W912EP20R0039 Amendment 0008.pdf

PDF 15 MB Posted

Attached to
Fort Buchanan Family Housing Replacement Fort Buchanan-Guaynabo, Puerto Rico
Solicitation number
W912EP20R0039
Issued by

About this file

This solicitation seeks proposals for the Fort Buchanan Family Housing Replacement project in Fort Buchanan, Puerto Rico. The scope of work is to demolish 27 existing family housing units, construct 26 new family housing units and supporting facilities including site work and utility systems to conform with Army Family Housing standards. Proposals are due by November 6, 2020. The project consists of a base and one option with an anticipated period of performance of 814 calendar days from notice to proceed. The magnitude of construction is estimated between $10-25 million under NAICS code 236115 with a size standard of $39.5 million. An optional pre-proposal teleconference will be held on October 27, 2020. Interested parties must register as vendors on beta.SAM.gov in order to receive any amendments to the solicitation which will be issued and posted electronically at that site. Registration in the System for Award Management is also required to be eligible for award.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-8 4

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

X 9B. DATED (SEE ITEM 11)

7-October-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION

NO. W912EP20R0039

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

W912EP20R0039 FORT BUCHANAN FAMILY HOUSING REPLACEMENT FORT BUCHANAN , PUERTO RICO

A. See Continuation Sheet for Amendment details.

B. The proposal due date remains unchanged.

C. All other Terms and Conditions remain unchanged.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

3. EFFECTIVE DATE

27-Nov-2020

X

W912EP20R0039

SF 30 CONTINUATION SHEET

Fort Buchanan Family Housing Replacement Fort Buchanan, Guaynabo, Puerto Rico

W912EP20R0039 Amendment 0008

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.

Volume 1 DELETE Section 00010A and REPLACE with the attached Section 00010A.

Volumes 2 and 3 DELETE Table of Contents and REPLACE with the attached Table of Contents.

DELETE Submittal Register and REPLACE with the attached Submittal Register.

DELETE Section 01 45 35 and REPLACE with the attached Section 01 45 35.

DELETE Section 07 22 00 and REPLACE with the attached Section 07 22 00.

ADD Section 07 53 23.

DELETE Section 07 56 00.

DELETE Section 08 36 13 and REPLACE with the attached Section 08 36 13.

ADD Section 09 24 24.

2. DRAWINGS:

DELETE Sheet A-111A and REPLACE with the attached Sheet A-111A.

DELETE Sheet A-111B and REPLACE with the attached Sheet A-111B.

DELETE Sheet A-111C and REPLACE with the attached Sheet A-111C.

DELETE Sheet A-111C.2 and REPLACE with the attached Sheet A-111C.2.

DELETE Sheet A-301A and REPLACE with the attached Sheet A-301A.

DELETE Sheet A-301B and REPLACE with the attached Sheet A-301B.

DELETE Sheet A-301C and REPLACE with the attached Sheet A-301C.

DELETE Sheet A-501 and REPLACE with the attached Sheet A-501.

DELETE Sheet CS501 and REPLACE with the attached Sheet CS501.

DELETE Sheet ES503 and REPLACE with the attached Sheet ES503.

DELETE Sheet L-102 and REPLACE with the attached Sheet L-102.

DELETE Sheet L-109 and REPLACE with the attached Sheet L-109.

DELETE Sheet S-002 and REPLACE with the attached Sheet S-002.

(End of Summary of Changes)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

FORT BUCHANAN FAMILY HOUSING REPLACEMENT

FORT BUCHANAN, PUERTO RICO

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 DEMOLITION JOB $_______________

0002 LAND DEVELOPMENT JOB $_______________

0003 HOUSING JOB $_______________

0004 RECREATIONAL PARK JOB $_______________

SUBTOTAL BASE (LINE ITEMS 0001 THROUGH 0004) $_______________

0005 MUNICIPAL TAXES JOB $_______________

TOTAL BASE (LINE ITEMS 0001 THROUGH 0005) $_______________

0006 BID OPTION 1 (House 14 Model A.A) JOB $_______________

0007 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 1 (LINE ITEMS 0006 THROUGH 0007) $_______________

0008 BID OPTION 2 (House 15 Model A.A) JOB $_______________

0009 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 2 (LINE ITEMS 0008 THROUGH 0009) $_______________

0010 BID OPTION 3 (House 16 Model A.A) JOB $_______________

0011 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 3 (LINE ITEMS 0010 THROUGH 0011) $_______________

0012 BID OPTION 4 (House 17 Model A.A) JOB $_______________

0013 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 4 (LINE ITEMS 0012 THROUGH 0013) $_______________

0014 BID OPTION 5 (North Buffer Trees) JOB $_______________

0015 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 5 (LINE ITEMS 0014 THROUGH 0015) $_______________

BID OPTION 6 (PARK TREES, SHRUBS AND GROUND

COVER) JOB $_______________

0017 MUNICIPAL TAXES JOB $_______________

TOTAL BID OPTION 6 (LINE ITEMS 0016 THROUGH 0017) $_______________

0018 BID OPTION 7 - APPLIANCES (KITCHEN, LAUNDRY) JOB $_______________

0019 MUNICIPAL TAXES JOB $_______________

W912EP20R0039 00010A-1 Amendment 0008

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

FORT BUCHANAN FAMILY HOUSING REPLACEMENT

FORT BUCHANAN, PUERTO RICO

TOTAL BID OPTION 7 (LINE ITEMS 0018 THROUGH 0019) $_______________

TOTAL OPTIONS (LINE ITEMS 0006 THROUGH 0019) $_______________

TOTAL BASE PLUS OPTIONS (LINE ITEMS 0001 THROUGH 0019) $_______________

NOTES

(1) OFFER MUST PRICE ALL LINE ITEMS.

(2) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING JOB AS THE UNIT.

(8) LINE ITEMS 0006 THROUGH 0013 INCLUDE ALL REQUIRED WORK TO DELIVER A COMPLETE AND USABLE FACILITY

INCLUDING ASSOCIATED UTILITIES NOT INCLUDED IN LINE ITEM 2.

(NTP).

(10) PRICE FOR BID OPTION 7 SHALL BE GOOD FOR 365 CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).

(7) LINE ITEM 0002 EXCLUDES UTILITY INSTALLATION FOR BID OPTIONS 1 THROUGH 4.

(3) THE JOB PRICE AND PAYMENT MADE FOR EACH ITEM LISTED SHALL CONSTITUTE FULL COMPENSATION FOR FURNISHING ALL PLANT, LABOR, MATERIALS AND EQUIPMENT, AND PERFORMING ANY ASSOCIATED CONTRACTOR QUALITY CONTROL, ENVIRONMENTAL PROTECTION, MEETING SAFETY REQUIREMENTS, TESTS AND REPORTS, AND FOR PERFORMING ALL WORK REQUIRED FOR WHICH SEPARATE PAYMENT IS NOT OTHERWISE PROVIDED. ALL COSTS FOR ITEMS OF WORK, WHICH ARE NOT SPECIFICALLY MENTIONED TO BE INCLUDED IN A PARTICULAR JOB OR UNIT PRICE PAYMENT ITEM, SHALL BE INCLUDED IN THE LISTED JOB ITEM AND MUST CLOSELY ASSOCIATED WITH THE

WORK INVOLVED.

(4) PROGRESS PAYMENTS FOR JOB CLINS WILL BE MADE IN ACCORDANCE WITH THE PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS CLAUSE OF SECTION 00700 CONTRACT CLAUSES. SUBMIT A LIST OF PAY ACTIVITIES, (SCHEDULE OF VALUES) TO BREAKDOWN BID FOR EACH JOB CLIN. SUBMIT THE SCHEDULE OF VALUES FOR GOVERNMENT APPROVAL WITH THE BASELINE SCHEDULE SUBMITTAL (SEE SECTION 01 32 01 PROJECT SCHEDULE).

AN UNBALANCED SCHEDULE OF VALUES AND PAY ACTIVITY SCHEDULE WILL BE RETURNED FOR REVISION.

(5) THE CONTRACT PRICE WILL BE ADJUSTED IF NECESSARY FOR THE AMOUNT OF CONSTRUCTION TAXES PAID. NO MARK-UPS WILL BE ALLOWED IN THIS LINE ITEM. THE CONTRACTOR WILL BE PAID ON THE BASIS OF PROOF OF

PAYMENT FROM THE APPROPRIATE COMMONWEALTH OF PUERTO RICO MUNICIPAL AUTHORITIES.

(6) THE AMOUNTS INCLUDED FOR THE CLINS RELATED TO MUNICIPAL TAXES WILL NOT BE CONSIDERED FOR PRICE

EVALUATION OF THE PROPOSALS.

W912EP20R0039 00010A-2 Amendment 0008

Fort Buchanan Family Housing Replacement Fort Buchanan AMENDMENT 0008 Guaynabo, Puerto Rico

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 10 00 SF 1442 AND BIDDING SCHEDULE

00 31 32 GEOTECHNICAL DATA

00 33 50 WEATHER AND WATER STAGE DATA

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS AND SPECIAL PROVISIONS

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 52 10 CONTRACTING OFFICER'S FIELD OFFICE

01 55 26 TRAFFIC CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 78 02 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 60 00 CELLULAR PVC FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 40 FOAMED-IN-PLACE MASONRY WALL INSULATION

07 22 00 ROOF AND DECK INSULATION

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 53 23 MEMBRANE ROOFING

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 55 00 PROTECTED MEMBRANE ROOFING

07 56 00 FLUID-APPLIED ROOFING

PROJECT TABLE OF CONTENTS Page 1

W912EP20R0039 AMENDMENT 0008

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 36 13 SECTIONAL OVERHEAD DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 23 00 GYPSUM PLASTERING

09 24 23 CEMENT STUCCO

09 24 24 INTERIOR CEMENT PLASTER

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 90 00 PAINTS AND COATINGS

09 97 23 DIRECT APPLIED FINISH SYSTEM

DI VI SI ON 10 - SPECI ALTI ES

10 71 13.13 HURRICANE FABRIC

DI VI SI ON 11 - EQUI PMENT

11 31 13 ELECTRIC KITCHEN EQUIPMENT

11 68 13 PLAYGROUND EQUIPMENT

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WINDOW BLINDS

12 32 00 MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

12 93 00 SITE FURNISHINGS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 PLUMBING PIPING INSULATION

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 81 29 VARIABLE REFRIGERANT FLOW SYSTEM OUTDOOR UNIT

PROJECT TABLE OF CONTENTS Page 2

23 81 30 VARIABLE REFRIGERANT FLOW INDOOR SYSTEM

DI VI SI ON 26 - ELECTRI CAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS

26 36 23.00 20 MANUAL TRANSFER SWITCHES

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 13.43 TELEVISION DISTRIBUTION SYSTEM

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 31 16.13 CHEMICAL TERMITE CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 18 16.13 PLAYGROUND PROTECTIVE SURFACING

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 12 33.00 30 WATER METERS

33 30 00 SANITARY SEWERAGE

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 60 PAGES

Fort Buchanan Family Housing Replacement Fort Buchanan

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 G ROList of Contact Personnel

1.11 G ROLabor, Equipment, and Material

Report

1.11Daily Equipment Report

1.13OPSEC SOP/Plan

1.13Level I OPSEC Training

1.13 G ROList Of Verified/Eligible

Candidates

1.23.1 G ROHurricane and Severe Storm Plan

1.23.1 G DOAccident Prevention Plan

SD-07 Certificates

1.13AT Level I Awareness Training

1.16 G ROInsurance

1.14Progress Photographs

SD-11 Closeout Submittals

1.6 G ROACM Certification

01 30 00 SD-01 Preconstruction Submittals

1.6.3Draft Joint Risk Register

1.6.4List of Subcontractors

1.6.5Certificate of Insurance

SD-07 Certificates

1.7.1.2 G ROPartnering Meeting(s) Written

Synopsis

3.3Signature Authority

3.4Drug-Free Work Place Record

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 60 PAGES

01 32 01 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

SD-07 Certificates

3.6.2 G ROPeriodic Schedule Updates

01 33 00 SD-01 Preconstruction Submittals

1.9 G DOSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary LEED for Homes

Checklist

1.4.1Sustainability Action Plan

1.5.3.1Preliminary Sustainability eNotebook

SD-11 Closeout Submittals

1.5.3.1 GFinal LEED for Homes Checklist

1.5.3.1Final Sustainability eNotebook

1.5.3.1Amended Final Sustainability eNotebook

1.5.3.1Amended Final LEED Checklist

3.2Third Party Certification

Certificate, Assessment, or

Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 G DOAccident Prevention Plan (APP)

1.15 G DOAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 60 PAGES

01 35 26 1.8 G DOActivity Hazard Analysis (AHA)

1.6.1.1 G DOSite Safety and Health Officer

Qualifications (SSHO)

1.7.2.3 G DOCritical Lift Plan

1.7.2.2 G DOStandard Lift Plan

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12.1Mishap Notification

1.12.2 G DOAccident Reports

1.12.3LHE Inspection Reports

1.14.5Regulatory Citations and

Violations

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

1.12.4Crane Certificate of Compliance

01 45 04 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

SD-07 Certificates

3.7.2 G ROLaboratory Qualifications

3.2.2Letter of Authority

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 60 PAGES

01 45 35 3.1.1 GProject Manual

3.1.1Written NDT Practices

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.1Daily Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

