FortPierce2023_BCOESCERT_EN.pdf
PDF 83 KB Posted
- Solicitation number
- W912EP23B0003
About this file
This memorandum concerns a shore protection project for beach renourishment in Fort Pierce, Florida. The project work includes constructing a beach berm along approximately 7,000 feet of shoreline south of Fort Pierce Inlet through dredging beach compatible sand from Capron Shoal offshore and offloading it inside the South Jetty of Fort Pierce Inlet. Additional work involves endangered species observation, sea turtle monitoring, beach tilling, and vibration control. The Chief of the Engineering Division has certified that all appropriate reviews have been completed for the project bid package.
The related federal contract opportunity is solicitation number W912EP23B0003 for the Shore Protection Project Fort Pierce Beach Renourishment 2023 in St. Lucie County, Florida. A pre-bid conference will be held via teleconference on November 18, 2022, and potential offerors are requested to confirm attendance by email no later than November 17, 2022. The opportunity is issued by the Department of the Army Corps of Engineers Engineering District Jacksonville.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CESAJ-EN 11 OCTOBER 2022
MEMORANDUM FOR THE RECORD
SUBJECT: SHORE PROTECTION PROJECT, FORT PIERCE BEACH RENOURISHMENT
2023, ST. LUCIE COUNTY, FLORIDA
Project work consists of constructing a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. The project work is subdivided into a base and one option as shown on the drawings. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the project fill area is located at the end of Seaway Drive and near the south jetty offloading area. Project work also includes but is not limited to endangered species observation, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and vibration control and monitoring.
In accordance with the provisions of ER 415-1-11, certification is made that all appropriate biddability, constructability, operability, environmental, and sustainability (BCOES) review comments have been incorporated into the subject bid package or otherwise satisfactorily resolved. Feedback to reviewers for all comments is available on DrChecks.
Laureen Borochaner Chief, Engineering Division Date
| 2022-10-12T14:54:33-0400 | |
| MARIN.AMANDA.LAVIGNE.1005787277 |
File details come from the government source that posted it. Updated .