About this file

This document is a technical drawing (Sheet F-102) for fire protection system modifications at the North Annex Emergency Operations Center located at Rock Island Arsenal in Illinois. The drawing details key fire protection infrastructure improvements, specifically including: 1) installation of new 6" fire piping and risers, 2) provision of a new fire department connection, and 3) reconnection of new fire sprinkler piping to the existing system serving the southern portion of the North Annex. The drawing is part of the W912EK25BA001 solicitation for the Mississippi River Basin project, issued by the U.S. Army Corps of Engineers Rock Island District, with the design prepared in April 2025 and marked as sheet F-102 under project code B5CLKTWR202314.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAEH

NAELA NAA

U P

S

NAELB

F

T-NA

TCPTCP

N A

L

IP

A N

S I

D

NEW CONNECTION ARSENAL WATER UTLITIY LINES

A N

S I

X

S O

L

IC

IT

A

T

IO

N

N O

R T

H A

N N

E X

E M

E R

G E

N C

Y O

P E

R A

T

IO

N S

C E

N T

E R

R O

C K

I S

L A

N D

IL

L

IN

O

IS

R O

C K

I S

L A

N D

A R

S E

N A

L

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

W E

K B

A

/0

/0

F A

D U

R O

J A

F

IR

E P

R O

T E

C T

IO

N

P L

A N

F-102

J.

F

R A

T A

M

IC

O

D N

U T

I

A P

R

N O

T E

C O

R R

E C

T

IO

N S

B

C L

K T

W R

A

A T

W E

L L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

O

IS

UP

S p e c if ic W o rk

\B

C

L K

T W

R

\B

C

L K

T W

R -C

A D

S

H E

E T

-2 -0

-2

-F

-1 .d g n

D S

A

E C

S c re e n

F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:1

:3

A

M

/8 /2

SEE REFERENCE DRAWINGS FOR LOCATION OF ARSENAL UTILITY LINES3.

ACCEPTABLE LOCATION.

QUALIFIED FIRE PROTECTION ENGINEER TO REVIEW AND DETERMINE IF

LOCATION OF THE FIRE RISER SHOWN IS THE INTENDED LOCATION. 2.

NEW WORK.

ALL ITEMS SHOWN IN HEAVY LINE WEIGHT (BOLD) ARE ITEMS IDENTIFIED AS 1.

GENERAL SHEET NOTES

KEYPLAN

SHEET KEYNOTES

SERVING SOUTHERN PORTION OF THE NORTH ANNEX

NEW FIRE SPRINKLER PIPING WILL RECONNECT TO EXISTING SYSTEM 3.

PROVIDE NEW FIRE DEPARTMENT CONNECTION.2.

PROVIDE NEW 6" FIRE PIPING AND RISERS.1.

NC

NC

File details come from the government source that posted it. Updated .