This solicitation is for maintenance dredging of various channels in Tampa Harbor, Florida. The base work includes dredging Egmont Cut-1, Egmont Cut-2, Mullet Key, and Cut-A (TB) to a depth of 45 feet. Option A adds dredging of Egmont Cut-1 from station 122+00 to 368+00. Option B adds dredging of Egmont Cut-1 from station 368+00 to 460+00. All dredged material will be disposed of at a beach disposal area on Egmont Key. The solicitation will be issued on April 4th with bids due on May 4th. The contractor must begin work within 60 days and complete all work within 185 days, including 135 days for base work and additional time periods for the options. The total value of construction is estimated between $10-25 million.