B.08.03_Amendment_2_Updated_Drawing_C-11.pdf

PDF 498 KB Posted

Attached to
C44 Reservoir STA Project, C44 Intake Canal Bank Stabilization ICBS, Martin County, Florida
Solicitation number
W912EP19R0013
Issued by

About this file

Updated Drawing C-11

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIPRAP AS SHOWN IN THIS DETAIL.

5. EXCAVATION OF EXISTING SLOPE REQUIRED TO INSTALL

MAY BE ADJUSTED.

PERCHED WATER TABLE, THE TOP OF RIPRAP ELEVATION

4. AT DIRECTION OF THE GOVERNMENT, IN LOCATIONS WITH A

OF WORK.

OTHER AREAS DISTURBED OR DAMAGED DURING EXECUTION

SLOPES STEEPER THAN 4:1 (H:V). REPAIR AND SEED ANY

3. REPAIR AND SOD ANY AREAS DISTURBED OR DAMAGED WITH

GEOTEXTILE.

2. REFER TO SPECIFICATIONS FOR DETAILS ON RIPRAP AND

DRAWINGS C-01 THRU C-09.

1. TOP OF BANK ELEVATION IS SHOWN ON THE GRADING

CHANNEL BANK CHUTE (BY OTHERS)

EXISTING ACBM

EXISTING GEOTEXTILE FABRIC

EXISTING ACBM

EXISTING BEDDING STONE

EXISTING ACBM

EXTEND FABRIC

TO SURFACE

STEP 2

STEP 1

GEOTEXTILE FABRIC

STONE

EXISTING BEDDING

FABRIC

EXISTING GEOTEXTILE

(12" TO 18" THICK)

INSTALL RIPRAP

FABRIC

AND GEOTEXTILE

OVERLAP

FABRIC 12"

NEW RIPRAP EXISTING RIPRAP

EXISTING RIPRAP

STEP 2

STEP 1 STONE

EXISTING BEDDING

FABRIC

GEOTEXTILE

EXISTING

FABRIC

GEOTEXTILE

EXISTING

STONE

EXISTING BEDDING

FABRIC

GEOTEXTILE

(12" TO 18" THICK)

INSTALL RIPRAP

FABRIC

AND GEOTEXTILE

RIPRAP, TYPE A

(12" TO 18" THICK )

SHEET PILE (BY OTHERS)

AT SHEET PILE)

(EXTEND TO SURFACE

GEOTEXTILE FABRIC

OVERLAP

FABRIC 12"

NEW RIPRAP

EXISTING RIPRAP

STEP 2

STEP 1

FABRIC

GEOTEXTILE

(12" TO 18" THICK)

INSTALL RIPRAP

FABRIC

AND GEOTEXTILE

FABRIC

GEOTEXTILE

EXISTING

RIPRAP

EXISTING

THICK

18" RIPRAP TYP. "A"

EXISTING GRADE

EL 3.0

EL 15.3

THICK

12" RIPRAP TYP. "A"

EXISTING GRADE

EXISTING GRADE

THICK

18" RIPRAP TYP. "A"

EL 3.0

THICK

12" RIPRAP TYP. "A"

EL 13.0

THICK

18" RIPRAP TYP. "A"

EL 13.0

FOR LOCATIONS

SEE AS-BUILT DRAWINGS

NOTE:

(ELEV. VARIES)

CANAL TOP OF BANK

TOE OF RIPRAP

OF CANAL

CENTERLINE

SOD

ELEVATION 15.3

J S

U B

M

IT

T E

R

C-11

A

C

IV

IL

-C

IC

B S -C

F .d g n

R A

V

4'

GEOTEXTILE TYPE 1

GEOTEXTILE TYPE 1

GEOTEXTILE TYPE 1

H D

R

ELEVATION 13.0

T Y

P

IC

A L S

E C

T

IO

N S A

N D D

E T

A

IL

S

GENERAL NOTES

NOT TO SCALE

RIPRAP TO SHEETPILE TRANSITION DETAIL

FILL AND SOD

CROSS SECTION DETAIL - TOE

NOT TO SCALE

A

TYPICAL CROSS SECTION - (SEE SHEETS C-01 THRU C-09)

18"±

18"±

CROSS SECTION DETAIL - TOP

WATER SURFACE ELEV. VARIES

FILL AND SOD

H D

R

C-10 NOT TO SCALE

B CHUTE TRANSITION DETAIL

RIPRAP TO ACBM

C-10 NOT TO SCALE

C

NOT TO SCALE

TRANSITION DETAIL

RIPRAP TO RIPRAP

C-10 NOT TO SCALE

D

NOT TO SCALE

DETAIL @ BOAT RAMP

RIPRAP TO RIPRAP TRANSITION

25'

R E

V

IS

E D T

O A

C C

O M

P A

N Y A

M E

N D

M E

N T

A

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

/1

/2

F

IL

E N

A M

E

D R

A W

IN

G D

A T

E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\CERP\IRL South\C-44\Intake Canal Bank Stabilization\080 - Plans\05 Civil\C-11 amend 002

M M

M M

M M

M M

M Y

Y Y

Y

N

S I

D

N /A

J A

C K

S O

N V

IL

L E D

IS

T R

IC

T

S

A N M

A R

C O B

L V

D

J A

C K

S O

N V

IL

L E F

L

M

R T

IN

C

O U

N T

Y F

L O

R

ID

A

C -4

R

E S

E R

V O

IR

/S

T A P

R O J E

C T

C -4

I

N T

A K

E C

A N

A L B

A N

K S

T A

B

IL

IZ

A T

IO

N

IC

B S

W E

P

R

File details come from the government source that posted it.