13-087 DTM.zip
ZIP file 239 KB Posted
- Solicitation number
- W912EP22B0004
About this file
This solicitation is for maintenance dredging services in Tampa Harbor, Florida. The project involves dredging Egmont Cut 1 and 2, Mullet Key Channel and Cut A to a depth of 45 feet, along with two optional areas in Egmont Cut 1. Services include turbidity monitoring, sea turtle protection, and disposal of dredged materials on Egmont Key beach. The estimated value is between $10-25 million. The base work must be completed within 135 days of notice to proceed, with optional areas to be completed within 10 and 40 additional days. A pre-bid conference will be held on April 13th and bids are due around May 4th. Interested vendors must register on SAM.gov to receive any amendments. The awarded contractor must be registered in SAM and perform at least 40% of dredging volume using their own or other small business equipment to qualify as small.
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .