W912EP20R0039-Amendment 0003.pdf
PDF 13 MB Posted
- Solicitation number
- W912EP20R0039
About this file
This document provides details on a federal contract solicitation for family housing replacement at Fort Buchanan in Puerto Rico. The U.S. Army Corps of Engineers is soliciting proposals to demolish 27 existing family housing units, construct 26 new units, and install supporting site utilities and infrastructure. Interested vendors must register on SAM.gov to receive amendments and be eligible for award. A pre-proposal teleconference will be held on October 27, 2020, and initial proposals are due November 6, 2020. The project value is estimated between $10-25 million. The NAICS code is 236115 for new single-family housing construction, with a size standard of $39.5 million. The period of performance is anticipated to be 814 calendar days from notice to proceed.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-8 4
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
X 9B. DATED (SEE ITEM 11)
7-October-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION
NO. W912EP20R0039
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
W912EP20R0039 FORT BUCHANAN FAMILY HOUSING REPLACEMENT FORT BUCHANAN , PUERTO RICO
A. See Continuation Sheet for Amendment details.
B. The proposal due date has changed from 12 November 2020 2:00 pm to 16 November 2020 10:00 am.
C. Bidder Inquiry submittal deadline has changed from 1 November 2020 to 9 November 2020.
D. All other Terms and Conditions remain unchanged.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
3. EFFECTIVE DATE
05-Nov-2020
W912EP20R0039
X
Amendment 0003
SF 30 CONTINUATION SHEET
Fort Buchanan Family Housing Replacement Fort Buchanan, Guaynabo, Puerto Rico
W912EP20R0039 Amendment 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
DELETE SF 1442 and REPLACED with the attached updated SF 1442.
DELETE Section 00010A and REPLACED with the attached updated Section 00010A.
DELETE LEED Project Checklist in Section 01 33 29 Attachment and REPLACE with the attached LEED Project Checklist in Section 01 33 29 Attachment.
DELETE Section 31 31 16.19.13 ADD attached Section 31 31 16.13
2. DRAWINGS:
DELETE Sheet A-003 and REPLACE with the attached Sheet A-003.
DELETE Sheet A-004 and REPLACE with the attached Sheet A-004.
DELETE Sheet A-102B and REPLACE with the attached Sheet A-102B.
DELETE Sheet A-301A and REPLACE with the attached Sheet A-301A.
DELETE Sheet A-302B and REPLACE with the attached Sheet A-302B.
DELETE Sheet A-303C and REPLACE with the attached Sheet A-303C.
DELETE Sheet A-321A and REPLACE with the attached Sheet A-321A.
DELETE Sheet A-402B and REPLACE with the attached Sheet A-402B.
DELETE Sheet A-402C and REPLACE with the attached Sheet A-402C.
DELETE Sheet A-501 and REPLACE with the attached Sheet A-501.
DELETE Sheet A-601A and REPLACE with the attached Sheet A-601A.
DELETE Sheet A-601B and REPLACE with the attached Sheet A-601B.
DELETE Sheet A-601C and REPLACE with the attached Sheet A-601C.
DELETE Sheet A-602 and REPLACE with the attached Sheet A-602.
DELETE Sheet C-003 and REPLACE with the attached Sheet C-003.
DELETE Sheet C-004 and REPLACE with the attached Sheet C-004.
DELETE Sheet CS501 and REPLACE with the attached Sheet CS501.
DELETE Sheet E-601 and REPLACE with the attached Sheet E-601.
DELETE Sheet ES101 and REPLACE with the attached Sheet ES101.
DELETE Sheet ES102 and REPLACE with the attached Sheet ES102.
DELETE Sheet ES103 and REPLACE with the attached Sheet ES103.
DELETE Sheet ES104 and REPLACE with the attached Sheet ES104.
DELETE Sheet ES601 and REPLACE with the attached Sheet ES601.
DELETE Sheet L-108 and REPLACE with the attached Sheet L-108.
DELETE Sheet P-001 and REPLACE with the attached Sheet P-001.
(End of Summary of Changes)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
W912EP20R0039
2. TYPE OF SOLICITATION
SEALED BID (IFB)
X NEGOTIATED (RFP)
3. DATE ISSUED
7-Oct-2020
PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE W912EP 8. ADDRESS OFFER TO (If Other Than Item 7) CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
TEL: FAX:
See Item 7
TEL: FAX:
9. FOR INFORMATION
CALL:
A. NAME
WILLIAM WALLACE
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
(Title, identifying no., date): 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS
FORT BUCHANAN FAMILY HOUSING REPLACEMENT FORT BUCHANAN , PUERTO RICO
DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION
DRAWINGS: SEE DFARS CLAUSE 252.236 7001, IN SECTION 00700.
MAGNITUDE OF CONSTRUCTION IS BETWEEN $10,000,000 AND $25,000,000.
THIS IS AN UNRESTRICTED SOLICITATION AND ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE.
THE NAICS CODE IS 236115 AND THE SMALL BUSINESS SIZE STANDARD IS $39,500,000.00.
***BLOCK 11 - SEE SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE
A SITE VISIT WILL BE HELD SEE FAR CLAUSE 52.236-27 IN SECTION 00100.
YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM THIS SOLICITATION THE SAM WEBSITE IS
LOCATED AT WWW.SAM.GOV.
11. The Contractor shall begin perf ormance within calendar days and complete it within calendar days after receiving award notice to proceed. This performance period is mandatory, negotiable. (See _S_E_C_T_I_O_N 0_0_700 .)
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. copies to perform the work required are due at the place specif ied in Item 8 by 0_2_:_0_0_P_M (hour)
(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All of fers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Of fers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
Sealed offers in original and 0
_______30
X X
________814 local time 6___ Nov 2020 l_______16 10:00 am
Amendment 0003 http://www.sam.gov/ http://www.sam.gov/
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
14. NAME AND ADDRESS OFOFFEROR (Include ZIP Code)
OFFER (Must be fully completed by offeror)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item14)
See Item 14
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing w thin calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OFPRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
20B. SIGNATURE 20C. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
22. AMOUNT 23. ACCOUNTING AND APPROPRIATIONDATA
24. SUBMIT INVOICES TO ADDRESS SHOWNIN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
26. ADMINISTEREDBY CODE 27. PAYMENT WILL BE MADEBY: CODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this 29. AWARD (Contractor is not required to sign this document.)
document and return _ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets f or the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and y our offer, and (b) this contract award. No further contractual document is necessary.
31A. NAME OF CONTRACTING OFFICER (Type or print) TO SIGN (Type or print)
30B. SIGNATURE 30C. DATE
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
NSN 7540-01-155-3212 STANDARD FORM 1442 BACK (REV. 4-85)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
FORT BUCHANAN FAMILY HOUSING REPLACEMENT
FORT BUCHANAN, PUERTO RICO
NOTES
(1) OFFER MUST PRICE ALL LINE ITEMS.
(2) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING JOB AS THE UNIT.
(3) THE JOB PRICE AND PAYMENT MADE FOR EACH ITEM LISTED SHALL CONSTITUTE FULL COMPENSATION FOR FURNISHING ALL PLANT, LABOR, MATERIALS AND EQUIPMENT, AND PERFORMING ANY ASSOCIATED CONTRACTOR QUALITY CONTROL, ENVIRONMENTAL PROTECTION, MEETING SAFETY REQUIREMENTS, TESTS AND REPORTS, AND FOR PERFORMING ALL WORK REQUIRED FOR WHICH SEPARATE PAYMENT IS NOT OTHERWISE PROVIDED. ALL COSTS FOR ITEMS OF WORK, WHICH ARE NOT SPECIFICALLY MENTIONED TO BE INCLUDED IN A PARTICULAR JOB OR UNIT PRICE PAYMENT ITEM, SHALL BE INCLUDED IN THE
LISTED JOB ITEM AND MUST CLOSELY ASSOCIATED WITH THE WORK INVOLVED.
(6) THE AMOUNTS INCLUDED FOR THE CLINS RELATED TO MUNICIPAL TAXES WILL NOT BE CONSIDERED FOR PRICE EVALUATION
OF THE PROPOSALS.
(4) PROGRESS PAYMENTS FOR JOB CLINS WILL BE MADE IN ACCORDANCE WITH THE PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS CLAUSE OF SECTION 00700 CONTRACT CLAUSES. SUBMIT A LIST OF PAY ACTIVITIES, (SCHEDULE OF VALUES) TO BREAKDOWN BID FOR EACH JOB CLIN. SUBMIT THE SCHEDULE OF VALUES FOR GOVERNMENT APPROVAL WITH THE BASELINE SCHEDULE SUBMITTAL (SEE SECTION 01 32 01 PROJECT SCHEDULE). AN UNBALANCED SCHEDULE OF VALUES AND PAY
ACTIVITY SCHEDULE WILL BE RETURNED FOR REVISION.
(10) PRICE FOR BID OPTION 7 SHALL BE GOOD FOR 365 CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
(5) THE CONTRACT PRICE WILL BE ADJUSTED TO COMPENSATE THE CONTRACTOR FOR THE AMOUNT OF CONSTRUCTION TAXES.
NO MARK-UPS WILL BE ALLOWED IN THIS LINE ITEM. THE CONTRACTOR WILL BE PAID ON THE BASIS OF PROOF OF PAYMENT
FROM THE APPROPRIATE COMMONWEALTH OF PUERTO RICO MUNICIPAL AUTHORITIES.
(8) LINE ITEMS 0006 THROUGH 0013 INCLUDE ALL REQUIRED WORK TO DELIVER A COMPLETE AND USABLE FACILITY INCLUDING
ASSOCIATED UTILITIES NOT INCLUDED IN LINE ITEM 2.
(7) LINE ITEM 0002 EXCLUDES UTILITY INSTALLATION FOR BID OPTIONS 1 THROUGH 4.
(9) PRICE FOR BID OPTIONS 1 THROUGH 6 SHALL BE GOOD FOR 180 CALENDAR DAYS FROM NOTICE TO PROCEED (NTP).
W912EP20R0039 00010A-2
FORT BUCHANAN FAMILY HOUSING REPLACEMENT
FORT BUCHANAN, PUERTO RICO
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 DEMOLITION JOB $_______________
0002 LAND DEVELOPMENT JOB $_______________
0003 HOUSING JOB $_______________
0004 RECREATIONAL PARK JOB $_______________
SUBTOTAL BASE (LINE ITEMS 0001 THROUGH 0004) $_______________
0005 MUNICIPAL TAXES JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0005) $_______________
0006 BID OPTION 1 (House 14 Model A.A) JOB $_______________
0007 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 1 (LINE ITEMS 0006 THROUGH 0007) $_______________
0008 BID OPTION 2 (House 15 Model A.A) JOB $_______________
0009 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 2 (LINE ITEMS 0008 THROUGH 0009) $_______________
0010 BID OPTION 3 (House 16 Model A.A) JOB $_______________
0011 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 3 (LINE ITEMS 0010 THROUGH 0011) $_______________
0012 BID OPTION 4 (House 17 Model A.A) JOB $_______________
0013 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 4 (LINE ITEMS 0012 THROUGH 0013) $_______________
0014 BID OPTION 5 (North Buffer Trees) JOB $_______________
0015 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 5 (LINE ITEMS 0014 THROUGH 0015) $_______________
BID OPTION 6 (PARK TREES, SHRUBS AND GROUND
COVER) JOB $_______________
0017 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 6 (LINE ITEMS 0016 THROUGH 0017) $_______________
0018 BID OPTION 7 - APPLIANCES (KITCHEN, LAUNDRY) JOB $_______________
0019 MUNICIPAL TAXES JOB $_______________
TOTAL BID OPTION 7 (LINE ITEMS 0018 THROUGH 0019) $_______________
TOTAL OPTIONS (LINE ITEMS 0006 THROUGH 0019) $_______________
TOTAL BASE PLUS OPTIONS (LINE ITEMS 0001 THROUGH 0019) $_______________
W912EP20R0039 00010A-1 Amendment 0003
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) October 26, 2020, End of Day. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: W912EP20R0039
The Bidder Inquiry Key is: 2TG5MF 5PDN3J
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
_________November 1, 2020_____________________
November 9, Project Title: U.S. ARMY FAMILY HOUSING REPLACEMENT
FT. BUCHANAN, GUAYNABO, PUERTO RICO
(3) The contract price will be adjusted to compensate the Contractor for the amount of construction taxes. No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authorities.
