This solicitation is for maintenance dredging services for the Tampa Harbor in Hillsborough County, Florida. Work includes dredging Egmont Channel Cuts 1 and 2, Mullet Key Channel, and Cut-A (TB) to depths of 45 and 43 feet, with 2 feet of allowable overdepth. A base scope and two options are specified, with dredged materials to be disposed of on Egmont Key. Additional requirements include turbidity monitoring, sea turtle protection measures, environmental monitoring, vibration monitoring, and beach tilling. The estimated value is between $10-25 million. The pre-bid meeting was held on April 13, 2022 and bids are due on May 4, 2022. The contractor must begin work within 60 days of notice to proceed and complete all work within 185 days, including 135 days for the base scope and 10 and 40 days for the two options respectively. This is an unrestricted procurement open to all responsible offerors. The solicitation will be issued electronically on April 4, 2022 via Sam.gov.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 OFFERS

NO. 1 NO. 2 NO. 3

OFFEROR: OFFEROR: OFFEROR:

B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF ADDENDA ISSUED: 3 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN

NO. 7B DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $3,060,000.00 $3,060,000.00 $7,950,000.00 $7,950,000.00 $6,100,000.00 $6,100,000.00 $4,750,000.00 $4,750,000.00

0002 EXCAVATION, UNCLASSIFIED (ESTIMATED QUANTITY, SEE NOTE 2) 401,000 CY $17.40 $6,977,400.00 $19.90 $7,979,900.00 $15.45 $6,195,450.00 $22.50 $9,022,500.00 0003 TURBIDITY MONITORING 1 JOB $115,500.00 $115,500.00 $70,000.00 $70,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 0004 ENVIRONMETAL SPECIES MONITORING 1 JOB $121,800.00 $121,800.00 $35,000.00 $35,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00

0005 MOBILIZATION AND DEMOBILIZATION FOR SEA TURTLE TRAWL

SWEEPING (HOPPER DREDGE ONLY, SEE NOTE 3)

1 JOB

$8,000.00

$8,000.00 $35,000.00 $35,000.00 $29,000.00 $29,000.00 $25,000.00 $25,000.00

0006 SEA TURTLE TRAWL SWEEPING (HOPPER DREDGE ONLY, SEE NOTE

3)

1 DAY

$8,000.00

$8,000.00 $7,000.00 $7,000.00 $6,500.00 $6,500.00 $5,000.00 $5,000.00

0007 STANDBY TIME (SEE NOTE 4) 24 HR $4,600.00 $110,400.00 $6,000.00 $144,000.00 $7,980.00 $191,520.00 $5,000.00 $120,000.00 0008 BEACH TILLING (ESTIMATED QUANTITY) 11 ACRE $1,300.00 $14,300.00 $600.00 $6,600.00 $635.00 $6,985.00 $1,000.00 $11,000.00 0009 REMEDIATION OF NONCOMPLIANT MATERIAL (ESTIMATED QUANTI 1 ACRE $7,500.00 $7,500.00 $6,000.00 $6,000.00 $1,250.00 $1,250.00 $25,000.00 $25,000.00 0010 SCREENING (ESTIMATED QUANTITY) 401,000 CY $1.40 $561,400.00 $3.50 $1,403,500.00 $0.70 $280,700.00 $1.00 $401,000.00 0011 REMOVAL OF UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY) 401 CY $220.00 $88,220.00 $1,000.00 $401,000.00 $75.00 $30,075.00 $200.00 $80,200.00 0012 PARTNERING REGROUP 1 EACH $7,000.00 $7,000.00 $3,500.00 $3,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 0013 CONSTRUCTION/VIBRATION CONTROL AND MONITORING 1 JOB $68,900.00 $68,900.00 $120,000.00 $120,000.00 $40,000.00 $40,000.00 $25,000.00 $25,000.00

Total Base (Line Items 0001 - 0013) $11,148,420.00 $18,161,500.00 $12,961,480.00 $14,544,700.00

0014 EXCAVATION, UNCLASSIFIED (ESTIMATED QUANTITY) 67,000 CY $17.30 $1,159,100.00 $28.50 $1,909,500.00 $19.50 $1,306,500.00 $19.00 $1,273,000.00 0015 TURBIDITY MONITORING 1 JOB $20,000.00 $20,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $5,500.00 $5,500.00 0016 ENVIRONMENTAL SPECIES MONITORING 1 JOB $111,600.00 $111,600.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $2,500.00 $2,500.00 0017 BEACH TILLING. (ESTIMATED QUANTITY) 3 ACRE $1,300.00 $3,900.00 $600.00 $1,800.00 $635.00 $1,905.00 $1,000.00 $3,000.00

0018 REMEDIATION OF NONCOMPLIANT MATERIAL (ESTIMATED

QUANTITY)

1 ACRE $7,500.00 $7,500.00 $6,000.00 $6,000.00 $1,250.00 $1,250.00 $25,000.00 $25,000.00 0019 SCREENING (ESTIMATED QUANTITY) 67,000 CY $1.40 $93,800.00 $3.50 $234,500.00 $0.70 $46,900.00 $1.00 $67,000.00

0020 REMOVAL OF UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY) 67 CY $220.00 $14,740.00 $1,000.00 $67,000.00 $75.00 $5,025.00 $200.00 $13,400.00 Total Option A (Line Items 0014 - 0020) $1,410,640.00 $2,243,800.00 $1,396,580.00 $1,389,400.00

$12,559,060.00 $20,405,300.00 $14,358,060.00 $15,934,100.00

0021 EXCAVATION, UNCLASSIFIED (ESTIMATED QUANTITY) 392,000 CY $16.75 $6,566,000.00 $19.50 $7,644,000.00 $17.40 $6,820,800.00 $19.00 $7,448,000.00 0022 TURBIDITY MONITORING 1 JOB $97,400.00 $97,400.00 $60,000.00 $60,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 0023 ENVIRONMENTAL SPECIES MONITORING 1 JOB $120,000.00 $120,000.00 $30,000.00 $30,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 0024 BEACH TILLING. (ESTIMATED QUANTITY) 12 ACRE $1,300.00 $15,600.00 $600.00 $7,200.00 $635.00 $7,620.00 $1,000.00 $12,000.00

0025 REMEDIATION OF NONCOMPLIANT MATERIAL (ESTIMATED

QUANTITY)

1 ACRE $7,500.00 $7,500.00 $6,000.00 $6,000.00 $1,250.00 $1,250.00 $25,000.00 $25,000.00 0026 SCREENING (ESTIMATED QUANTITY) 392,000 CY $1.40 $548,800.00 $3.50 $1,372,000.00 $0.70 $274,400.00 $1.00 $392,000.00

0027 REMOVAL OF UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY) 392 CY $220.00 $86,240.00 $1,000.00 $392,000.00 $75.00 $29,400.00 $200.00 $78,400.00 Total Option A (Line Items 0021 - 0027) $7,441,540.00 $9,511,200.00 $7,208,470.00 $8,030,400.00

$20,000,600.00 $29,916,500.00 $21,566,530.00 $23,964,500.00

0028 EXCAVATION, UNCLASSIFIED (ESTIMATED QUANTITY) 220,000 CY $16.80 $3,696,000.00 $47.00 $10,340,000.00 $25.75 $5,665,000.00 $22.50 $4,950,000.00 0029 TURBIDITY MONITORING 1 JOB $56,800.00 $56,800.00 $85,000.00 $85,000.00 $24,000.00 $24,000.00 $45,000.00 $45,000.00 0030 ENVIRONMENTAL SPECIES MONITORING 1 JOB $57,900.00 $57,900.00 $45,000.00 $45,000.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 0031 BEACH TILLING. (ESTIMATED QUANTITY) 8 ACRE $1,300.00 $10,400.00 $600.00 $4,800.00 $635.00 $5,080.00 $1,000.00 $8,000.00

0032 REMEDIATION OF NONCOMPLIANT MATERIAL (ESTIMATED

QUANTITY)

1 ACRE $7,500.00 $7,500.00 $6,000.00 $6,000.00 $1,250.00 $1,250.00 $25,000.00 $25,000.00 0033 SCREENING (ESTIMATED QUANTITY) 220,000 CY $1.40 $308,000.00 $3.50 $770,000.00 $0.70 $154,000.00 $1.00 $220,000.00

0034 REMOVAL OF UNACCEPTABLE MATERIAL (ESTIMATED QUANTITY) 220 CY $220.00 $48,400.00 $1,000.00 $220,000.00 $75.00 $16,500.00 $200.00 $44,000.00 Total Option A (Line Items 0028 - 0034) $4,185,000.00 $11,470,800.00 $5,875,830.00 $5,312,000.00

$24,185,600.00 $41,387,300.00 $27,442,360.00 $29,276,500.00

Option B (EGMONT CUT-1 STA. 368+00 TO STA. 478+00)

Total Bid (Line Items 0001 - 0027)

Option C

Total Bid (Line Items 0001 - 0034)

Option A (EGMONT CUT-1 STA. 122+00 TO STA. 368+00)

Total Bid (Line Items 0001 - 0020)

Base (EGMONT CUT-1 STA.478+00 TO CUT-A (TB) STA.0+00)

Offeror: 2 Great Lakes Dredging & Dock Company, LLC

IGE OFFERS (Continued)

PROJECT TITLE

Offeror: 3 Weeks Marine, Inc.

TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT

PROJECT- EGMONT CHANNEL CUTS 1 & 2, 43-FOOT

PROJECT – MULLET KEY

CHANNEL & CUT-A (TB), HILLSBOROUGH COUNTY,

FLORIDA

Yes

Original Government Estimate Offeror: 1 Manson Construction

Company

ABSTRACT OF OFFERS

SOLICITATION NUMBER: W912EP22B0004

DATE ISSUED DATE CLOSED I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

AME AND TITLE OF CERTIFYING OFFICIA

ISSUING OFFICE

April 4, 2022 June 28, 2022 Timothy Humphrey

Signature

Yes

Yes Yes Yes

Yes

Bidders