1.5 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.1 GInterim Report

3.1.2 GInterim Report

3.1.1 GComprehensive Final Report

3.1.2 GComprehensive Final Report

01 50 02 SD-01 Preconstruction Submittals

1.4.1 G ROMobilization/Demobilization Plan

1.4.3 G RODocumentation of Existing

Conditions and Post Construction

Restoration

1.4.2 G ROSite Plan

SD-02 Shop Drawings

2.1Contractor's Temporary Facilities

3.5Contractor's Temporary Facilities

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 60 PAGES

01 50 02 3.2.6Temporary Electric Drawings

SD-06 Test Reports

2.7 G ROBackflow Preventer Tests

SD-07 Certificates

1.5 G ROBackflow Tester Certification

01 52 10 SD-02 Shop Drawings

2.1Contracting Officer's Field Office

01 55 26 SD-01 Preconstruction Submittals

3.3 G ROTraffic Control

01 57 20 SD-01 Preconstruction Submittals

G DOEnvironmental Protection Plan

SD-07 Certificates

G ROPuerto Rico Boa Monitoring

Certificate

G DOEnvironmental/Pollution Control

SD-11 Closeout Submittals

G DOInvasive And Nuisance Species

Report

G ROLogs/Summary Of Puerto Rican

Boa Monitoring

01 78 02 SD-03 Product Data

1.3.9 G ROAs-Built Record of Equipment

and Materials

1.4.1 G ROWarranty Management Plan

1.7 G ROFinal Cleaning

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 60 PAGES

01 78 02 1.4.5 G ROEquipment Warranty Identification

Tags

SD-05 Design Data

1.8.1Equipment-In-Place List

1.8.1Maintenance And Parts Data

SD-07 Certificates

1.4.2.1Warranty Of Construction

SD-11 Closeout Submittals

3.1.1 G ROInterim DD FORM 1354

3.1.2 G ROChecklist for DD FORM 1354

1.3.4Preliminary (Working) As-Built

Drawings

1.3.5 G ROFinal As-Built Drawings

1.3.8 G ROFinal As-Built Drawings

1.3.1.2 G ROCad Working As-Built Drawings

01 78 23 SD-10 Operation and Maintenance

Data

1.4 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3Training Outline

3.1.2Training Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 60 PAGES

01 91 00.15 1.7.1 GLead Commissioning Specialist

1.7.2 GTechnical Commissioning

Specialists

1.7 GCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 GDesign Review Report

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G DOTemplate Building Envelope

Inspection Checklists

3.1.5.2 G DOBuilding Envelope Inspection

Checklists

3.1.5.3 GPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

SD-07 Certificates

1.10 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G DOSystems Manual

3.1.7 G DOSystems Manual

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 60 PAGES

01 91 00.15 3.1.8 GMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.2 S DOFinal Commissioning Report

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 GNotification

02 82 00 SD-03 Product Data

1.3.10 GSafety Data Sheets (SDS) for All

Materials

3.1.1.1 GRespirators

1.2.2 GAmended Water

SD-07 Certificates

1.3.5 GEmployee Training

1.3.6 GNotifications

1.3.8 GRespiratory Protection Program

1.3.11 GAsbestos Hazard Abatement Plan

1.3.12 GTesting Laboratory

1.3.13 GLandfill Approval

1.3.13 GDelivery Tickets

1.3.13 GWaste Shipment Records

1.5.3 GContractor's License

1.5.4 GFederal, Puerto Rico or Local

Citations on Previous Projects

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 60 PAGES

02 82 00 3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.2.3 GWater Filtration Equipment

SD-11 Closeout Submittals

1.3.6 GPermits and Licenses

1.3.6 GNotifications

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GLicenses, Permits and

Notifications

1.5.5 GOccupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.1.1.4 GLead, Cadmium, Chromium

Compliance Plan

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 GRespirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 60 PAGES

02 83 00 1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

3.1.1.3 GLocal Exhaust Equipment

3.1.1.3 GPressure Differential Automatic

Recording Instrument

3.1.1.4 GPressure Differential Log

SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

1.5.3 GPressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 60 PAGES

03 30 00 1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.9Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.4 G DOJoint Sealants

2.4.3 G DOJoint Filler

2.1Formwork Materials

2.3.3.2 G DORecycled Aggregate Materials

2.3.1 G DOCementitious Materials

2.4.5Vapor Barrier

2.4.1Concrete Curing Materials

2.6 G DOReinforcement

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

1.8.1 G DOLocal/Regional Materials

2.2.2Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 60 PAGES

03 30 00 1.6.3.4Finishing Plan

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.13.2.3 GCompressive Strength Tests

3.13.2.5Unit Weight of Structural

Concrete

3.13.2.6Chloride Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3Silica Fume Manufacturer's

Representative

1.6.3.5VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 60 PAGES

03 30 00 1.6.3.6Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.4 G DOJoint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

2.7.7 GInsulation

SD-04 Samples

2.4.1.3 GAdmixtures for Masonry Mortar

2.7.2 GAnchors, Ties, and Bar

Positioners

2.7.3 GJoint Reinforcement

2.7.7 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 60 PAGES

04 20 00 3.2.4 GBracing Calculations

SD-06 Test Reports

2.2.2.4Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.3Prism Tests

3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.3Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.7.2Anchors, Ties, and Bar

Positioners

2.7.3Joint Reinforcement

2.7.7Insulation

2.7.7Insulation

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 60 PAGES

04 20 00 SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.2 SRecycled Content

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 GWood Products

1.4 GTreated Wood Products

2.4 GHardware and Accessories

SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 60 PAGES

07 05 23 SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.6 GAir Leakage Test Report

1.6.4 GDiagnostic Test Report

3.6.5 GDiagnostic Test Report

07 14 00 SD-03 Product Data

2.1 GFluid-Applied Membrane

2.2 GMembrane Primer

2.8 GElastomeric Sheet

2.10 GFlexible Foam-Backed

Elastomeric Sheet

3.3 GSolvent

3.4.1 GMoisture Meter

2.11 GProtection Board

2.7 GBond Breaker

SD-11 Closeout Submittals

1.6 GWarranty

3.6 GInformation Card

3.5 GInstructions To Government

Personnel

07 21 40 SD-03 Product Data

1.4.2 GProduct

1.4.4 GProduct

SD-06 Test Reports

1.4.4Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 60 PAGES

07 21 40 2.1Material

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.2 GInsulation

1.4 GCover Board

SD-06 Test Reports

1.7.1 GFlame Spread Rating

07 52 00 SD-02 Shop Drawings

1.4.8 GRoof Plan

1.4.8Field Inspection and Existing

Conditions Report

SD-03 Product Data

2.2 GModified Bitumen Sheets

2.1.1 SHeat Island Reduction

2.16 SEnergy Star Label for Top

Coating

2.4Asphalt

2.5 GCold-Applied Membrane

Adhesive

2.2 GFiberglass Felt

2.7 GPrimer

2.8 GModified Bitumen Roof Cement

2.11Pre-Manufactured Accessories

2.10 GFasteners And Plates

1.9 GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 60 PAGES

07 52 00 SD-05 Design Data

1.4.7 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3 GQualification of Torch Operator

1.4.5Qualification of Engineer of

Record

1.5.1Bill of Lading

1.4.7 GWind Uplift Resistance

1.4.6 GFire Resistance

SD-08 Manufacturer’s Instructions

3.3.6 GModified Bitumen Membrane

Application

3.3.7 GFlashing

3.2.3.1Temperature Limitations for

Asphalt

3.2.2.3Torches

3.3.3.3 GCold Adhesive Applied Modified

Bitumen Membrane

2.7Primer

2.10.1Fasteners

3.3.4Ventilating Base Sheets

3.3.11.2 GCoating Application

1.6 GCold Weather Installation

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 60 PAGES

07 52 00 1.9Warranty

3.9Information Card

3.8Instructions To

[Government][Contractor]

Personnel

07 53 23 SD-03 Product Data

2.1.1 GTPO Sheet

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3 GFire Resistance

SD-11 Closeout Submittals

1.8Warranty

3.10Information Card

3.9Instructions To Government

Personnel

07 54 19 SD-02 Shop Drawings

1.6 GDetail Drawings

1.6 GRoof Plan

SD-03 Product Data

3.3.2 GPVC Roofing Membrane

2.1.2 SEnergy Star Label for roof

membrane

2.1.3 SHeat Island Reduction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 60 PAGES

07 54 19 2.1.4Bonding Adhesive

1.5.5Flashing

3.3.2.2Flashing

2.1.7Membrane Fasteners and Plates

2.1.12Roof Insulation

2.1.8Protection Mat

2.1.9Pre-Manufactured Accessories

3.7.1Water Cutoffs

2.1.1Information Card

SD-05 Design Data

1.3.2 GWind Uplift Resistance

SD-07 Certificates

1.5.1Qualification of Manufacturer

1.5.2Qualifications of Applicator

1.5.4Qualification of Engineer of

Record

1.3.2Wind Uplift Resistance

1.3.1Fire Resistance

2.1.1Minimum Polymer Thickness

2.1.6Minimum Polymer Thickness

1.10 GSample

SD-08 Manufacturer’s Instructions

3.3 GApplication Method

2.1.6 GMembrane Flashing

3.4.2 GMembrane Flashing

3.3.5Perimeter Attachment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 60 PAGES

07 54 19 2.1.7.2Auxiliary Fasteners

2.1.8Protection Mat

2.1.9Pre-Manufactured Accessories

1.8 GCold Weather

SD-11 Closeout Submittals

1.10 GWarranty

2.1.1 GInformation Card

3.10 GInstructions to Government

Personnel

07 55 00 SD-02 Shop Drawings

1.2.1Roof Assembly

SD-07 Certificates

1.4.1Material and Equipment

1.4.2Energy Efficiency

1.4.3Qualifications

07 56 00 SD-02 Shop Drawings

1.4.2 GInstallation Drawings

SD-03 Product Data

2.1.1 GPrimer

2.1.3 GBase Coat

2.1.4 GTop Coat

2.1.2 GReinforcing Fabric

2.1.7 GSealant

SD-07 Certificates

1.4.1.1 GQualification of Manufacturer

1.4.1.2 GQualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 60 PAGES

07 56 00 SD-08 Manufacturer’s Instructions

3.3 GApplication

SD-11 Closeout Submittals

1.7 GWarranty

07 60 00 SD-02 Shop Drawings

2.2.1 G ROExposed Sheet Metal

3.1.13 G ROGutters

3.1.14 G RODownspouts

3.1.18 G ROExpansion Joints

2.2.1 G ROGravel Stops and fascia

3.1.9 G ROCounterflashing

2.2.7 G ROReglets

3.1.15 G ROScuppers

3.1.21 G ROCopings

3.1.16 G ROEave Flashing

2.1 SRecycled Content

SD-04 Samples

1.4.2 G ROFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

3.4 G ROQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 G ROCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1Firestopping System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 60 PAGES

07 84 00 SD-03 Product Data

2.2Firestopping Materials

SD-06 Test Reports

3.3Inspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.5 SIndoor Air Quality For Interior

Caulking

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.5 GFrames

2.5 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 60 PAGES

08 11 13 2.5 SRecycled Content for Steel Frame

Product

2.3Accessories

2.7Weatherstripping

SD-03 Product Data

2.1 GDoors

2.5 GFrames

2.3Accessories

2.7Weatherstripping

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-03 Product Data

1.5.1 GDoor and Frame Assembly

2.2.3 SRecycled Content of Aluminum

Material

SD-04 Samples

1.5.2 GFinish Samples

SD-05 Design Data

1.5.3 GDesign Analysis

1.2.1 GCalculations

1.2.3 GAir Infiltration

1.2.4 GWater Penetration

1.2.5 GNFRC Project Label Certificates

for Fenestration

SD-08 Manufacturer’s Instructions

1.5.1 GDoor and Frame Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 60 PAGES

08 11 16 1.5.4 GAdjustments, Cleaning, and

Maintenance

1.2.5 GNFRC Project Label Certificates

for Fenestration

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2Accessories

SD-07 Certificates

1.3.1Certificates of Grade

SD-11 Closeout Submittals

1.5Warranty

08 36 13 SD-02 Shop Drawings

2.2 GDoors

SD-03 Product Data

2.2 GDoors

2.6 GElectric operators

SD-08 Manufacturer’s Instructions

2.2Doors

SD-10 Operation and Maintenance

Data

2.2 GDoors

08 51 13 SD-02 Shop Drawings

2.1 G ROWindows

1.9Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 60 PAGES

08 51 13 SD-03 Product Data

2.1 G ROWindows

2.1 SRecycled Content of Aluminum

Windows

1.10.4 SEnergy Star Label For Residential

Aluminum Window Products

2.2.6.1Hardware

1.10 G ROWindow Performance

2.2.8Screens

1.10.4 G ROThermal Performance

SD-04 Samples

1.4.2.1Finish Sample

SD-06 Test Reports

1.4.4Minimum Condensation

Resistance Factor

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.5 GHardware Schedule

2.2.7 GKeying System

SD-03 Product Data

2.2 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 60 PAGES

08 71 00 SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

1.6.1 GInsulating Glass

1.3 GGlazing Accessories

SD-04 Samples

1.6.1 GInsulating Glass

SD-07 Certificates

1.6.1 GInsulating Glass

SD-08 Manufacturer’s Instructions

2.3 GSetting and Sealing Materials

3.2 GGlass Setting

09 22 00 SD-03 Product Data

2.1 SRecycled Content for Metal

Support Systems

SD-04 Samples

2.1 GSamples

09 23 00 SD-03 Product Data

2.2Gypsum Base Coat Plaster

2.3Gypsum Finish Coat Plaster

SD-04 Samples

1.3.1 GSample Panel

1.5 GGypsum Plaster Full Size Sample

SD-08 Manufacturer’s Instructions

2.7Ready-Mix Gypsum Plaster

09 24 23 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 60 PAGES

09 24 23 3.4Lath

SD-03 Product Data

3.7Proportions and Mixing

2.1 SRecycled percentage of fly ash in

Portland cement

2.6 SRecycled Content for steel

framing

2.7 SRecycled Content for metal lath

SD-04 Samples

2.2Colored Stucco Finish Coat

1.3 GSample Panel

09 24 24 SD-04 Samples

1.3 GMockup

09 29 00 SD-03 Product Data

2.1.4 GCementitious Backer Units

2.1.3 GGlass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.10 GAccessories

2.1.1Gypsum Board

2.1.5 SVOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

2.1.7 SIndoor Air Quality for Non-aerosol

Adhesives

2.1.7 SIndoor Air Quality for Aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 60 PAGES

09 30 10 SD-03 Product Data

2.1.1 G ROPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1 G ROTile

2.3Mortar, Grout, and Adhesive

SD-04 Samples

2.1 G ROTile

2.1 G ROTransition Strips

2.5 G ROTransition Strips

SD-07 Certificates

2.3 SIndoor Air Quality for Adhesives

2.3.3 SIndoor Air Quality for Sealants

09 90 00 SD-03 Product Data

2.1Coating

SD-04 Samples

1.9Color

09 97 23 SD-03 Product Data

2.3Base Coat

2.5Reinforcing Fabric

2.6Finish Coat

2.9Joint Sealant

1.8Warranty

SD-04 Samples

1.5.1Sample Boards

1.5.2Mock-up Installation of DAFS

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 60 PAGES

09 97 23 SD-06 Test Reports

1.2.1Abrasion Resistance

1.2.1Accelerated Weathering

SD-07 Certificates

1.4.1Qualifications of DAFS

Manufacturer

1.4.2Qualification of DAFS Installer

SD-10 Operation and Maintenance

Data

1.8DAFS

10 71 13.13 SD-02 Shop Drawings

2.1.1Hurricane Fabric

SD-03 Product Data

2.1.1Hurricane Fabric

SD-10 Operation and Maintenance

Data

2.1.1Hurricane Fabric

11 31 13 SD-03 Product Data

2.1Kitchen Equipment

2.1.2 SEnergy Star Label for Refrigerator

2.1.8 SEnergy Star Label for Dishwasher

SD-08 Manufacturer’s Instructions

2.1Kitchen Equipment

2.1.5Exhaust Hood

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 60 PAGES

11 31 13 2.1 GKitchen Equipment

SD-11 Closeout Submittals

3.3Manufacturer's Warranty

3.4Contractor's Warranty for

Installation

11 68 13 SD-02 Shop Drawings

2.2.1Configuration

1.5.6Shop Drawings

3.2.8Fall Height

3.1.1Finished Grade and Underground

Utilities

SD-03 Product Data

2.2Equipment

1.3.4Equipment Identification

1.6Delivery, Storage and Handling

1.5.1Manufacturer Qualification

1.8Spare Parts

2.1Materials

2.1.1.1 SRecycled content for steel

components

2.1.1.1 SRecycled content for stainless

steel components

2.1.1.2 SRecycled content for aluminum

components

2.1.3.4 SRecycled Content for plastic

molded as deck material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO…

This is the start of the file's text. The full file is on GovTribe.