21-269_TPA-HBR-ZONE-4_CUT-G_14-15JAN2022_3X3AVG_BUXBAUM-N.zip
ZIP file 39 MB Posted
- Solicitation number
- W912EP22B0004
About this file
This solicitation is for maintenance dredging services in Tampa Harbor, Florida. The base work includes dredging Egmont Cut-1, Egmont Cut-2, Mullet Key Channel and Cut-A to a depth of 45 or 43 feet plus 2 feet of overdepth allowance. Optional work includes additional dredging in Egmont Cut-1. Dredged material will be disposed of in the designated beach disposal area on Egmont Key. Ancillary work includes turbidity monitoring, sea turtle protection measures, environmental monitoring, and beach tilling. A pre-bid conference will be held on April 13, 2022. Bids are due on or around May 4, 2022. The contractor must begin work within 60 days of notice to proceed and complete all work within 185 calendar days, including 135 days for base work and additional time allotted for options. This is an unrestricted acquisition encouraging participation from all responsible offerors.
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .