A22 - REFERENCE - Remodel North End Annex N.W. Corner Clock Tower.pdf
PDF 14 MB Posted
- Attached to
- MISSISSIPPI RIVER BASIN, ROCK ISLAND ARSENAL, ROCK ISLAND, ILLINOIS, NORTH ANNEX EMERGENCY OPERATIONS CENTER AND DISTRICT CONFERENCE ROOMS Federal contract opportunity
- Solicitation number
- W912EK25BA001
About this file
This document is a detailed architectural and engineering plan for remodeling the north end and northwest corner of the Clock Tower Building, located at the U.S. Army Engineer District in Rock Island, Illinois. The comprehensive set of drawings includes demolition plans, new floor plans, electrical and mechanical systems layouts, reflective ceiling plans, wall sections, window and door details, and various technical schedules for HVAC, plumbing, fire protection, and electrical systems.
The plans cover multiple aspects of the renovation, including removing existing interior walls, installing new walls and partitions, upgrading electrical and mechanical infrastructure, replacing windows and doors, and modifying the building's basement and floor systems. The project involves intricate details such as specifying new floor beams, wall furring, cabinetry, lighting fixtures, air handling units, sprinkler systems, and electrical panel configurations. The drawings are dated 28 May 1991 and were prepared by KMW architectural and engineering firm for the U.S. Army Corps of Engineers, with a focus on comprehensive building systems renovation and modernization.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01 - BID SUMMARY SHEET_SIGNED.pdf | ||
| A20 - WR - 4-18-2025.pdf | ||
| A22 - Amend 0002 - Drawing.pdf | ||
| A22 - W912EK25BA001 - AMEND 0002.pdf | ||
| A22 - W912EK25BA001 - AMEND 0001.pdf | ||
| A22 - REFERENCE - B5CLKTWR202002-PLAN_SET_CONTRACT-2021-08-24.pdf | ||
| A22 - REFERENCE - 2000_JOC_CONTRACT_Clock Tower Remodel IM Office.pdf | ||
| A22 - REFERENCE - Replace Chiller Clock Tower bldg.pdf | ||
| A22 - REFERENCE - B5CLKTWR199804-PLAN_SET_AS-BLT-1998-09-02-TRAILERS.pdf | ||
| A22 - REFERENCE - Repair Annex Roof.pdf | ||
| A22 - REFERENCE - 2000_JOC_CONTRACT_Clock Tower Annex Upgrade HVAC.pdf | ||
| A22 - PLAN_SET_SOL-2025-03-18.pdf | ||
| A22 - SPEC_SOL-2025-03-13.pdf | ||
| A22 - W912EK25BA001 - Only.pdf | ||
| A22 - IL 20250001 - 3-21-2025.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X-1
| X-2 |
| A-1 |
| A-2 |
| A-3 |
| A-4 |
| A-5 |
| A-6 |
| A-7 |
| A-8 |
| A-9 |
| A-10 |
| A-11 |
| A-12 |
| A-13 |
| A-14 |
| S-1 |
| S-2 |
| S-3 |
| S-4 |
| S-5 |
| S-6 |
| M-1 |
| M-2 |
| M-3 |
| M-4 |
| M-5 |
| M-6 |
| M-7 |
| M-8 |
| M-9 |
| M-10 |
| M-11 |
| E-1 |
| E-2 |
| E-3 |
| E-4 |
| E-5 |
| E-6 |
| E-7 |
| E-8 |
| E-9 |
| E-10 |
| E-11 |
| E-12 |
File details come from the government source that posted it. Updated .