This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Bateman Island Causeway Removal project, issued by the US Army Engineer District Walla Walla. Amendment 0002 makes several key changes to the original solicitation (W912EF25BA017), including deleting Item 0007 for the City of Kennewick Water Intake Silt Curtain from the bid schedule and modifying the project timeline. The in-water work window is now set for 1 December 2025 through 28 February 2026, with the contractor required to complete all Causeway Removal work by 31 March 2026. Additional modifications include revisions to Sections 01 22 00 Measurement and Payment, 01 52 20.00 28 Environmental Protection, and updates to the Commencement, Prosecution, and Completion of Work clause.
The amendment updates technical specifications, particularly Section 3.4.1 on In Stream Turbidity Control, and adjusts the contract completion dates. The contractor must commence work within 10 calendar days of receiving the notice to proceed, prosecute the work diligently, and complete final cleanup and demobilization within 15 calendar days after completing the main work. The modification also references additional requirements for geospatial data and as-built surveys in Section 01 71 23.01 28 Contractor Surveys and Remote Sensing Data Collection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID OPENING Results W912EF25BA017.pdf | ||
| Solicitation Amendment W912EF25BA0170003 SF 30 w KO signature_released.pdf | ||
| Sol Amendment Yakima Delta W912EF25BA0170003 Released.pdf | ||
| Yakima Delta _Batement Island_Causeway Removal Site Visit Attendance.pdf | ||
| Amend-0002_TECHSPEC_Bateman Island Causeway Removal.pdf | ||
| Solicitation Amendment W912EF25BA0170001 released SF 30 Yakima Delta.pdf | ||
| Amend 0001 EBA017 - Tech Spec_Bateman Island Causeway Removal.pdf | ||
| Solicitation - W912EF25BA017 Yakima Delta Causeway Removal Released.pdf | ||
| 25BA017_Techcpec.pdf | ||
| 25BA017_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
Miscellaneous text in this section has been modified to:
Summary of changes for Amend -0002
Bateman Island Causeway Removal
Solicitation Number W912EF25BA017
1. Revised the following Specifications:
a. SECTION 01 22 00 MEASUREMENT AND PAYMENT
Deleted paragraph 1.8 CIN 0007 CITY OF KENNEWICK WATER INTAKE SILT
CURTAIN.
b. SECTION 01 52 20.00 28 ENVIRONMENTAL PROTECTION
Revised section 3.4.1 In Stream Turbidity Control
See revised specifications for details.
2. Revised the Bid Schedule
a. Deleted Item 0007 City of Kennewick Water Intake Silt Curtain
See revised Bid Schedule for details.
3. Revised the Special Clauses
a. Clause 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Revised sentence (1)
See revised Special Clauses and sentence below for details.
1. The contractor shall complete all work for the Causeway Removal by not later than 31 March 2026
W912EF25BA0170002
Section 00 01 10 - Table of Contents
Miscellaneous text in this section has been modified to:
Schedule of Items (Bid Schedule) Revised
Instructions to Offerors
Requirements/Clauses
Davis Bacon Wage Decisions
Technical Specifications - Attachment 1
Drawings (as listed in the Requirements section) - Attachment 2
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Item Supplies / Services Quantity Unit Unit Price Amount
City of Kennewick Water Intake Curtain Product Service Code: Y1QA Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Job
Section 00 72 00 - General Conditions
The following clauses were modified:
52.211-10Commencement, Prosecution, and Completion of Work. (Tailored)Apr 1984 hereby reads as follows:
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to
(a) commence work under this contract within calendar days after the date the Contractor receives the 10 notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the dates listed below.
In-water work window is 1 December 2025 through 28 February 2026.
(1) The Contractor shall complete all work for the Causeway Removal by not later than 31 March 2027 2026.
(2) The Contractor shall complete final cleanup and demobilization by not later than Calendar days 15 after completion of work in (1) above. See SECTION 01 71 23.01 28 CONTRACTOR SURVEYS for additional information: NAND REMOTE SENSING DATA COLLECTIO
a. Geospatial Data
b. As-Built Surveys
(End of clause)
Section 00 73 00 - Supplementary Conditions
The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN
(s) were deleted:
Inspection and Acceptance Location - W912EF - US ARMY ENGINEER DISTRICT WALLA WAL
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Place of Performance - W912EF - US ARMY ENGINEER DISTRICT WALLA WAL
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0002 |
| EffDate: 25 SEP 2025 |
| ReqNo: |
| ProjNo: 464850 |
| IssCode: W912EF |
| AdmCode: |
| IssuedBy: US ARMY ENGINEER DISTRICT WALLA WAL |
KO CONTRACTING DIVISION, 201 NORTH 3RD AVE
WALLA WALLA, WA 99362-1876
UNITED STATES
LEANNE WALLING, EMAIL: LEANNE.R.WALLING@USACE.ARMY.MIL TELEPHONE: 5095277230
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912EF25BA017 |
| SolDate: 22 SEP 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE FOR THIS AMENDMENT IS TO PROVIDE REVISED TECHNICAL SPECIFICATIONS SECTIONS 01 22 00 MEASUREMENT AND PAYMENT, 01 52 20.00 28 ENVIROMENTAL PROTECTION, REVISED BID SCHEDULE AND REVISED CLAUSE 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. |
SEE SUMMARY OF CHANGES FOR DETAILS.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
| ContNameTitle: |
| CoNameTitle: JANI C. LONG |
| ContDate: |
| CODate: 26 SEP 2025 |
File details come from the government source that posted it. Updated .