W912EP20R0039 00010A-2 Amendment 0003
LEED v4 for Building Design and Construction: Homes Project Checklist Ft. Buchanan Family Housing Replacement
11/3/2020
Y ? N 2 Credit 2
5 3 7 15 3 Credit Heating & Cooling Distribution Systems 3 Y Prereq Floodplain Avoidance Required 1 1 1 Credit Efficient Domestic Hot Water Equipment 3
2 Credit Lighting 2 0 Credit 15 2 Credit High Efficiency Appliances 2
4 Credit Renewable Energy 4 5 2 1 Credit Site Selection 8
3 Credit 3 5 3 2 Materials and Resources 10 1 1 Credit 2 Y Prereq Certified Tropical Wood Required
2 Credit 2 Y Prereq Durability Management Required 1 Credit Durability Management Verification 1
3 2 2 7 1 1 2 Credit Environmentally Preferable Products 4 Y Prereq Construction Activity Pollution Prevention Required 3 Credit Construction Waste Management 3 Y Prereq No Invasive Plants Required 2 Credit Material Efficient Framing 2 1 1 Credit 2 2 1 Credit 3 5 0 11 Indoor Environmental Quality 16
2 Credit 2 Y Prereq Ventilation Required Y Prereq Combustion Venting Required
6 4 2 Water Efficiency 12 Y Prereq Garage Pollutant Protection Required Y Prereq Water Metering Required Y Prereq Radon-Resistant Construction Required
Y Prereq Air FIltering Required 6 4 2 Credit 12 Y Prereq Environmental Tobacco Smoke Required
Y Prereq Compartmentalization Required 0 Credit 6 3 Credit Enhanced Ventilation 3 0 Credit 4 2 Credit Contaminant Control 2
3 Credit Balancing of Heating and Cooling Distribution Systems 3 25 6 6 Energy and Atmosphere 38 1 Credit Enhanced Compartmentalization 1 Y Prereq Minimum Energy Performance Required 2 Credit Enhanced Combustion Venting 2 Y Prereq Energy Metering Required 2 Credit Enhanced Garage Pollutant Protection 2 Y Prereq Education of the Homeowner, Tenant or Building Manager Required 3 Credit Low Emitting Products 3
Credit 29 5 1 0 Innovation 6 Y Prereq Preliminary Rating Required
2 3 Credit 5 5 Credit Innovation 5 2 Credit Advanced Utility Tracking 2 1 Credit LEED AP Homes 1
1 Credit 1 1 Credit HVAC Start-Up Credentialing 1 3 1 0 Regional Priority 4
1 Credit Regional Priority: Site Selection 1 Y Prereq Home Size Required 1 Credit Regional Priority: Total Water Use 1
3 Credit 3 1 Credit Regional Priority: Material Efficient Framing 1 2 Credit 2 1 Credit Regional Priority: Rainwater Management 1 2 Credit 2 3 Credit 3 57 20 30 TOTALS Possible Points: 110 2 2 Credit 4 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
Heat Island Reduction
Building Orientation for Passive Solar
Rainwater Management Non-Toxic Pest Control
PERFORMANCE PATH
PERFORMANCE PATH
Total Water Use
Indoor Water Use
Annual Energy Use
Outdoor Water Use
PRESCRIPTIVE PATH
Air Infiltration Envelope Insulation Windows Space Heating & Cooling Equipment
BOTH PATHS
PRESCRIPTIVE PATH
Efficient Hot Water Distribution System
Active Solar Ready Design
Project Name:
Date:
Location and Transportation
Sustainable Sites
LEED for Neighborhood Development Location
PERFORMANCE PATH
PRESCRIPTIVE PATH
Compact Development Community Resources
Integrative Process EA PRESCRIPTIVE PATH (continued)
Access to Transit
Fort Buchanan Family Housing Replacement Fort Buchanan Guaynabo, Puerto Rico
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 31 16.13
CHEMICAL TERMITE CONTROL
08/16
PART 1 GENERAL
1.1 REFERENCES
1.2 ADMINISTRATIVE REQUIREMENTS
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.4.1 Regulatory Requirements
1.4.2 Qualifications
1.4.3 Safety Requirements
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Inspection
1.5.3 Storage
1.5.4 Handling
1.6 SITE CONDITIONS
1.6.1 Soil Moisture
1.6.2 Runoff and Wind Drift
1.7 WARRANTY
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 MATERIALS
2.2.1 Termiticides
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Verification
3.1.2 Foundation Exterior
3.1.3 Utilities and Vents
3.1.4 Crawl and Plenum Air Spaces
3.1.5 Application Plan
3.2 APPLICATION
3.2.1 Equipment Calibration and Tank Measurement
3.2.2 Mixing and Application
3.2.2.1 Application Method
3.2.2.1.1 Surface Application
3.2.2.1.2 Rodding and Trenching
3.2.3 Sampling
3.2.4 Vapor Barriers and Waterproof Membranes
3.2.5 Placement of Concrete
3.2.6 Clean Up, Disposal, And Protection
3.2.6.1 Clean Up
3.2.6.2 Disposal of Termiticide
3.3 FIELD QUALITY CONTROL
SECTION 31 31 16.13 Page 1
W912EP20R0039
3.3.1 Verification of Measurement
3.3.2 Inspection
3.3.2.1 Technical Representative
3.4 CLOSEOUT ACTIVITIES
3.5 PROTECTION
3.5.1 Protection of Treated Area
3.5.2 Disturbance of Treated Soils
-- End of Section Table of Contents --
SECTION 31 31 16.13 Page 2
SECTION 31 31 16.13
CHEMICAL TERMITE CONTROL
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. DEPARTMENT OF DEFENSE (DOD)
DODI 4150.07 (2019) DOD Pest Management Program
1.2 ADMINISTRATIVE REQUIREMENTS
Coordinate work related to final grades, landscape plantings, foundations, or any other alterations to finished construction which might alter the condition of treated soils with this specification.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Termiticide Application Plan ; G
SD-03 Product Data
Termiticides
SD-05 Design Data
Mixing Formulation
SD-06 Test Reports
Soil Moisture
Calibration Test
SD-07 Certificates
Qualifications ; G
Foundation Exterior
Utilities and Vents
SECTION 31 31 16.13 Page 3
Crawl and Plenum Air Spaces
List of Equipment
SD-08 Manufacturer's Instructions
Termiticides
SD-11 Closeout Submittals
Verification of Measurement
Warranty
Pest Management Report
1.4 QUALITY CONTROL
1.4.1 Regulatory Requirements
Comply with DODI 4150.07 for requirements on Contractor's licensing, certification, and record keeping. Maintain daily records using the Pest Management Maintenance Record, DD Form 1532-1, or a computer generated equivalent, and submit copies of records when requested by the Contracting Officer. These forms may be obtained from the main web site:
http://www.dtic.mil/whs/directives/forms/eforms/dd1532-1.pdf
1.4.2 Qualifications
For the application of pesticides, use the services of an applicator whose principal business is pest control. The applicator must be commercially certified in the state where the work is to be performed as required by DODI 4150.07. Termiticide applicators must also be certified in the U.S. Environmental Protection Agency (EPA) pesticide applicator category which includes structural pest control. Submit a copy of the pest control business license and pesticide applicator certificates.
1.4.3 Safety Requirements
Formulate, treat, and dispose of termiticides and their containers in accordance with label directions. Draw water for formulating only from sites designated by the Contracting Officer, and fit the filling hose with a backflow preventer meeting local plumbing codes or standards. Perform filling operations under the direct and continuous observation of a contractor's representative to prevent overflow. Secure pesticides and related materials under lock and key when unattended. Ensure that proper protective clothing and equipment are worn and used during all phases of termiticide application. Dispose of used pesticide containers off Government property.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver termiticide material to the site in the original unopened containers bearing legible labels indicating the EPA registration number, manufacturer's registered uses and in new or otherwise good condition as supplied by the manufacturer or formulator.
SECTION 31 31 16.13 Page 4
1.5.2 Inspection
Inspect termiticides upon arrival at the job site for conformity to type and quality in accordance with paragraph TERMITICIDES. Each label must bear evidence of registration under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), as amended or under appropriate regulations of the host county. Inspect other materials for conformance with specified requirements. Remove unacceptable materials from the job site.
1.5.3 Storage
Storage of pesticides on the installation will not be permitted unless it is written into the contract.
1.5.4 Handling
Handle and mix termiticides in accordance with the manufacturer's label and SDS, preventing contamination by dirt, water, and organic material.
Protect termiticides from weather elements as recommended by the manufacturer's label and SDS. Spill kits must be maintained on pest control vehicles and must be available at the mixing site. Conduct termiticide mixing in an area with adequate spill containment.
1.6 SITE CONDITIONS
The following site conditions determine the acceptable time of application.
1.6.1 Soil Moisture
Test soils to be treated immediately before application. Test soil moisture content to a minimum depth of 3 inches . The soil moisture must be as recommended by the termiticide manufacturer. Application of the termiticide is not permitted when soil moisture content exceeds manufacturer's recommendations.
1.6.2 Runoff and Wind Drift
Application of termiticide will not be permitted during or immediately following heavy rains, when conditions may allow runoff, or create an environmental hazard or when average wind speed exceeds 10 miles per hour. Termiticide is not permitted to enter water systems, aquifers, or endanger humans or animals.
1.7 WARRANTY
Provide a 5 year written warranty against infestations or reinfestations by subterranean termites of the buildings or building additions constructed under this contract. Include in the warranty annual inspections of the buildings or building additions during the warranty period. If live subterranean termite infestation or subterranean termite damage is discovered during the warranty period, and the soil and building conditions have not been altered in the interim:
a. Retreat the site and perform other treatment as may be necessary for elimination of subterranean termite infestation;
b. Repair damage caused by termite infestation; and
c. Reinspect the building approximately 180 days after the re-treatment.
SECTION 31 31 16.13 Page 5
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Chemical termite control uses liquid termiticide treatments applied to the soil to form a continuous chemical barrier in the soil around both sides of the foundation. The application can be surface applied or rodded and trenched. This barrier prevents foraging termites from reaching the foundation and piers. Only the soil adjacent to these foundation elements is treated. For slab construction (including foundations, patios and garages), the entire soil (or gravel) surface is treated before the vapor barrier is installed and the slab poured over it. Soil treatment is coordinated with all building activities from foundation construction through final grading of the soil around the building's exterior. In order for the treatment to be effective, the final phase of the application must be done after final grading and sometimes after landscaping is completed so that the treated soil is not disturbed.
2.2 MATERIALS
2.2.1 Termiticides
Provide termiticides currently registered by the EPA or approved for such use by the appropriate agency of the host county and as approved by the Contracting Officer. Select non-repellant termiticides for maximum effectiveness and duration after application. Select a termiticide that is suitable for the soil and climatic conditions at the project site and apply at the highest labeled rate. Submit manufacturer's label and Safety Data Sheet (SDS) for termiticides proposed for use.
PART 3 EXECUTION
3.1 PREPARATION
Eliminate food sources by removing debris from clearing and grubbing and post construction wood scraps such as ground stakes, form boards, and scrap lumber from the site, before termiticide application begins.
3.1.1 Verification
Before work starts, verify that final grades are as indicated and smooth grading has been completed in accordance with Section 31 00 00 EARTHWORK.
Finely grade soil and remove particles larger than 1 inch . Compact soil particles to eliminate soil movement.
3.1.2 Foundation Exterior
If the exterior perimeter treatment is applied when the horizontal barrier is applied it will be damaged or removed before construction is completed. The exterior foundation perimeter treatment will have to occur in phases when any pads, porches, aprons, sidewalks, final grading or landscape planting are simultaneously involved adjacent to the building foundation. This treatment area should be coordinated after all major construction but before any pads, porches, or other items requiring special consideration are poured adjacent to the foundation walls. Submit written verification that final grading, landscape planting and other items adjacent to the foundation will not disturb treatment of the soil on the exterior sides of foundation walls, grade beams, and similar
SECTION 31 31 16.13 Page 6 structures.
3.1.3 Utilities and Vents
Turn off and block HVAC ducts and vents located in treatment area prior to application, to protect people and animals from termiticide. Submit written verification that the HVAC ducts and vents, water and sewer lines, and plumbing have been turned off or blocked prior to applying termiticide.
3.1.4 Crawl and Plenum Air Spaces
Submit written verification that crawl and plenum air spaces have been located and identified prior to applying termiticide.
3.1.5 Application Plan
Prior to commencing application of termiticide, submit a Termiticide Application Plan addressing the following items:
a. proposed sequence of treatment work including dates and times of application
b. termiticide trade name
c. EPA registration number
d. chemical composition
e. concentration of original and diluted material
f. formulation
g. manufacturer's recommended application rates
h. regional requirements
i. application rate of active ingredients
j. method of application
k. area or volume to be treated
l. amount to be applied
m. copy of the pest control business license
n. copy of the pesticide applicator certificates
3.2 APPLICATION
For areas to be treated, establish complete and unbroken vertical and horizontal soil poison barriers between the soil and all portions of the intended structure which may allow termite access to wood and wood related products. Make applications to crawl spaces in accordance with label directions. Applications to crawl space areas that are used as plenum air spaces will not be permitted.
3.2.1 Equipment Calibration and Tank Measurement
Submit a list of equipment to be used. Conduct calibration test on the application equipment to be used immediately prior to commencement of termiticide application. Measure the volume and contents of the application tank. Testing must confirm that the application equipment is operating within the manufacturer's specifications and meets the specified requirements. Submit written certification of the equipment calibration test results within 1 week of testing. Where results from the equipment calibration and tank measurements tests are unsatisfactory, re-treatment will be required.
3.2.2 Mixing and Application
Perform all work related to formulating, mixing, and application in the presence of the Contracting Officer and a DOD certified pesticide
SECTION 31 31 16.13 Page 7 applicator, Pest Management QAE/PAR, or Integrated Pest Management Coordinator. Submit mixing formulation :
a. Quantity of pesticide used.
b. Rate of dispersion.
c. Percent of use.
d. Total amount used.
A closed system is recommended as it prevents the termiticide from coming into contact with the applicator or other persons. Only use water from designated locations. Fit filling hoses with a backflow preventer meeting local plumbing codes or standards. Prevent overflow during the filling operation. Spill kits must be maintained on pest control vehicles and must be available at the mixing site. Termiticide mixing must be conducted in an area that has been designated by the Government representative and that has adequate spill containment. Inspect the application equipment for applying termiticides prior to each day of use for leaks, clogging, wear, or damage. Immediately perform repairs on the application equipment to prevent or eliminate leaks and clogging.
3.2.2.1 Application Method
3.2.2.1.1 Surface Application
Use surface application for establishing horizontal barriers. Apply surface applicants as a coarse spray and provide uniform distribution over the soil surface. Termiticide must penetrate a minimum of 1 inch into the soil, or as recommended by the manufacturer. If soils are treated to a depth less than specified or approved, repeat work performed to the depth specified at no additional cost to the Government.
3.2.2.1.2 Rodding and Trenching
Use rodding and trenching for establishing vertical soil barriers.
Trenching must be to the depth of the foundation footing. Width of trench must be as recommended by the manufacturer, or as indicated. Rodding or other approved method may be implemented for saturating the base of the trench with termiticide. Backfill the trench immediately after termiticide has reached maximum penetration as recommended by the manufacturer. If maximum penetration is not achieved, as recommended by the manufacturer, repeat work performed to maximum penetration as recommended by the manufacturer at no additional cost to the Government.
Backfill in 6 inch rises or layers. Treat each rise or layer with termiticide.
3.2.3 Sampling
The Contracting Officer may draw samples for analysis, at any time and without prior notice, from stocks at the job site to determine if the amount of active ingredient specified on the label is being applied. When analysis, performed by the Government, indicates samples contain less than the amount of active ingredient specified on the label, repeat work performed with pesticides conforming to this specification at no additional cost to the Government.
SECTION 31 31 16.13 Page 8
3.2.4 Vapor Barriers and Waterproof Membranes
Apply termiticide prior to placement of a vapor barrier or waterproof membrane.
3.2.5 Placement of Concrete
Place concrete covering treated soils as soon as the termiticide has reached maximum penetration into the soil as recommended by the manufacturer.
3.2.6 Clean Up, Disposal, And Protection
Once application has been completed, proceed with clean up and protection of the site without delay.
3.2.6.1 Clean Up
Clean the site of all material associated with the treatment measures, according to label instructions, and as indicated. Remove and dispose of excess and waste material off Government property.
3.2.6.2 Disposal of Termiticide
Dispose of residual termiticides and containers off Government property, and in accordance with label instructions and EPA criteria.
3.3 FIELD QUALITY CONTROL
3.3.1 Verification of Measurement
Once termiticide application has been completed, measure tank contents to determine the remaining volume. The total volume measurement of used contents for the application must equal the application rate established in the application plan. Submit written verification that the volume of termiticide used meets the application rate established in the application plan.
3.3.2 Inspection
3.3.2.1 Technical Representative
Provide a technical representative who is a DOD certified pesticide applicator or Pest Management Quality Assurance Evaluator (QAE)/Performance Assessment Representative (PAR). The technical representative must be present at all meetings concerning treatment measures for subterranean termites and during treatment application.
Contact the Integrated Pest Management Coordinator prior to starting work.
3.4 CLOSEOUT ACTIVITIES
Upon completion of this work, submit the Pest Management Report DD Form 1532, or an equivalent computer product, to the Integrated Pest Management Coordinator. This form identifies the target pest, type of operation, brand name and manufacturer of pesticide, formulation, concentration or rate of application used.
SECTION 31 31 16.13 Page 9
3.5 PROTECTION
3.5.1 Protection of Treated Area
Immediately after the application, protect the area from other use by erecting barricades as required or directed. Place signage inside the entrances to crawl spaces and identify the space as treated with termiticide and not safe for children or animals. Cover treated areas with plastic if slab is not to be poured immediately following termiticide application.
3.5.2 Disturbance of Treated Soils
Re-treat soil and fill material disturbed after treatment before placement of slabs or other covering structures.
