A22 - REFERENCE - 2000_JOC_CONTRACT_Clock Tower Remodel IM Office.pdf

PDF 3 MB Posted

Attached to
MISSISSIPPI RIVER BASIN, ROCK ISLAND ARSENAL, ROCK ISLAND, ILLINOIS, NORTH ANNEX EMERGENCY OPERATIONS CENTER AND DISTRICT CONFERENCE ROOMS
Solicitation number
W912EK25BA001
Issued by

About this file

This document is a comprehensive set of architectural and engineering design plans for the Clock Tower Annex Remodel project, specifically focusing on renovating the first-floor IM (Information Management) office area. The detailed plans include demolition and new construction drawings for multiple building systems, encompassing architectural, electrical, mechanical, plumbing, fire protection, and HVAC modifications.

Key scope elements include complete interior renovation of restrooms, reconfiguring office spaces, updating electrical and power systems, replacing mechanical equipment, modifying fire protection systems, and installing new plumbing infrastructure. The plans show a thorough, systematic approach to the remodel, with specific details on removing existing fixtures, walls, and equipment, and installing new components across various building systems. Technical specifications cover elements like new floor plans, ceiling layouts, electrical and lighting configurations, mechanical ductwork, piping diagrams, and comprehensive demolition and construction notes for each system.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .