevention Plan in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS to ensure worker safety and safety of the public is addressed at all times during the contract. Include the following in the MEC Safety and Work Plan :

a. Shop drawings and detailed descriptions of the required screening devices at the discharge end of the pipeline. Also include the materials, equipment, procedures and personnel to be used in the construction, operations and oversight of such devices.

b. Personnel, equipment, and procedures to be used to perform visual inspections at the discharge end of the pipeline on the beach.

c. The measures to be followed if oversized material is discovered in the screening devices.

d. The measures to be followed if oversized material is identified as deposited on the beach.

e. The measures to be followed if MEC is discovered in the screening devices.

f. The measures to follow if MEC is identified as deposited on the beach

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 SCREENING DEVICES

Prevent oversized material and potential MEC from being placed on the beach by a screening device placed at the discharge end of the pipeline on the beach. The beach screening devices will meet the requirements of paragraph MATERIAL SCREENING AND REMOVAL of Section 35 20 25 BEACH FILL.

Provide minor adjustments to beach screening baskets as directed by the Contracting Officer to accommodate varying types and amounts of material being screened at the beach, at no additional cost to the Government. As an example, relief windows, other than the required screen apertures, sometimes need to be enlarged, reduced, or relocated to minimize residual biological debris in the basket during the inflow process and for postflow MEC inspection of residual material.

3.1.1 Inspection of Oversized Material

a. Design a method for inspection of all oversized material collected during beachfill pumping operations. Every effort will be made to flush all sand out of the residual material to allow for 100 percent inspection. Contractor personnel (who have been trained by the UXO Technician) will inspect the discharge end screening device and secondary containment after each load.

(1) Design any system that involves inspection of the oversized material inside the discharge end screening device with the following requirements:

SECTION 01 35 30 Page 6

(i.) allow entry or exit during times of inspector access, and

(ii.) sufficient size to allow the inspector to move around and rake through the material to inspect for MEC in the screening device.

(2) Ensure no loss of oversized material from any system that involves the movement of the screening device, or removing or rehandling of the oversized material to another location for inspection.

b. Upon inspection of the material, dispose of all oversized material off-site.

3.2 VISUAL INSPECTION OF PIPELINE DISCHARGE END

a. Contractor personnel (who have been trained by the UXO Technician) must perform visual inspections of pipeline discharge at all times while material is being placed on the beach.

b. Contractor personnel (who have been trained by the UXO Technician) are required to check the discharge screen/grate spacing to ensure compliance with contract specifications after each in-flow cycle during hopper dredge operations. Remove out of specification discharge screens from service until the screens are repaired.

c. Contractor personnel (who have been trained by the UXO Technician) are required to conduct a 100 percent inspection of material captured in he beach screening basket at the end of each inflow cycle for MEC for oversized material and be observant for anything that appears possibly MEC related . This will normally include the use of hand-tools (rakes, shovel, and etc.). If MEC /MPPEH are suspected, stop work immediately and contact the UXO Technician s and the Contracting Officer. The captured material may be transferred to a secondary basket for inspection.

d. Contractor personnel (who have been trained by the UXO Technician) must be especially vigilant when inspecting the captured debris for the presence of material greater than 3/4 inches in its smallest diameter. The presence of this type of material in the beach screen is a positive indicator that there is damage to or a malfunction of the screen (the material could be MEC, rocks, bricks or other types of hardened debris). The dredge must be notified as soon as possible to cease operations and to determine the cause of the oversize material in the beach screening basket.

de. Do not enter a screening device containing material until the screening device has been inspected and cleared. After material has been inspected and cleared, remove all debris collected in the screening device from the work site. The debris may be temporarily stored on-site in a dumpster or roll-off box. Do not bury any debris collected in the screening device in or on the beach.

3.3 DISCOVERYINSPECTION OF MEC

If material is detected on the dredge, in the screening device, or on the beach that is suspected to be MEC /MPPEH, stop work immediately and have the UXO Technician s evaluate the material. UXO Technicians must be available on-site within 12 hours of identification of suspected MEC.

SECTION 01 35 30 Page 7

Notify the Contracting Officer of the suspected MEC and provide a digital photo of the suspected MEC item(s) to the Government QA Inspector. If, after evaluation by the UXO Technician s, the material in question is determined to be MEC, follow the instructions of the UXO Technician s regarding how to proceed and implement the following procedures:

a. All personnel will withdraw a distance determined by the UXO Technician s to be safe, from the area where the MEC is detected.

b. Call 911 and report the location and description of MEC to local law enforcement.

c. Stop dredging and beachfill work, until determined safe by the UXO Technician s or emergency response personnel.

d. Coordinate securing and disposal of all MEC and munitions with the Contracting Officer and emergency response agencies EOD.

e. Inventory and track all MEC items as MEC items are found. A running total will be kept and included in the Contractor’s daily report.

f. The UXO Tech will provide two copies of the MEC inventory to the Contracting Officer when turnover of MEC items to EOD forces is arranged.

f g. Inspect the screening devices and dragheads for damage or the presence of suspect MEC/MPPEH before resuming beach fill operations or any work is performed on the screening devices or dragheads.

3.3.1 Contractor Support

Provide assistance as required by the emergency response agency. This will be coordinated by the Contracting Officer and may consist of such activities as digging holes with equipment for detonation of MEC items, and/or providing extra perimeter security during emergency response activities. The Contractor will not be required or expected to place site workers in hazardous situations during emergency responses to MEC at the project site.

3.4 FAILURE OF BEACH SCREENING EQUIPMENT OR PROCEDURES

In the event that unscreened material or material not inspected by Contractor personnel (who have been trained by the UXO Technician) is placed with the fill material, inspect that material by Contractor personnel (who have been trained by the UXO Technician) using an appropriate metal detector. In the event that unscreened material or oversized material is placed with the fill material, whether due to failure of the screen or other error, stop work immediately. Corrective actions must take place and the affected fill area must be identified, screened, and reconstituted to be in accordance with this project work scope.

3.5 DETECTION AND REMOVAL OF OVERSIZED MATERIAL

Stop work immediately and implement the following procedures when any item that physically should not be able to pass through the screening devices is detected on the beach:

a. Stop dredging and beachfill work.

SECTION 01 35 30 Page 8

b. Report the incident to the Contracting Officer.

c. Repair the screening devices if necessary. Take digital photos to document damaged screening device(s) and effected repairs. Submit photos to the Contracting Officer with daily reports. Provide photos of repaired screens to assigned Government QA representative(s) prior to resuming work.

d. Do not resume beachfill and/or dredging work until such cause is positively identified and steps are taken to prevent recurrence, and upon subsequent notification from the Contracting Officer.

-- End of Section --

SECTION 01 35 30 Page 9

B.08.02 Amend 00001 W912EP23B0003 Ft. Pierce FY23 SPP first
23B0003_FortPierceBeachRen_Amendment0001_Rev.1_2022_11_18
FortPierce-SF30Cont-Amendment0001Markup_RP__Rev1_2022_11_18
SUMMARY OF CHANGES
2. DRAWINGS:
01 22 00
01 22 00 - MEASUREMENT AND PAYMENT
01 22 00 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Reference
1.2 RESIDENT MANAGEMENT SYSTEM RMS
1.2.1 Definition
1.2.2 Instructions
1.3 SUBMITTALS
1.4 JOB PAYMENT ITEMS
1.4.1 Mobilization and Demobilization Line Item 0001
1.4.2 Vibration Control and Monitoring Line Item 0007 and 0020
1.4.3 Environmental Species Monitoring Line Item 0008 and 0021
1.4.4 Turbidity Monitoring Line Item 0009 and 0022
1.4.5 Mobilization and Demobilization for Sea Turtle Trawl Sweeping
1.4.6 Mobilization and Demobilization for Remote Munitions and Explosives
1.5 UNIT PRICE PAYMENT ITEMS
1.5.1 Beach Fill Line Item 0002 and 0016
1.5.1.1 Payment
1.5.1.2 Measurement
1.5.1.3 Unit of Measure
1.5.2 Screening Line Item 0003 and 0017
1.5.2.1 Payment
1.5.2.2 Measurement
1.5.2.3 Unit of Measure
1.5.3 Beach Tilling Line Item 0004 and 0018
1.5.3.1 Payment
1.5.3.2 Measurement
1.5.3.3 Unit of Measure
1.5.4 Remediation of Noncompliant Material Line Item 0005
1.5.4.1 Payment
1.5.4.2 Measurement
1.5.4.3 Unit of Measure
1.5.5 Transportation & Disposal of Unacceptable Material Line Item 0006
1.5.5.1 Payment
1.5.5.2 Measurement
1.5.5.3 Unit of Measure
1.5.6 Sea Turtle Trawl Sweeping Hopper Dredge Only Line Item 0011
1.5.6.1 Payment
1.5.6.2 Measurement
1.5.6.3 Unit of Measure
1.5.7 Standby Time Line Item 0012
1.5.7.1 Payment
1.5.7.2 Measurement
1.5.7.3 Unit of Measure
1.5.8 Partnering Regroup Line Item 0013
1.5.8.1 Payment
1.5.8.2 Measurement
1.5.8.3 Unit of Measure
1.5.9 On-Site MEC Support Line Item 0015
1.5.9.1 Payment
1.5.9.2 Measurement
1.5.9.3 Unit of Measure
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
3.1.1 Requesting Progress Payment
3.1.2 Options and Modification CLINS
01 35 30
01 35 30 - MUNITIONS AND EXPLOSIVES OF CONCERN MEC CONSTRUCTION SUPPORT
01 35 30 - MUNITIONS AND EXPLOSIVES OF CONCERN MEC CONSTRUCTION SUPPORT
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 MEC SAFETY AND WORK PLAN
1.4.1 MEC Safety and Work Plan Requirements
1.5 MEC IN PROJECT AREAS
1.6 UXO TECHNICIANS
1.6.1 Qualifications
1.6.2 Preparatory Phase Meeting
1.6.3 MEC Safety and Work Plan Review
1.6.4 Training
1.6.4.1 MEC Recognition and Safety Training
1.6.4.2 Dredge Operational Training

1.7 QUALITY CONTROL

PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 SCREENING DEVICES
3.1.1 Inspection of Oversized Material
3.2 VISUAL INSPECTION OF PIPELINE DISCHARGE END
3.3 DISCOVERYINSPECTION OF MEC
3.3.1 Contractor Support
3.4 FAILURE OF BEACH SCREENING EQUIPMENT OR PROCEDURES
3.5 DETECTION AND REMOVAL OF OVERSIZED MATERIAL