-- End of Section --
SECTION 31 31 16.13 Page 10
DW
R e f
WD
W D
Ref
D W
D W
Ref
DW
D
Ref
DW
D W
STORAGE
2-CAR GARAGE
KITCHEN
DINING RM
LIVING - FAMILY RM
BDRM 1
BATH
BDRM 2
108M. CLOS
M. BDRM
M. BATH
WC
PATIO
ENTRY PATIO
A-003
B8
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
EXHAUST FAN
RE: MECH DWGS
S
S
S S
S
TYP. SMOKE-CO2
DETECTOR
TYP. SMOKE-CO2
DETECTOR
CLOSURE AND
20 MIN. RATED
SEPARATION
WALLS
FROM GARAGE AND
HOUSE, SEAL ANY
PENETRATIONS
DOMESTIC WATER
HEATER RE: MECH
DWGS,
COMBUSTION AIR
BACK DOOR EGRESS
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
MECH
TRASH
PATIO
M. BDRM
M. BATH
M. WC
M. CLOSET
BDRM 1
BDRM 2
H A
L L W
A Y
BDRM 3
BATH
PWDR
GARAGE
STOR
DINING RM
LIVING - FAMILY RM
KITCHEN
PANTRY
CLOSET
ENTRY PATIO
LAUNDRY
A-003
B5
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
S
S
S S
S
S
BACK DOOR EGRESS
FRONT DOOR EGRESS
TYP. SMOKE-CO2
DETECTOR
TYP. SMOKE-CO2
DETECTOR
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
CLOSURE AND
20MIN. RATED
SEPARATION WALLS
FROM GARAGE AND
HOUSE, SEAL ANY
PENETRATIONS
DOMESTIC WATER
HEATER RE: MECH
DWGS,
COMBUSTION AIR
EXHAUST FAN
RE: MECH DWGS
MECH
TRASH
DINING RM
KITCHEN
M. BDRM
H A
L L W
A Y
M. BATH
WC
M. CLOSET
BDRM 1
BATH
LAUNDRY
ENTRY
PANTRY
105STOR
GARAGE
CLOSET
CLOSET
CLOSET
PWDR RM
PATIO
ENTRY PATIO
LIVING -FAMILY RM
BDRM 2
A-003
A1
20"WX24"H MIN
44" SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN 44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
DOMESTIC WATER
HEATER
RE: MECH DWGS,
COMBUSTION AIR
FRONT DOOR EGRESS
BACK DOOR EGRESS
CLOSURE AND
20 MIN. RATED
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGSEXHAUST FAN
RE: MECH DWGS
SEPARATION WALLS
FROM GARAGE AND
HOUSE, SEAL ANY
PENETRATIONS
S
S
S
S
S
TYP. SMOKE-CO2
DETECTOR
TYP. SMOKE-CO2
DETECTOR
MECH
TRASH
M. BATH
M. CLOS
H A
L L W
A Y
WC
LAUNDRY
STUDY
M.BDRM
S
S
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
33"X60"
CLEAR AREA
OPERABLE WINDOW
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
TYP. SMOKE-CO2
DETECTOR
PANTRY
FLEX ROOM
PATIO
BACK DOOR EGRESS
MECH
TRASH
M. BDRM
HALL
M. BATH
M. CLOSET
BDRM 3
WC
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
S TYP. SMOKE-CO2
DETECTOR
EXHAUST FAN
RE: MECH DWGS
S
21"x60"
CLEAR AREA
OPERABLE WINDOW
S
JURISDICTION: FT. BUCHANAN, PUERTO RICO
APPLICABLE CODE: INTERNATIONAL RESIDENTIAL CODE (2015)
NFPA 101 (2018)
PUERTO RICO BUILDING CODE
INTERNATIONAL MECHANICAL CODE (2015)
INTERNATIONAL PLUMBING CODE (2015)
INTERNATIONAL ENERGY CONSERVATION CODE
TYPE OF CONSTRUCTION: TYPE II-B
OCCUPANCY: R-3 (IBC)
ONE- AND TWO- FAMILY DWELLING, CHAPTER 24 (NFPA)
FIRE SPRINKLER SYSTEM: PROTECTED, SPRINKLED
REFER TO SHEET A-003 FOR AREA CALCULATIONS
THIS PROJECT SHALL COMPLY WITH ALL OTHER REGULATIONS AND ORDINANCES
ADOPTED BY THE LOCAL GOVERNING AGENCIES.
CODE ANALYSIS
EGRESS REQUIREMENTS: EGRESS REQUIREMENTS AT ALL BEDROOMS:
MIN (1) OPERABLE WINDOW WITH A MIN NET
CLEAR OPERABLE AREA OF 5.7 SQ. FT. THE
MIN NET CLEAR OPERABLE HEIGHT SHALL BE
24" AND WIDTH SHALL BE 20" PER THE IRC.
R VALUES: WALL INSULATION MIN R-14.2
ROOF INSULATION MIN R-30 PLUS TAPER
GARAGE
LIVING - FAMILY RM
DINING RM
KITCHEN
M. BDRM
BDRM 1
BDRM 2
BDRM 3
M. CLOSET
M. BATH
PWDR RM
LAUNDRY
BATH
ENTRY
STOR
PANTRY
105 HALLWAY
WC
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
S
TYP. SMOKE-CO2
DETECTOR
EXHAUST FAN
RE: MECH DWGS
S
S
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
SEPARATION WALLS
FROM GARAGE AND
HOUSE, SEAL ANY
PENETRATIONS
CLOSURE AND
20 MIN RATED
DOMESTIC WATER
HEATER
RE: MECH DWGS,
COMBUSTIAN AIR
EXHAUST FAN
RE: MECH DWGS
MECH
TRASH
BACK DOOR EGRESS
20"WX24"H MIN
44"SILL MAX
CLEAR AREA
OPERABLE WINDOW
FRONT DOOR
EGRESS
S
S
S
EXHAUST FAN
RE: MECH DWGS TYP. SMOKE-CO2
DETECTOR
EXHAUST FAN
RE: MECH DWGS
EXHAUST FAN
RE: MECH DWGS
PATIO
ENTRY
PATIO
D
2 3
C
A
B
SHEET ID
S O
L
IC
IT
A
T
IO
N N
O
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
IS
S
U E
D A
T E
S B
M T
B Y
C O
N T
R A
C T
N O
S
IZ
E
"X
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
US Army Corps of Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
C K
S O
N V
IL
L
E D
IS
T
R
IC
T
S
A N
M A
R C
O B
L V
D
J A
C K
S O
N V
IL
L
E F
L O
R
ID
A
6 7 8 9 10
E
F
G
A .R
IV
A
R D
B .P
O R
TE
R
E . S
A N
TO
S
A . R
IV
A
R D
A -0
.D
W G
A-003
A R
C H
IT
E
C T
U R
A L C
O D
E A
N A
L Y
S
IS
L
IF
E S
A F
E T
Y P
L A
N S
RTA SUBMITTAL
A U
G U
S T
W
2E P
R
F O
R T
B U
C H
A N
A N
G
U A
Y N
A B
O P
U E
R T
O R
IC
O
F O
R T
B U
C H
A N
A N
F A
M
IL
Y H
O U
S
IN
G R
E P
L A
C E
M E
N T
D8
LIFE SAFETY PLAN - MODEL A.A
D5
LIFE SAFETY PLAN - MODEL B.A
D1
LIFE SAFETY PLAN - MODEL C.A
B8
LIFE SAFETY PLAN - MODEL A.B
B5
LIFE SAFETY PLAN - MODEL B.B
A1
LIFE SAFETY PLAN - MODEL C.B
A3
LIFE SAFETY PLAN - MODEL C.C
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
R
E V
IS
E
D P
E R
A M
E N
D M
E N
T
O
C T arivard Stamp
DW
R e f
WD
W D
Ref
D W
D W
Ref
DW
D
STORAGE
2-CAR GARAGE
KITCHEN
DINING RM
LIVING - FAMILY RM
BDRM 1
BATH
BDRM 2
108M. CLOS
M. BDRM
M. BATH
WC
PATIO
ENTRY PATIO
H A
L L W
A Y
A-004
A7
188 SF
122 SF
114 SF
GREAT ROOM
GREAT ROOM
602SF
PATIO
M. BDRM
M. BATH
M. WC
M. CLOSET
BDRM 1
BDRM 2
H A
L L W
A Y
BDRM 3
BATH
PWDR
GARAGE
STOR
DINING RM
LIVING - FAMILY RM
KITCHEN
PANTRY
CLOSET
ENTRY PATIO
LAUNDRY
A-004
A5
120 SF
118 SF
150 SF
224 SF
GREAT ROOM
GREAT ROOM
780SF
DINING RM
KITCHEN
M. BDRM
H A
L L W
A Y
M. BATH
WC
M. CLOSET
BDRM 1
BATH
LAUNDRY
ENTRY
PANTRY
105STOR
GARAGE
CLOSET
CLOSET
CLOSET
PWDR RM
PATIO
ENTRY PATIO
LIVING -FAMILY RM
BDRM 2
A-004
A1
126 SF
131 SF
GREAT ROOM
GREAT ROOM
663SF
M. BATH
BDRM 1
BDRM 2
BATH
M. CLOS
WC
LAUNDRY
STUDY
M.BDRM
118213 SFPANTRY
FLEX ROOM
PATIO
M. BDRM
HALL
M. BATH
M. CLOSET
BDRM 3
WC
213 SF
108 SF
126 SF
M. BDRM
DINING RM
KITCHEN
LIVING - FAMILY RM
M. CLOSET
M. BATH
BDRM 3
BDRM 2
H A
L L W
A Y
PWDR RM
LAUNDRY
BATH
BDRM 1
GARAGE
STOR
PANTRY
ENTRY
205 SF
103 SF
136 SF
GREAT ROOM
GREAT ROOM
557 SF
103 SF
D
2 3
C
A
B
SHEET ID
S O
L
IC
IT
A
T
IO
N N
O
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
IS
S
U E
D A
T E
S B
M T
B Y
C O
N T
R A
C T
N O
S
IZ
E
"X
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
US Army Corps of Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
C K
S O
N V
IL
L
E D
IS
T
R
IC
T
S
A N
M A
R C
O B
L V
D
J A
C K
S O
N V
IL
L
E F
L O
R
ID
A
6 7 8 9 10
E
F
G
A . R
IV
A
R D
B . P
O R
T E
R
E . S
A N
T O
S
A . R
IV
A
R D
A -0
.D
W G
A-004
A R
C H
IT
E
C T
U R
A L M
O D
E L A
R E
A P
L A
N S
RTA SUBMITTAL
A U
G U
S T
W
2E P
R
F O
R T
B U
C H
A N
A N
G
U A
Y N
A B
O P
U E
R T
O R
IC
O
F O
R T
B U
C H
A N
A N
F A
M
IL
Y H
O U
S
IN
G R
E P
L A
C E
M E
N T
D7
AREA PLAN - MODEL A.A
D5
AREA PLAN - MODEL B.A
D1
AREA PLAN - MODEL C.A
A7
AREA PLAN - MODEL A.B
A5
AREA PLAN - MODEL B.B
A1
AREA PLAN - MODEL C.B
MODEL A.A 2291.50 SQFT
MODEL A.B 2829.83 SQFT
MODEL A.B ADD OF 229.50 SQFT PER ANSI Z765
ADD OF 238.33 SQFT GROSS SQUARE FOOTAGE
MODEL B.A 3018 SQFT
MODEL B.B 3188.28 SQFT
MODEL B.B ADD OF 217.39 SQFT PER ANSI Z765
ADD OF 219.78 SQFT GROSS SQUARE FOOTAGE
MODEL C.A 2620.01 SQFT
MODEL C.B 2786.68 SQFT
MODEL C.C 1950 SQFT
MODEL C.B ADD OF 171.50 SQFT PER ANSI Z765
ADD OF 178.22 SQFT GROSS
SQUARE FOOTAGE
PER ANSI Z765PER ANSI Z765
PER ANSI Z765
GROSS SQUARE FOOTAGE
HABITABLE SPACE
MODEL C.A = 2033.75 SQFT
MODEL C.B = 2200.42 SQFT
GARAGE - STORAGE 586.26 SQFT
MODEL C.C = 1989 SQFT
GARAGE - STORAGE 629 SQFT
GROSS SQUARE FOOTAGE
HABITABLE SPACE
MODEL B.A = 2359.11 SQFT
MODEL B.B = 2529.39 SQFT
GARAGE - STORAGE 658.89 SQFT
GROSS SQUARE FOOTAGE
HABITABLE SPACE
MODEL A.A = 1661.33 SQFT
MODEL A.B = 1899.66 SQFT
GARAGE - STORAGE 630.17SQFT
SOW REQUIRED VALUES:
C.A 2,020 SQFT
C.B 2,150 SQFT
C.C 1,950 SGFT
SOW REQUIRED VALUES:
B.A. 2,310 SQFT
B.B. 2,520 SQFT
SOW REQUIRED VALUES:
A.A. 1,630 SQFT
A.B. 1,860 SQFT
A3
AREA PLAN - MODEL C.C
MODEL C.C 1,950 SQFT PER ANSI Z765
1,989 SQFT GROSS SQUARE FOOTAGE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
R
E V
IS
E
D P
E R
A M
E N
D M
E N
T
O
C T
W D
Ref
D W
PATIO
M. BDRM
M. BATH
M. WC
M. CLOSET
BDRM 1
BDRM 2
H A
L L W
A Y
BDRM 3
BATH
PWDR
GARAGE
STOR
DINING RM
LIVING - FAMILY RM
KITCHEN
PANTRY
CLOSET
ENTRY PATIO
LAUNDRY
B1 B2 B3 B4 B5 B6 B7
BF
BG
BE
BD
BC
BB
BA
C1
A-221B
E1
A-302B
E1
A-302B
B1
A-302B
B1
A-302B
4 5
S L O
P E
S L O
P E
/8
S L O
P E
/8
101C
116B
113113B
111B 111
115B
115A
101B
W1
W1
W1
W1
W4
W4 W4108
109 116
W5
W5 W5
101A
W4
5" MAX
A-401B
E1
A-401B
B1
A5
A-331B
B9
A-312
B9
A-313
A-504
A1
A-504
A1
A-504
A1
W7 W7
A-402B
C4
A2
A-331B
SLOPE
1/8" FT.
MECH/TRASH
B4
A-313
B2
A-312
W7
B5
A-314
B8
A-314
EQ EQ EQ
1 1
8M1
8M1
8M1
W1
A-402B
A7
8M1
8M1
A-102B
E7 B .B
B
.AB
.B
B .A
A-505
B7
SHEET KEYNOTESNOT ALL MAY APPLY
1. MECHANICAL VENTILATOR UNIT; RE: MECHANICAL
DRAWINGS
2. ELECTRICAL PANEL, RE: ELECTRICAL DWGS.
3. WASHER SPACE: PROVIDE RECESSED WATER AND
DRAIN CONNECTIONS. REF. PLUMB DRAWINGS.
4. DRYER SPACE: PROVIDE DRYER VENT. REF MECH
DRAWINGS.
5. WATER HEATER ON 6" HIGH PLATFORM, SEISMIC STRAPS
REQUIRED ON WATER HEATERS WITHIN UPPER ONE-
THIRD (1/3) AND LOWER ONE-THIRD (1/3) OF ITS
VERTICAL DIMENSIONS.
6. PROVIDE HURRICANE GARAGE DOOR BRACING
(REMOVABLE STORABLE SYSTEM).
7. GARAGE DOORS SHALL BE LISTED AND LABELED IN
ACCORDANCE TO UL 325. GARAGE DOORS SHALL BE
TESTED IN ACCORDANCE WITH EITHER ASTM E330 OR
ANSI/DASMA 108 AND SHALL MEET THE ACCEPTANCE
CRITERIA OF ANSI/DASMA 108.
8. TIGHT FITTING DOOR, WITH SELF-CLOSING HARDWARE.
9. 8" CMU WALL BELOW.
10. AC CONDENSING UNIT ON 6" CURB. REF MECH
DRAWINGS.
11. OPEN SCREEN WALL BLOCK - 8X8X8 CMU ON SIDE.
REFER TO DETAIL A1/A-504
12. PREFINISHED SHEET METAL DOWN SPOUT TO
SPLASH BLOCK WITH 6' EXTENSION AT GROUND LEVEL.
13. 4" CAST-IN-PLACE CONCRETE SIDEWALK
RE: CIVIL DWGS.
14. 16" CLOSET SHELF AND ROD ON BRACKETS AT 2'-0"OC.
15. (5) SHELVES, 12" DEEP WITH BULLNOSE EDGE WITH
HEAVY DUTY STANDARDS AND BRACKETS AT 2'-0" OC.
16. OVERHEAD GARAGE DOOR OPENER, MOTION SENSOR
LIGHT, (2) REMOTE OPERATORS, BATTERY BACK-UP.
17.RAIN BARREL, RAIN WATER CATCHMENT CONTAINER
WITH 4" CONCRETE PAD.
PATIO FLEX ROOM
B3 B4 B5 B6 B7
BB
BA
C1
A-222B W6 W6
W1
MECH/TRASH
101C
13 13
B5
A-314
B .B
B .A
B .B
B .A
1. ALL INTERIOR WALLS TO BE 6M, UNLESS NOTED
OTHERWISE.
GENERAL SHEET NOTES
MODEL C.B
MODEL C.A
D
2 3
C
A
B
SHEET ID
S O
L
IC
IT
A
T
IO
N N
O
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
IS
S
U E
D A
T E
S B
M T
B Y
C O
N T
R A
C T
N O
S
IZ
E
"X
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
US Army Corps of Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
C K
S O
N V
IL
L
E D
IS
T
R
IC
T
S
A N
M A
R C
O B
L V
D
J A
C K
S O
N V
IL
L
E F
L O
R
ID
A
6 7 8 9 10
E
F
G
KEY PLANS
A . R
IV
A
R D
B . P
O R
TE
R
E . S
A N
TO
S
A . R
IV
A
R D
A -1
B
.D W
G
A-102B
A R
C H
IT
E
C T
U R
A L F
L O
O R
P L A
N N
O T
E S
M
O D
E L
B .A
B
.B
RTA SUBMITTAL
A U
G U
S T
W
2E P
R
F O
R T
B U
C H
A N
A N
G
U A
Y N
A B
O P
U E
R T
O R
IC
O
F O
R T
B U
C H
A N
A N
F A
M
IL
Y H
O U
S
IN
G R
E P
L A
C E
M E
N T
1/4" = 1'-0"A1
FLOOR PLAN NOTES - MODEL B.A
0 1' 2' 4' 8'
1/4" = 1'-0"E7
FLEX ROOM - MODEL B.B
0 1' 2' 4' 8'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
R
E V
IS
E
D P
E R
A M
E N
D M
E N
T
O
C T
10.26.2020
ROOF DECK
110' - 0"
KITCHEN
DINING RM
LIVING - FAMILY RM
M. BDRM
AF AE AC AB AAAD
B1
A-301A
3 3
FIRST FLOOR
100' - 0"
LAUNDRY
899 9
ROOF DECK
110' - 0"
A3A4A5 A1A2
E1
A-301A
LIVING - FAMILY RM
MECH/TRASH
1. FLUID APPLIED AIR/WATER BARRIER MEMBRANE O/ R-30
(MIN) RIGID INSULATION O/ 1/2" EXTERIOR GLASS MAT
COVERBOARD O/ FLUID APPLIED ROOFING. EXTEND
ROOFING SYSTEM UP PARAPET WALL.
2. ELASTOMERIC WATERPROOF MEMBRANE BELOW SLAB.
3. DIRECT APPLIED FINISH SYSTEM AT ALL VERTICAL
WALLS, AND UNDERSIDE OF OVERHANGS.
4. SLOPE SLAB TO DRAIN AWAY FROM BUILDING.
5. MATT FOUNDATION, REF STRUCTURAL.
6. BREEZE BLOCK - 8X8X16 CMU ROTATED AT 90 DEGREES.
7. THROUGH WALL ROOF SCUPPER AND DOWNSPOUT.
8. SOLAR PHOTO VOLTAIC PANELS RE: ELECTRICAL.
9. MECHANICAL UNITS AND PIPING RE: MECHANICAL.
10. MECHANICAL ROOF EXHAUST CAP RE: MECHANICAL.
11. CABINETS, REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
SHEET KEYNOTES
D
2 3
C
A
B
SHEET ID
S O
L
IC
IT
A
T
IO
N N
O
D R
A W
N B
Y
C K
D B
Y
D E
S
IG
N B
Y
IS
S
U E
D A
T E
S B
M T
B Y
C O
N T
R A
C T
N O
S
IZ
E
"X
P R
O J E
C T
N U
M B
E R
F
IL
E N
A M
E
US Army Corps of Engineers ®
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S…
This is the start of the file's text. The full file is on GovTribe.