W912EP20R0039 Amendment 0008.pdf
PDF 15 MB Posted
- Solicitation number
- W912EP20R0039
About this file
This solicitation seeks proposals for the Fort Buchanan Family Housing Replacement project in Fort Buchanan, Puerto Rico. The scope of work is to demolish 27 existing family housing units, construct 26 new family housing units and supporting facilities including site work and utility systems to conform with Army Family Housing standards. Proposals are due by November 6, 2020. The project consists of a base and one option with an anticipated period of performance of 814 calendar days from notice to proceed. The magnitude of construction is estimated between $10-25 million under NAICS code 236115 with a size standard of $39.5 million. An optional pre-proposal teleconference will be held on October 27, 2020. Interested parties must register as vendors on beta.SAM.gov in order to receive any amendments to the solicitation which will be issued and posted electronically at that site. Registration in the System for Award Management is also required to be eligible for award.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-8 4
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
X 9B. DATED (SEE ITEM 11)
7-October-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION
NO. W912EP20R0039
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
W912EP20R0039 FORT BUCHANAN FAMILY HOUSING REPLACEMENT FORT BUCHANAN , PUERTO RICO
A. See Continuation Sheet for Amendment details.
B. The proposal due date remains unchanged.
C. All other Terms and Conditions remain unchanged.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
3. EFFECTIVE DATE
27-Nov-2020
X
W912EP20R0039
SF 30 CONTINUATION SHEET
Fort Buchanan Family Housing Replacement Fort Buchanan, Guaynabo, Puerto Rico
W912EP20R0039 Amendment 0008
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Volume 1 DELETE Section 00010A and REPLACE with the attached Section 00010A.
Volumes 2 and 3 DELETE Table of Contents and REPLACE with the attached Table of Contents.
DELETE Submittal Register and REPLACE with the attached Submittal Register.
DELETE Section 01 45 35 and REPLACE with the attached Section 01 45 35.
DELETE Section 07 22 00 and REPLACE with the attached Section 07 22 00.
ADD Section 07 53 23.
DELETE Section 07 56 00.
DELETE Section 08 36 13 and REPLACE with the attached Section 08 36 13.
ADD Section 09 24 24.
2. DRAWINGS:
DELETE Sheet A-111A and REPLACE with the attached Sheet A-111A.
DELETE Sheet A-111B and REPLACE with the attached Sheet A-111B.
DELETE Sheet A-111C and REPLACE with the attached Sheet A-111C.
DELETE Sheet A-111C.2 and REPLACE with the attached Sheet A-111C.2.
DELETE Sheet A-301A and REPLACE with the attached Sheet A-301A.
DELETE Sheet A-301B and REPLACE with the attached Sheet A-301B.
DELETE Sheet A-301C and REPLACE with the attached Sheet A-301C.
DELETE Sheet A-501 and REPLACE with the attached Sheet A-501.
DELETE Sheet CS501 and REPLACE with the attached Sheet CS501.
DELETE Sheet ES503 and REPLACE with the attached Sheet ES503.
DELETE Sheet L-102 and REPLACE with the attached Sheet L-102.
DELETE Sheet L-109 and REPLACE with the attached Sheet L-109.
DELETE Sheet S-002 and REPLACE with the attached Sheet S-002.
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
FORT BUCHANAN FAMILY HOUSING REPLACEMENT
FORT BUCHANAN, PUERTO RICO
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 DEMOLITION JOB $_______________
0002 LAND DEVELOPMENT JOB $_______________
0003 HOUSING JOB $_______________
0004 RECREATIONAL PARK JOB $_______________
SUBTOTAL BASE (LINE ITEMS 0001 THROUGH 0004) $_______________
0005 MUNICIPAL TAXES JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0005) $_______________
0006 BID OPTION 1 (House 14 Model A.A) JOB $_______________
0007 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 1 (LINE ITEMS 0006 THROUGH 0007) $_______________
0008 BID OPTION 2 (House 15 Model A.A) JOB $_______________
0009 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 2 (LINE ITEMS 0008 THROUGH 0009) $_______________
0010 BID OPTION 3 (House 16 Model A.A) JOB $_______________
0011 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 3 (LINE ITEMS 0010 THROUGH 0011) $_______________
0012 BID OPTION 4 (House 17 Model A.A) JOB $_______________
0013 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 4 (LINE ITEMS 0012 THROUGH 0013) $_______________
0014 BID OPTION 5 (North Buffer Trees) JOB $_______________
0015 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 5 (LINE ITEMS 0014 THROUGH 0015) $_______________
BID OPTION 6 (PARK TREES, SHRUBS AND GROUND
COVER) JOB $_______________
0017 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 6 (LINE ITEMS 0016 THROUGH 0017) $_______________
0018 BID OPTION 7 - APPLIANCES (KITCHEN, LAUNDRY) JOB $_______________
0019 MUNICIPAL TAXES JOB $_______________
W912EP20R0039 00010A-1 Amendment 0008
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
FORT BUCHANAN FAMILY HOUSING REPLACEMENT
FORT BUCHANAN, PUERTO RICO
TOTAL BID OPTION 7 (LINE ITEMS 0018 THROUGH 0019) $_______________
TOTAL OPTIONS (LINE ITEMS 0006 THROUGH 0019) $_______________
TOTAL BASE PLUS OPTIONS (LINE ITEMS 0001 THROUGH 0019) $_______________
NOTES
(1) OFFER MUST PRICE ALL LINE ITEMS.
(2) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING JOB AS THE UNIT.
(8) LINE ITEMS 0006 THROUGH 0013 INCLUDE ALL REQUIRED WORK TO DELIVER A COMPLETE AND USABLE FACILITY
INCLUDING ASSOCIATED UTILITIES NOT INCLUDED IN LINE ITEM 2.
(NTP).
(10) PRICE FOR BID OPTION 7 SHALL BE GOOD FOR 365 CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
(7) LINE ITEM 0002 EXCLUDES UTILITY INSTALLATION FOR BID OPTIONS 1 THROUGH 4.
(3) THE JOB PRICE AND PAYMENT MADE FOR EACH ITEM LISTED SHALL CONSTITUTE FULL COMPENSATION FOR FURNISHING ALL PLANT, LABOR, MATERIALS AND EQUIPMENT, AND PERFORMING ANY ASSOCIATED CONTRACTOR QUALITY CONTROL, ENVIRONMENTAL PROTECTION, MEETING SAFETY REQUIREMENTS, TESTS AND REPORTS, AND FOR PERFORMING ALL WORK REQUIRED FOR WHICH SEPARATE PAYMENT IS NOT OTHERWISE PROVIDED. ALL COSTS FOR ITEMS OF WORK, WHICH ARE NOT SPECIFICALLY MENTIONED TO BE INCLUDED IN A PARTICULAR JOB OR UNIT PRICE PAYMENT ITEM, SHALL BE INCLUDED IN THE LISTED JOB ITEM AND MUST CLOSELY ASSOCIATED WITH THE
WORK INVOLVED.
(4) PROGRESS PAYMENTS FOR JOB CLINS WILL BE MADE IN ACCORDANCE WITH THE PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS CLAUSE OF SECTION 00700 CONTRACT CLAUSES. SUBMIT A LIST OF PAY ACTIVITIES, (SCHEDULE OF VALUES) TO BREAKDOWN BID FOR EACH JOB CLIN. SUBMIT THE SCHEDULE OF VALUES FOR GOVERNMENT APPROVAL WITH THE BASELINE SCHEDULE SUBMITTAL (SEE SECTION 01 32 01 PROJECT SCHEDULE).
AN UNBALANCED SCHEDULE OF VALUES AND PAY ACTIVITY SCHEDULE WILL BE RETURNED FOR REVISION.
(5) THE CONTRACT PRICE WILL BE ADJUSTED IF NECESSARY FOR THE AMOUNT OF CONSTRUCTION TAXES PAID. NO MARK-UPS WILL BE ALLOWED IN THIS LINE ITEM. THE CONTRACTOR WILL BE PAID ON THE BASIS OF PROOF OF
PAYMENT FROM THE APPROPRIATE COMMONWEALTH OF PUERTO RICO MUNICIPAL AUTHORITIES.
(6) THE AMOUNTS INCLUDED FOR THE CLINS RELATED TO MUNICIPAL TAXES WILL NOT BE CONSIDERED FOR PRICE
EVALUATION OF THE PROPOSALS.
W912EP20R0039 00010A-2 Amendment 0008
Fort Buchanan Family Housing Replacement Fort Buchanan AMENDMENT 0008 Guaynabo, Puerto Rico
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 31 32 GEOTECHNICAL DATA
00 33 50 WEATHER AND WATER STAGE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS AND SPECIAL PROVISIONS
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 78 02 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 60 00 CELLULAR PVC FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 40 FOAMED-IN-PLACE MASONRY WALL INSULATION
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 23 MEMBRANE ROOFING
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 55 00 PROTECTED MEMBRANE ROOFING
07 56 00 FLUID-APPLIED ROOFING
PROJECT TABLE OF CONTENTS Page 1
W912EP20R0039 AMENDMENT 0008
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 GYPSUM PLASTERING
09 24 23 CEMENT STUCCO
09 24 24 INTERIOR CEMENT PLASTER
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 90 00 PAINTS AND COATINGS
09 97 23 DIRECT APPLIED FINISH SYSTEM
DI VI SI ON 10 - SPECI ALTI ES
10 71 13.13 HURRICANE FABRIC
DI VI SI ON 11 - EQUI PMENT
11 31 13 ELECTRIC KITCHEN EQUIPMENT
11 68 13 PLAYGROUND EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
12 93 00 SITE FURNISHINGS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 81 29 VARIABLE REFRIGERANT FLOW SYSTEM OUTDOOR UNIT
PROJECT TABLE OF CONTENTS Page 2
23 81 30 VARIABLE REFRIGERANT FLOW INDOOR SYSTEM
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 21 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 36 23.00 20 MANUAL TRANSFER SWITCHES
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 12 33.00 30 WATER METERS
33 30 00 SANITARY SEWERAGE
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 60 PAGES
Fort Buchanan Family Housing Replacement Fort Buchanan
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 G ROList of Contact Personnel
1.11 G ROLabor, Equipment, and Material
Report
1.11Daily Equipment Report
1.13OPSEC SOP/Plan
1.13Level I OPSEC Training
1.13 G ROList Of Verified/Eligible
Candidates
1.23.1 G ROHurricane and Severe Storm Plan
1.23.1 G DOAccident Prevention Plan
SD-07 Certificates
1.13AT Level I Awareness Training
1.16 G ROInsurance
1.14Progress Photographs
SD-11 Closeout Submittals
1.6 G ROACM Certification
01 30 00 SD-01 Preconstruction Submittals
1.6.3Draft Joint Risk Register
1.6.4List of Subcontractors
1.6.5Certificate of Insurance
SD-07 Certificates
1.7.1.2 G ROPartnering Meeting(s) Written
Synopsis
3.3Signature Authority
3.4Drug-Free Work Place Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 60 PAGES
01 32 01 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
SD-07 Certificates
3.6.2 G ROPeriodic Schedule Updates
01 33 00 SD-01 Preconstruction Submittals
1.9 G DOSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary LEED for Homes
Checklist
1.4.1Sustainability Action Plan
1.5.3.1Preliminary Sustainability eNotebook
SD-11 Closeout Submittals
1.5.3.1 GFinal LEED for Homes Checklist
1.5.3.1Final Sustainability eNotebook
1.5.3.1Amended Final Sustainability eNotebook
1.5.3.1Amended Final LEED Checklist
3.2Third Party Certification
Certificate, Assessment, or
Validation
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
1.15 G DOAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 60 PAGES
01 35 26 1.8 G DOActivity Hazard Analysis (AHA)
1.6.1.1 G DOSite Safety and Health Officer
Qualifications (SSHO)
1.7.2.3 G DOCritical Lift Plan
1.7.2.2 G DOStandard Lift Plan
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12.1Mishap Notification
1.12.2 G DOAccident Reports
1.12.3LHE Inspection Reports
1.14.5Regulatory Citations and
Violations
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Crane Certificate of Compliance
01 45 04 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-07 Certificates
3.7.2 G ROLaboratory Qualifications
3.2.2Letter of Authority
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 60 PAGES
01 45 35 3.1.1 GProject Manual
3.1.1Written NDT Practices
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
1.5 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.1 GInterim Report
3.1.2 GInterim Report
3.1.1 GComprehensive Final Report
3.1.2 GComprehensive Final Report
01 50 02 SD-01 Preconstruction Submittals
1.4.1 G ROMobilization/Demobilization Plan
1.4.3 G RODocumentation of Existing
Conditions and Post Construction
Restoration
1.4.2 G ROSite Plan
SD-02 Shop Drawings
2.1Contractor's Temporary Facilities
3.5Contractor's Temporary Facilities
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 60 PAGES
01 50 02 3.2.6Temporary Electric Drawings
SD-06 Test Reports
2.7 G ROBackflow Preventer Tests
SD-07 Certificates
1.5 G ROBackflow Tester Certification
01 52 10 SD-02 Shop Drawings
2.1Contracting Officer's Field Office
01 55 26 SD-01 Preconstruction Submittals
3.3 G ROTraffic Control
01 57 20 SD-01 Preconstruction Submittals
G DOEnvironmental Protection Plan
SD-07 Certificates
G ROPuerto Rico Boa Monitoring
Certificate
G DOEnvironmental/Pollution Control
SD-11 Closeout Submittals
G DOInvasive And Nuisance Species
Report
G ROLogs/Summary Of Puerto Rican
Boa Monitoring
01 78 02 SD-03 Product Data
1.3.9 G ROAs-Built Record of Equipment
and Materials
1.4.1 G ROWarranty Management Plan
1.7 G ROFinal Cleaning
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 60 PAGES
01 78 02 1.4.5 G ROEquipment Warranty Identification
Tags
SD-05 Design Data
1.8.1Equipment-In-Place List
1.8.1Maintenance And Parts Data
SD-07 Certificates
1.4.2.1Warranty Of Construction
SD-11 Closeout Submittals
3.1.1 G ROInterim DD FORM 1354
3.1.2 G ROChecklist for DD FORM 1354
1.3.4Preliminary (Working) As-Built
Drawings
1.3.5 G ROFinal As-Built Drawings
1.3.8 G ROFinal As-Built Drawings
1.3.1.2 G ROCad Working As-Built Drawings
01 78 23 SD-10 Operation and Maintenance
Data
1.4 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3Training Outline
3.1.2Training Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 60 PAGES
01 91 00.15 1.7.1 GLead Commissioning Specialist
1.7.2 GTechnical Commissioning
Specialists
1.7 GCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 GDesign Review Report
3.1.2.1 GInterim Construction Phase
Commissioning Plan
3.1.2.2 GFinal Construction Phase
Commissioning Plan
3.1.2.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.5.2 G DOBuilding Envelope Inspection
Checklists
3.1.5.3 GPre-Functional Checklists
1.9Issues Log
3.2 G DOCommissioning Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 G DOSystems Manual
3.1.7 G DOSystems Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 60 PAGES
01 91 00.15 3.1.8 GMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 82 00 SD-03 Product Data
1.3.10 GSafety Data Sheets (SDS) for All
Materials
3.1.1.1 GRespirators
1.2.2 GAmended Water
SD-07 Certificates
1.3.5 GEmployee Training
1.3.6 GNotifications
1.3.8 GRespiratory Protection Program
1.3.11 GAsbestos Hazard Abatement Plan
1.3.12 GTesting Laboratory
1.3.13 GLandfill Approval
1.3.13 GDelivery Tickets
1.3.13 GWaste Shipment Records
1.5.3 GContractor's License
1.5.4 GFederal, Puerto Rico or Local
Citations on Previous Projects
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 60 PAGES
02 82 00 3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.2.3 GWater Filtration Equipment
SD-11 Closeout Submittals
1.3.6 GPermits and Licenses
1.3.6 GNotifications
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.1.1.4 GLead, Cadmium, Chromium
Compliance Plan
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 60 PAGES
02 83 00 1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
3.1.1.3 GLocal Exhaust Equipment
3.1.1.3 GPressure Differential Automatic
Recording Instrument
3.1.1.4 GPressure Differential Log
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 60 PAGES
03 30 00 1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.4.4 G DOJoint Sealants
2.4.3 G DOJoint Filler
2.1Formwork Materials
2.3.3.2 G DORecycled Aggregate Materials
2.3.1 G DOCementitious Materials
2.4.5Vapor Barrier
2.4.1Concrete Curing Materials
2.6 G DOReinforcement
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
1.8.1 G DOLocal/Regional Materials
2.2.2Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 60 PAGES
03 30 00 1.6.3.4Finishing Plan
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
3.13.2.6Chloride Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3Silica Fume Manufacturer's
Representative
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 60 PAGES
03 30 00 1.6.3.6Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.4 G DOJoint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
2.7.7 GInsulation
SD-04 Samples
2.4.1.3 GAdmixtures for Masonry Mortar
2.7.2 GAnchors, Ties, and Bar
Positioners
2.7.3 GJoint Reinforcement
2.7.7 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.2.4Fire-Rated Concrete Masonry
Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 60 PAGES
04 20 00 3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.4Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
3.6.1.4Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.2.3Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.7.2Anchors, Ties, and Bar
Positioners
2.7.3Joint Reinforcement
2.7.7Insulation
2.7.7Insulation
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 60 PAGES
04 20 00 SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.2 SRecycled Content
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
1.4 GTreated Wood Products
2.4 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 60 PAGES
07 05 23 SD-06 Test Reports
3.5 GPressure Test Procedures
1.6.4 GAir Leakage Test Report
3.5.6 GAir Leakage Test Report
1.6.4 GDiagnostic Test Report
3.6.5 GDiagnostic Test Report
07 14 00 SD-03 Product Data
2.1 GFluid-Applied Membrane
2.2 GMembrane Primer
2.8 GElastomeric Sheet
2.10 GFlexible Foam-Backed
Elastomeric Sheet
3.3 GSolvent
3.4.1 GMoisture Meter
2.11 GProtection Board
2.7 GBond Breaker
SD-11 Closeout Submittals
1.6 GWarranty
3.6 GInformation Card
3.5 GInstructions To Government
Personnel
07 21 40 SD-03 Product Data
1.4.2 GProduct
1.4.4 GProduct
SD-06 Test Reports
1.4.4Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 60 PAGES
07 21 40 2.1Material
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
SD-03 Product Data
2.2 GInsulation
1.4 GCover Board
SD-06 Test Reports
1.7.1 GFlame Spread Rating
07 52 00 SD-02 Shop Drawings
1.4.8 GRoof Plan
1.4.8Field Inspection and Existing
Conditions Report
SD-03 Product Data
2.2 GModified Bitumen Sheets
2.1.1 SHeat Island Reduction
2.16 SEnergy Star Label for Top
Coating
2.4Asphalt
2.5 GCold-Applied Membrane
Adhesive
2.2 GFiberglass Felt
2.7 GPrimer
2.8 GModified Bitumen Roof Cement
2.11Pre-Manufactured Accessories
2.10 GFasteners And Plates
1.9 GWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 60 PAGES
07 52 00 SD-05 Design Data
1.4.7 GWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3 GQualification of Torch Operator
1.4.5Qualification of Engineer of
Record
1.5.1Bill of Lading
1.4.7 GWind Uplift Resistance
1.4.6 GFire Resistance
SD-08 Manufacturer’s Instructions
3.3.6 GModified Bitumen Membrane
Application
3.3.7 GFlashing
3.2.3.1Temperature Limitations for
Asphalt
3.2.2.3Torches
3.3.3.3 GCold Adhesive Applied Modified
Bitumen Membrane
2.7Primer
2.10.1Fasteners
3.3.4Ventilating Base Sheets
3.3.11.2 GCoating Application
1.6 GCold Weather Installation
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 60 PAGES
07 52 00 1.9Warranty
3.9Information Card
3.8Instructions To
[Government][Contractor]
Personnel
07 53 23 SD-03 Product Data
2.1.1 GTPO Sheet
SD-05 Design Data
1.4.4 GWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3 GFire Resistance
SD-11 Closeout Submittals
1.8Warranty
3.10Information Card
3.9Instructions To Government
Personnel
07 54 19 SD-02 Shop Drawings
1.6 GDetail Drawings
1.6 GRoof Plan
SD-03 Product Data
3.3.2 GPVC Roofing Membrane
2.1.2 SEnergy Star Label for roof
membrane
2.1.3 SHeat Island Reduction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 60 PAGES
07 54 19 2.1.4Bonding Adhesive
1.5.5Flashing
3.3.2.2Flashing
2.1.7Membrane Fasteners and Plates
2.1.12Roof Insulation
2.1.8Protection Mat
2.1.9Pre-Manufactured Accessories
3.7.1Water Cutoffs
2.1.1Information Card
SD-05 Design Data
1.3.2 GWind Uplift Resistance
SD-07 Certificates
1.5.1Qualification of Manufacturer
1.5.2Qualifications of Applicator
1.5.4Qualification of Engineer of
Record
1.3.2Wind Uplift Resistance
1.3.1Fire Resistance
2.1.1Minimum Polymer Thickness
2.1.6Minimum Polymer Thickness
1.10 GSample
SD-08 Manufacturer’s Instructions
3.3 GApplication Method
2.1.6 GMembrane Flashing
3.4.2 GMembrane Flashing
3.3.5Perimeter Attachment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 60 PAGES
07 54 19 2.1.7.2Auxiliary Fasteners
2.1.8Protection Mat
2.1.9Pre-Manufactured Accessories
1.8 GCold Weather
SD-11 Closeout Submittals
1.10 GWarranty
2.1.1 GInformation Card
3.10 GInstructions to Government
Personnel
07 55 00 SD-02 Shop Drawings
1.2.1Roof Assembly
SD-07 Certificates
1.4.1Material and Equipment
1.4.2Energy Efficiency
1.4.3Qualifications
07 56 00 SD-02 Shop Drawings
1.4.2 GInstallation Drawings
SD-03 Product Data
2.1.1 GPrimer
2.1.3 GBase Coat
2.1.4 GTop Coat
2.1.2 GReinforcing Fabric
2.1.7 GSealant
SD-07 Certificates
1.4.1.1 GQualification of Manufacturer
1.4.1.2 GQualification of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 60 PAGES
07 56 00 SD-08 Manufacturer’s Instructions
3.3 GApplication
SD-11 Closeout Submittals
1.7 GWarranty
07 60 00 SD-02 Shop Drawings
2.2.1 G ROExposed Sheet Metal
3.1.13 G ROGutters
3.1.14 G RODownspouts
3.1.18 G ROExpansion Joints
2.2.1 G ROGravel Stops and fascia
3.1.9 G ROCounterflashing
2.2.7 G ROReglets
3.1.15 G ROScuppers
3.1.21 G ROCopings
3.1.16 G ROEave Flashing
2.1 SRecycled Content
SD-04 Samples
1.4.2 G ROFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 G ROInstructions for Installation
3.4 G ROQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G ROCleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 60 PAGES
07 84 00 SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3Inspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.5 GFrames
2.5 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 60 PAGES
08 11 13 2.5 SRecycled Content for Steel Frame
Product
2.3Accessories
2.7Weatherstripping
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
2.7Weatherstripping
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
2.2.3 SRecycled Content of Aluminum
Material
SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data
1.5.3 GDesign Analysis
1.2.1 GCalculations
1.2.3 GAir Infiltration
1.2.4 GWater Penetration
1.2.5 GNFRC Project Label Certificates
for Fenestration
SD-08 Manufacturer’s Instructions
1.5.1 GDoor and Frame Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 60 PAGES
08 11 16 1.5.4 GAdjustments, Cleaning, and
Maintenance
1.2.5 GNFRC Project Label Certificates
for Fenestration
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
SD-07 Certificates
1.3.1Certificates of Grade
SD-11 Closeout Submittals
1.5Warranty
08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.6 GElectric operators
SD-08 Manufacturer’s Instructions
2.2Doors
SD-10 Operation and Maintenance
Data
2.2 GDoors
08 51 13 SD-02 Shop Drawings
2.1 G ROWindows
1.9Fabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 60 PAGES
08 51 13 SD-03 Product Data
2.1 G ROWindows
2.1 SRecycled Content of Aluminum
Windows
1.10.4 SEnergy Star Label For Residential
Aluminum Window Products
2.2.6.1Hardware
1.10 G ROWindow Performance
2.2.8Screens
1.10.4 G ROThermal Performance
SD-04 Samples
1.4.2.1Finish Sample
SD-06 Test Reports
1.4.4Minimum Condensation
Resistance Factor
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.5 GHardware Schedule
2.2.7 GKeying System
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 60 PAGES
08 71 00 SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
1.6.1 GInsulating Glass
1.3 GGlazing Accessories
SD-04 Samples
1.6.1 GInsulating Glass
SD-07 Certificates
1.6.1 GInsulating Glass
SD-08 Manufacturer’s Instructions
2.3 GSetting and Sealing Materials
3.2 GGlass Setting
09 22 00 SD-03 Product Data
2.1 SRecycled Content for Metal
Support Systems
SD-04 Samples
2.1 GSamples
09 23 00 SD-03 Product Data
2.2Gypsum Base Coat Plaster
2.3Gypsum Finish Coat Plaster
SD-04 Samples
1.3.1 GSample Panel
1.5 GGypsum Plaster Full Size Sample
SD-08 Manufacturer’s Instructions
2.7Ready-Mix Gypsum Plaster
09 24 23 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 60 PAGES
09 24 23 3.4Lath
SD-03 Product Data
3.7Proportions and Mixing
2.1 SRecycled percentage of fly ash in
Portland cement
2.6 SRecycled Content for steel
framing
2.7 SRecycled Content for metal lath
SD-04 Samples
2.2Colored Stucco Finish Coat
1.3 GSample Panel
09 24 24 SD-04 Samples
1.3 GMockup
09 29 00 SD-03 Product Data
2.1.4 GCementitious Backer Units
2.1.3 GGlass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.10 GAccessories
2.1.1Gypsum Board
2.1.5 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.7 SIndoor Air Quality for Non-aerosol
Adhesives
2.1.7 SIndoor Air Quality for Aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 60 PAGES
09 30 10 SD-03 Product Data
2.1.1 G ROPorcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.1 G ROTile
2.3Mortar, Grout, and Adhesive
SD-04 Samples
2.1 G ROTile
2.1 G ROTransition Strips
2.5 G ROTransition Strips
SD-07 Certificates
2.3 SIndoor Air Quality for Adhesives
2.3.3 SIndoor Air Quality for Sealants
09 90 00 SD-03 Product Data
2.1Coating
SD-04 Samples
1.9Color
09 97 23 SD-03 Product Data
2.3Base Coat
2.5Reinforcing Fabric
2.6Finish Coat
2.9Joint Sealant
1.8Warranty
SD-04 Samples
1.5.1Sample Boards
1.5.2Mock-up Installation of DAFS
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 60 PAGES
09 97 23 SD-06 Test Reports
1.2.1Abrasion Resistance
1.2.1Accelerated Weathering
SD-07 Certificates
1.4.1Qualifications of DAFS
Manufacturer
1.4.2Qualification of DAFS Installer
SD-10 Operation and Maintenance
Data
1.8DAFS
10 71 13.13 SD-02 Shop Drawings
2.1.1Hurricane Fabric
SD-03 Product Data
2.1.1Hurricane Fabric
SD-10 Operation and Maintenance
Data
2.1.1Hurricane Fabric
11 31 13 SD-03 Product Data
2.1Kitchen Equipment
2.1.2 SEnergy Star Label for Refrigerator
2.1.8 SEnergy Star Label for Dishwasher
SD-08 Manufacturer’s Instructions
2.1Kitchen Equipment
2.1.5Exhaust Hood
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 60 PAGES
11 31 13 2.1 GKitchen Equipment
SD-11 Closeout Submittals
3.3Manufacturer's Warranty
3.4Contractor's Warranty for
Installation
11 68 13 SD-02 Shop Drawings
2.2.1Configuration
1.5.6Shop Drawings
3.2.8Fall Height
3.1.1Finished Grade and Underground
Utilities
SD-03 Product Data
2.2Equipment
1.3.4Equipment Identification
1.6Delivery, Storage and Handling
1.5.1Manufacturer Qualification
1.8Spare Parts
2.1Materials
2.1.1.1 SRecycled content for steel
components
2.1.1.1 SRecycled content for stainless
steel components
2.1.1.2 SRecycled content for aluminum
components
2.1.3.4 SRecycled Content for plastic
molded as deck material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .