Q&A_2018-04-04.pdf
PDF 113 KB Posted
- Solicitation number
- W912EP-18-R-0032
About this file
Questions and Answers for Architect and Engineering (A-E) Services for Topographic and Hydrographic Surveying & Mapping Services to support the Jacksonville District and USACE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Soliciation_QandA_2_19APR_2018.pdf | ||
| Soliciation_QandA_19APR18.pdf | ||
| Soliciation_QandA_13APR18.pdf | ||
| Roll_Call.pdf | ||
| PreProposal_Slides.pdf | ||
| Soliciation_Q&A's_3.29.18.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architect and Engineering (A-E) Services for Topographic and Hydrographic Surveying & Mapping Services to support the Jacksonville District and USACE
Questions and Answers
Question 1:
If a firm has Corps experience, but the Contracting Officer’s Representatives (COR) are no longer available as a reference, who should the firm list as a reference?
Answer: The COR is delegated authority over a Contractor via the Contracting Officer (KO).
Therefore, the KO would be the next most reasonable point of contact.
Question 2:
Regarding the solicitation part 3 (B) Qualified Professional Personnel, the initial paragraph states the resume should show experience both past and recent (within the last five years). However, item (1) Professional Surveyor/Mapper within Prime Firm states a minimum of 10-years’ experience. Is 5-years or 10-years the requirement?
Answer: the 5-year recent experience requirement is overarching for all key roles listed under the solicitation, part B. All resumes should demonstrate 5 years of recent experience; the PSM role should demonstrate 10-years’ experience, 5-years of which should be recent. If a firm cannot meet the requirement, they are encouraged to submit what they can demonstrate for consideration.
Question 3:
There is no mention of photogrammetric requirements under this solicitation. However, my firm has photogrammatrists and experience. Should my firm submit photogrammetric qualifications?
Answer: Photogrametry personnel or experience is not a requirement for selection. Therefore, any additional information your firm chooses to include for consideration is your firm’s business decision.
Question 4:
Must the key personnel experience link back to the key projects?
Answer: No. There is no requirement in the solicitation which stipulates experience must link to key projects listed. Choosing to do so is your firm’s business decision.
Question 5:
Can we assume that the 5-year recent experience requirement listed under the solicitation part 3
(B) Qualified Professional Personnel applies to the requirement for project experience.
Answer: No, do not assume the 5-years recent experience requirement applies to anything other than the Qualified Professional Personnel.
Question 6:
Are the resumes restricted to one page?
Answer: No.
Question 7:
If a firm submits as Prime under a specific set-aside category, can that firm also be a sub-consultant to another firm submitting as Women-Owned or Service Disabled Veteran-Owned?
Answer: Yes.
Question 8:
Must key projects under A. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE be complete to be considered eligible?
Answer: Not necessarily. It’s a business decision of the offeror whether or not the submited projects are completed.
Question 9:
The following 3 questions (9a-c) refer to B. QUALIFIED PROFESSIONAL PERSONNEL:
a. Professional Surveyor
b. Topographic Surveyor
c. Hydrographic Surveyor
9a. Can we assume that the above are considered key personnel for the purposes of this solicitation? Answer: Yes
9b. How many of the above must be included?
Answer: At least one Professional Land Surveyor, a minimum of two topographic crews, and a minimum of one hydrographic crew
9c. Are there other key personnel we should include?
Answer: This is the offeror’s business decision.
Question 10:
Must the Topographic and Hydrographic Surveyors also hold professional certifications (PSM) in Florida?
Answer: No; however, if they do, it is a plus-up.
File details come from the government source that posted it.