About this file

This document is an Environmental Protection section (Section 01 57 20.00 28) for the Bateman Island Causeway Removal project (Contract W912EF25BA017). The section provides comprehensive guidelines for environmental protection during construction, covering waste management, water and land resources, air quality, and cultural resource preservation. Key requirements include:

Waste Management: The contractor must develop plans for handling solid, hazardous, and universal waste, including proper disposal, containment, and tracking. Specific protocols are outlined for managing materials like batteries, light bulbs, oils, and other potentially harmful substances. Water Resources protection involves minimizing turbidity during in-stream work, preventing pollution, and implementing containment measures like silt curtains. The project requires strict adherence to federal and state environmental regulations, with mandatory submittals including an Environmental Protection Plan, Storm Water Pollution Prevention Plan, and various waste management documentation. The contractor must take precautions to prevent environmental damage, manage construction activities to minimize ecological impact, and immediately report any discoveries of historical or archaeological resources.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bateman Island Causeway Removal W912EF25BA017

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 22 00.00 28 MEASUREMENT AND PAYMENT

01 32 16.00 28 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.00 28 CONTRACTOR QUALITY CONTROL

01 51 00.00 28 TEMPORARY UTILITIES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

01 71 23.01 28 CONTRACTOR SURVEYS AND REMOTE SENSING DATA COLLECTION

DIVISION 02 - EXISTING CONDITIONS

02 24 20.00 28 WATER QUALITY MONITORING

DIVISION 31 - EARTHWORK

31 00 00.00 28 EARTHWORK

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 RETAINAGE OF PAYMENT

1.2 CLIN 0001 CLEARING AND GRUBBING

1.3 CLIN 0002 EXCAVATION AND DISPOSAL OF CAUSEWAY MATERIAL

1.4 CLIN 0003 RIPRAP

1.5 CLIN 0004 PLANTING WILLOWS

1.6 CLIN 0005 WATER QUALITY MONITORING

1.7 CLIN 0006 CONTRACTOR SURVEYS

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 28 Page 1 g4ecdbm8 Line

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 01 22 00.00 28 Page 2

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.

1.1 RETAINAGE OF PAYMENT

Retainage in the amount of 10 percent of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10 percent retainage for final submittals will start once the Contractor has earned 90 percent of the original contract value. See SECTION 01 71 23.01 28 CONTRACTOR SURVEYS AND REMOTE SENSING DATA COLLECTION for additional information.

FINAL SUBMITTALS

a. Geospatial Data.

b. As-Built Surveys.

1.2 CLIN 0001 CLEARING AND GRUBBING

Clearing and grubbing is measured for payment as a complete pay item (JOB). Payment is made at the lump sum price for CLIN 0001, "CLEARING AND GRUBBING," which price and payment is full compensation for all work required for clearing and grubbing, complete, as specified and approved.

1.3 CLIN 0002 EXCAVATION AND DISPOSAL OF CAUSEWAY MATERIAL

Excavation and disposal of causeway material is measured for payment as the number of cubic yards (CY) of in-situ material excavated, hauled and disposed of. Payment is made at the unit price for CLIN 0002, "EXCAVATION AND DISPOSAL OF CAUSEWAY MATERIAL," which price and payment is full compensation for all work required for excavation, hauling and disposal of causeway material, complete, as specified and approved. Volume is to be calculated using the Contractor's preliminary survey and the as-built survey.

1.4 CLIN 0003 RIPRAP

Riprap is measured for payment as a complete pay item (JOB). Payment is made at the lump sum price for CLIN 0003, "RIPRAP," which price and payment is full compensation for all work required for riprap placement, complete, as specified and approved.

1.5 CLIN 0004 PLANTING WILLOWS

Planting willows is measured for payment as a complete pay item (JOB).

Payment is made at the lump sum price for CLIN 0004, "PLANTING WILLOWS," which price and payment is full compensation for all work required for planting willows, complete, as specified and approved.

SECTION 01 22 00.00 28 Page 3

1.6 CLIN 0005 WATER QUALITY MONITORING

Water Quality Monitoring is measured for payment as a complete pay item (JOB). Payment is made at the lump sum price for CLIN 0005, "WATER QUALITY MONITORING," which price and payment is full compensation for all work required for water quality monitoring during in-water work, complete, as specified and approved.

1.7 CLIN 0006 CONTRACTOR SURVEYS

Contractor surveys is measured for payment as a complete pay item (JOB).

Payment is made at the lump sum price for CLIN 0006, "CONTRACTOR SURVEYS," which price and payment is full compensation for all work required for preliminary survey and as-built survey, complete, as specified and approved.

1.8 CLIN 0007 CITY OF KENNEWICK WATER INTAKE SILT CURTAIN

City of Kennewick water intake silt curtain is measured for payment as a complete pay item (JOB). Payment is made at the lump sum price for CLIN 0007, "CITY OF KENNEWICK WATER INTAKE SILT CURTAIN," which price and payment is full compensation for all work required to visually inspect the silt curtain at the city of Kennewick water intake at least once every three months for a duration of 12 months, all maintenance of the silt curtain, and removal of the silt curtain (1) year after completion of in-water work, complete, as specified and approved.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 28 Page 4

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 20.00 28

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 PUBLICATIONS

1.2.1 Applicable Regulations

1.2.2 Referenced Publications and Regulations

1.3 SUBMITTALS

1.4 DEFINITIONS

1.4.1 Discarded Material

1.4.2 Environmental Pollution and Damage

1.4.3 Environmental Litigation

1.4.4 Environmental Protection

1.4.5 Solid Waste

1.4.6 Hazardous Waste

1.4.7 Universal Waste

1.4.8 Other Regulated Waste

1.4.9 Surface Discharge

1.4.10 Waters of the United States

1.4.11 Fugitive Dust

1.5 GENERAL REQUIREMENTS

1.6 ENVIRONMENTAL PROTECTION PLAN

1.6.1 Compliance

1.6.2 Contents

1.7 ENVIRONMENTAL REVIEW OF CONTRACT VARIATIONS

1.8 NOTIFICATION

1.9 PRESERVATION AND RECOVERY OF HISTORICAL, ARCHAEOLOGICAL AND

CULTURAL RESOURCES

1.10 QUARRY OR SOIL SOURCE

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 STORM WATER CONSTRUCTION GENERAL PERMIT

3.1.1 Storm Water Pollution Prevention Plan

3.1.2 Notice of Intent

3.1.3 Inspections

3.1.4 Permit Termination Procedure

3.2 WASTE HANDLING AND DISPOSAL

3.2.1 Solid Wastes

3.2.2 Hazardous Waste Handling Plan

3.2.3 Disposal of Hazardous Waste

3.2.4 Universal Waste Disposal

3.2.5 Fuel And Lubricants

3.2.6 Wastewater

SECTION 01 57 20.00 28 Page 1

3.3 LAND RESOURCES

3.3.1 Work Area Limits

3.3.2 Landscape

3.4 WATER RESOURCES

3.4.1 In-Stream Turbidity Control

3.4.2 Washing and Curing Water

3.4.3 Excess Material Deposits

3.5 AIR RESOURCES

3.5.1 Fugitive Dust

3.5.2 Ozone depleting substances (ODS)

3.5.3 Burning

3.6 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES

3.7 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

SECTION 01 57 20.00 28 Page 2

SECTION 01 57 20.00 28

ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 GENERAL INFORMATION

This SECTION covers preventing environmental pollution and minimizing environmental degradation during and as a result of construction operations. Other requirements in the Technical Sections may also contain specific requirements for environmental protection. Those specific requirements are in addition to or modify the requirements in this SECTION. The control of environmental pollution requires consideration of sound levels, air, water, and land resources.

1.2 PUBLICATIONS

1.2.1 Applicable Regulations

Prevent, abate, and control all environmental pollution, and minimize environmental degradation by complying with all applicable Federal, State, and local laws and regulations, as well as specific requirements of this Contract. Where conflicting or duplicate regulations apply, the most stringent requirement governs. Comply with the most current version of the environmental regulations at time of contract Solicitation where applicable.

1.2.2 Referenced Publications and Regulations

The publications and regulations listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Occupational Health Requirements

Comply with the current edition and all changes posted on the web as of the effective date of this solicitation.

WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1

ASTM INTERNATIONAL (ASTM)

ASTM D5864 (2011) Standard Test Method for Determining Aerobic Aquatic Biodegradation of Lubricants or Their Components

U.S. National Archives and Records Administration (NARA)

29 CFR 1910.1001 OSHA General Industry - Asbestos

29 CFR 1910.1200 OSHA General Industry - Hazard Communication

SECTION 01 57 20.00 28 Page 3

29 CFR 1910.120 OSHA General Industry - Hazardous Waste Operations and Emergency Response

(HAZWOPER)

29 CFR 1926.1101 OSHA Construction - Asbestos

29 CFR 1926.65 OSHA Construction - Hazardous Waste Operations and Emergency Response

(HAZWOPER)

33 CFR 328 Definition of Waters of the United States

40 CFR 112 Oil Pollution Prevention

40 CFR 122 EPA Administered Permit Programs: The National Pollutant Discharge Elimination System

40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)

40 CFR 763 Toxic Substances Control Act (TSCA) - Asbestos

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 171-178 Transportation of Hazardous Materials Regulations

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 RCRA Standards Applicable to Transporters of Hazardous Waste

40 CFR 273 Standards for the Management of Universal Waste - light bulbs, batteries, mercury switches

40 CFR 279 Standards for the Management of Used Oil

40 CFR 302 Comprehensive Environmental Response Compensation and Liability Act (CERCLA) - Hazardous Substance Spill Reporting Requirements: Asbestos, PCBs, etc.

SECTION 01 57 20.00 28 Page 4

40 CFR 355 Emergency Planning and Notification

40 CFR 61 National Emission Standards for Hazardous Air Pollutants (NESHAP) - Asbestos

40 CFR 68 Chemical Accident Prevention Provisions

40 CFR 82 Protection of Stratospheric Ozone - Refrigerant and SF6 Gas

49 CFR 178 Specifications for Packagings

WASHINGTON STATE ADMINISTRATIVE CODE (WAC)

WAC 173-303 Dangerous Waste Regulation

WAC 173-400 General Standard for Maximum Emissions

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. The designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Environmental Protection Plan ; G, ECC

Storm Water Pollution Prevention Plan ; G, ECC

Notice of Intent for a Construction General Permit; G, ECC

In-Stream Turbidity Control ; G, ECC

SD-11 Closeout Submittals

Notice of Termination ; G, ECC

1.4 DEFINITIONS

1.4.1 Discarded Material

The term "discarded material", as used herein, is any material that is abandoned, recycled, or considered "inherently waste-like" as described in

40 CFR 260

1.4.2 Environmental Pollution and Damage

The term "environmental pollution and damage", as used herein, is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally, and/or historically.

SECTION 01 57 20.00 28 Page 5

1.4.3 Environmental Litigation

The term "environmental litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect work has on the environment.

1.4.4 Environmental Protection

The term "environmental protection", as used herein, is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air;

biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.4.5 Solid Waste

The term "solid waste", as used herein, is any discarded material that is not excluded under 40 CFR 261 .4(a) or that is not excluded by a variance granted under 260.30 and 260.31 or that is not excluded by a non-waste determination under 260.30 and 260.34.

1.4.6 Hazardous Waste

The term "hazardous waste", as used herein, is a Solid Waste that is not excluded from regulation under 40 CFR 262 .11, but is either:

a. A listed waste under subpart D of 40 CFR 261 or;

b. A characteristic waste as described in subpart C of 40 CFR 261 or;

c. A Washington State Dangerous Waste as defined in WAC 173-303 -100.

1.4.7 Universal Waste

The term "universal waste", as used herein, is any of the following Hazardous Wastes that are subject to the universal waste requirements of 40 CFR 273 , or WAC 173-303 -573:

a. Used batteries that designate as hazardous waste including; lead acid batteries, lithium ion batteries, nickel-cadmium batteries, alkaline batteries, etc.

b. Used light bulbs that designate as hazardous waste including;

florescent bulbs, compact florescent bulbs, sodium vapor lamps, mercury vapor lamps, etc.

c. Used mercury containing material which is a device or part of a device that contains elemental mercury integral to its function including; thermostats, thermometers, electrical switches, etc.

1.4.8 Other Regulated Waste

The term "other regulated waste", as used herein, is a solid waste that is not a hazardous waste, but is still regulated by federal and state laws for transportation and/or disposal. The types of waste in this category include, but are not limited to: asbestos, PCB contaminated waste, used

SECTION 01 57 20.00 28 Page 6 oil, oily water, anti-freeze, refrigerants and compressed gasses.

1.4.9 Surface Discharge

The term "surface discharge", as used herein, implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge the water from the governing agency under 40 CFR 122.26 .

1.4.10 Waters of the United States

The term "waters of the United States (U.S.)", as used herein, include all waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328 .

1.4.11 Fugitive Dust

The term "fugitive dust", as used herein, is particulate matter that is generated or emitted from open air operations (emissions that do not pass through a stack or vent). Particulate matter consists of solid particles and liquid droplets suspended in the air. These small airborne particles have the potential to adversely affect human health or the environment.

1.5 GENERAL REQUIREMENTS

Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the worksite boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this Contract.

Comply with all applicable Federal, State, and local environmental laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations is the Contractor's responsibility.

1.6 ENVIRONMENTAL PROTECTION PLAN

Prior to commencing construction activities or delivery of materials to the site, submit an Environmental Protection Plan (EPP) for review and approval by the Contracting Officer. Submit the Environmental Protection Plan no later than 30 calendar days prior to the start of on-site work.

The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which shall be addressed during construction. Define issues of concern within the Environmental Protection Plan as outlined in this SECTION. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Identify and discuss topics or issues which are not identified in this SECTION, but which is considered necessary, after those items formally identified in this SECTION. The Environmental Protection Plan shall be current and maintained on site.

1.6.1 Compliance

No requirement in this SECTION relieves the Contractor of any applicable Federal, State, and local environmental protection laws and regulations.

During construction, identify, implement, and submit for approval any additional requirements to be included in the Environmental Protection Plan.

SECTION 01 57 20.00 28 Page 7

1.6.2 Contents

The Environmental Protection Plan (EPP) shall include, but not be limited to, the following:

a. Name(s) and phone numbers of individual(s) within the Contractor's organization responsible for ensuring adherence to the Environmental Protection Plan.

b. Description of the Contractor's environmental protection personnel training program.

c. Contractor's process for immediately notifying the Contracting Officer, onsite Construction Representative and Walla Walla District Environmental Compliance Coordinator (ECC) of any spills. The Contractor is responsible for all spill notifications to regulatory agencies (Federal, State, and local). This plan will include the contact information for Federal, State, and local agencies. In the event of a spill, provide a copy of the notification reports to the Contracting Officer and ECC.

d. Solid Wastes Management Plan

1. Solid waste is as defined in 40 CFR 261 . The EPP shall describe how solid wastes will be picked up and placed in covered containers which are emptied regularly.

2. Housekeeping measures to prevent contamination of the site or other areas when handling and disposing of solid waste.

3. Management of spent hazardous material shall be described in the Hazardous Waste Handling Plan.

e. Hazardous Waste Handling Plan that complies with all Federal, State, and local laws or regulations that pertain to generation, storage, and transportation of hazardous materials: 40 CFR 260 -

40 CFR 263 , WAC 173-303 -100, 49 CFR 171-178 , 29 CFR 1910.120 /

29 CFR 1926.65 . This includes the handling of such hazardous materials as hazardous wastes (including but not limited to, aerosol cans, waste paint, cleaning solvents, contaminated brushes, and used rags) if applicable. The Contractor shall prepare and submit a compliance plan detailing how the Contractor handles hazardous materials, petroleum products, and hazardous waste personnel qualifications. The plan shall include all the elements specified in Part 3 EXECUTION as applicable.

f. Fugitive dust control plan.

g. Used Oil Management plan for any used oil to be transported off-site in accordance with 40 CFR 279 , WAC 173-303 -515.

h. Universal Waste Management and Disposal plan for light bulbs, batteries and mercury ampules in accordance with 40 CFR 273 , WAC 173-303 -573.

i. Wastewater management plan that identifies the methods and procedures for management and/or discharge of wastewaters which are directly derived from construction activities, such as concrete curing water, clean up water, dewatering of ground water, disinfections water, hydrostatic test water, and water used in flushing of lines.

SECTION 01 57 20.00 28 Page 8

Wastewater will not be disposed of on government property or into waters of the U.S.

j. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.

1.7 ENVIRONMENTAL REVIEW OF CONTRACT VARIATIONS

Any proposed Contractor methods or requested variations from the specifications and drawings that may have an environmental impact will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods OR VARIATIONS, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method OR VARIATION will have an unacceptable adverse environmental impact.

1.8 NOTIFICATION

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State, or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental Protection Plan. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed to the Contractor for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the Contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

1.9 PRESERVATION AND RECOVERY OF HISTORICAL, ARCHAEOLOGICAL AND CULTURAL

RESOURCES

A Government Archaeologist may monitor excavation during construction activities. If the Contractor and/or Government Archaeologist observes items that might have historical or archaeological value, such observations shall be reported immediately to the Contracting Officer so that appropriate authorities may be notified. A determination will then be made by the Contracting Officer as to their significance and what; if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in the destruction of these resources and shall prevent their employees from trespassing on, removing, or otherwise damaging such resources.

1.10 QUARRY OR SOIL SOURCE

All earthwork material brought from off-site shall be from an established commercial quarry or soil source.

SECTION 01 57 20.00 28 Page 9

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 STORM WATER CONSTRUCTION GENERAL PERMIT

If construction activities will disturb one or more acres of land and there is potential for storm water runoff to enter surface waters of the U.S., the Contractor shall comply with the requirements found on the U.S.

EPA website at:

https://www.epa.gov/npdes/epas-2017-construction-general-permit-cgp-and-related-documents

3.1.1 Storm Water Pollution Prevention Plan

Prior to commencing construction activities, prepare a Storm Water Pollution Prevention Plan (SWPPP) and submit it for review and approval by the Walla Walla District Environmental Compliance Coordinator (ECC). A copy of the approved SWPPP must be retained at the construction site from the date of commencement of construction activities to the date of final stabilization.

3.1.2 Notice of Intent

The Contractor shall prepare and submit a Notice of Intent (NOI), using the electronic CGP submission system to EPA, the certifying authority. The NPDES eReporting Tool at:

https://npdes-ereporting.epa.gov/net-cgp/action/login

The NOI submittal deadline is at least 14 calendar days before commencing construction activities. The permit authorization date is 14 calendar days after EPA notification that they have received a complete NOI. Submit a copy of the certifying authority's acknowledgement of receipt of the NOI prior to the commencement of construction activities.

3.1.3 Inspections

The Contractor shall be responsible for conducting construction activities in accordance with the approved SWPPP and for performing any required inspections and completing inspection reports.

3.1.4 Permit Termination Procedure

The Contractor shall submit a Notice of Termination (NOT) using EPA's NPDES eReporting Tool (NeT). To access NeT, go to:

https://npdes-ereporting.epa.gov/net-cgp/action/login .

3.2 WASTE HANDLING AND DISPOSAL

Dispose of wastes as directed below, unless otherwise specified and/or shown on the Drawings:

3.2.1 Solid Wastes

Provide waste receptacles. Place solid wastes in Contractor-provided containers which are emptied or removed from the job site on a regular schedule. Conduct handling, storage, and disposal to prevent

SECTION 01 57 20.00 28 Page 10 contamination. Employ segregation measures so that no hazardous waste will become co-mingled with solid waste. Transport solid waste off Government property and dispose of it in compliance with applicable Federal, State, and local requirements for solid waste disposal. A Subtitle D Resource Conservation and Recovery Act (RCRA) permitted landfill shall be the minimum acceptable off-site solid waste disposal option. Verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate. Comply with applicable Federal, State, and local laws and regulations pertaining to the use of landfill areas.

3.2.2 Hazardous Waste Handling Plan

The Contractor is required to comply with all Federal, State, and local laws or regulations when handling hazardous materials. This includes the handling of such hazardous materials as hazardous wastes if applicable.

The Contractor shall prepare and submit a compliance plan detailing how the Contractor handles hazardous materials, petroleum products, and hazardous waste. The plan includes, but is not limited to, the following elements as appropriate:

a. General storage site plan.

b. An inventory of all hazardous materials brought onto the worksite accompanied by their respective Safety Data Sheets (SDS). The Contractor and the Government will jointly maintain the SDSs for all hazardous materials in accordance with 29 CFR 1910.1200 .

c. A list of all anticipated hazardous wastes to be generated.

d. Waste collection and containment procedures in accordance with applicable Federal, State, and local laws or regulations 40 CFR 262 , WAC 173-303 -200.

e. A hazardous material spill and cleanup plan, including tools and readily available materials on hand to facilitate containment and cleanup, 29 CFR 1910.120 / 29 CFR 1926.65 .

f. Documentation to show that the person handling hazardous waste or sampling hazardous materials is trained and certified to do so.

g. A waste determination plan that includes a sample analysis plan, or process knowledge, that meets Federal and State requirements for hazardous waste designation 40 CFR 261 , WAC 173-303 -100.

h. Provisions to coordinate with the Walla Walla District ECC for profiling and disposal of all Hazardous Waste. The Walla Walla District ECC must be present to sign the Uniform Hazardous Waste Manifest for all Hazardous Waste shipped off of the construction site.

i. Demobilization plan that describes how the contractor will ensure no expired, used, or unused products are left on site.

3.2.3 Disposal of Hazardous Waste

The Contractor shall coordinate with the Walla Walla District ECC for the disposal of all hazardous waste. The following shall apply for all Hazardous Waste:

SECTION 01 57 20.00 28 Page 11

a. Hazardous waste generated at the project is required to be applied to the project's generator status. An inventory sheet of all materials being placed in a hazardous waste package shall be maintained and a copy provided to the Walla Walla District ECC.

Required information on this inventory sheet is: date placed in package, type of material, quantity, name of person disposing of waste.

b. Contractor shall coordinate with Walla Walla District ECC to determine proper container type and marking requirements in accordance with 49 CFR 178 prior to the generation of any hazardous waste. The Walla Walla District ECC will designate a Satellite Accumulation Area (SAA) for the Contractor to use while generating hazardous waste.

c. When the Contractor is done filling the hazardous waste container or when 55-gallons of waste have been accumulated, the Contractor shall inform the Contracting Officer, who will notify the Walla Walla District ECC. The Walla Walla District ECC will then arrange for movement of the waste to a designated Government "less than 90-day" hazardous waste storage area (could be "less than 180-day" storage area depending on the generator status at the project, see the ECC for specific guidance), 40 CFR 262 , WAC 173-303 -200.

d. Contractor shall coordinate with the Walla Walla District ECC to expedite off site shipment of hazardous waste. If, for any reason, the hazardous waste cannot be shipped off-site in "less than 90-days" the Contracting Officer and Walla Walla District ECC shall be notified immediately. Walla Walla District ECC will be required to sign all waste shipping records. The cost of disposal is the responsibility of the Contractor.

e. Contractor shall not abandon or otherwise leave any hazardous materials or hazardous waste on government projects.

3.2.4 Universal Waste Disposal

Dispose of all used batteries, light bulbs, and elemental mercury ampules in accordance with Federal and State regulations, 40 CFR 273 , WAC 173-303 -573.

a. All batteries shall have the terminals taped to secure from arcing prior to being placed in the Used Battery Container. Container shall be labeled with the words "Used Batteries".

b. Used light bulbs that would otherwise be regulated as hazardous waste (i.e. florescent bulbs, mercury or sodium vapor, HID, etc.)

shall be stored in a manner that minimizes breakage. Container shall be labeled with the words "Used Bulbs" or "Used Lamps".

c. Mercury switches or other small ampules of elemental mercury shall be stored in a manner which prevents breakage. Container shall be closed and labeled with the words "Used Mercury-Containing Equipment".

3.2.5 Fuel And Lubricants

a. Conduct storage, fueling, and lubrication of equipment and motor vehicles in a manner that affords the maximum protection against spill and evaporation.

SECTION 01 57 20.00 28 Page 12

b. Manage and store fuel, lubricants, and oil in accordance with all Federal, State, Regional, and local laws and regulations.

c. Store used lubricants and used oil to be discarded in marked, corrosion-resistant containers and recycle or dispose of in accordance with 40 CFR 279 , Used Oil regulations.

d. Coordinate with Walla Walla District ECC for profiling and disposal of all Fuel and Lubricants to include Oil.

e. Storage of fuel on the worksite shall be in accordance with all Federal, State, and local laws and regulations and within a controlled chain-link-fenced secure area.

f. Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, and waste washings from entering public lands or waters. Provide and utilize the following prevention/cleanup materials during the course of this contract:

1. If the fuel dispensing or storage tanks are not double walled, Contractor shall utilize secondary containment. All secondary containment shall be capable of containing a minimum of 100 percent of the holding tank without release plus free board in compliance with 40 CFR 112 .

2. Emergency spill kits shall be immediately available to enable rapid cleanup with sufficient quantities and types of spill control materials to contain any spills that can be anticipated.

Contractor shall be responsible for ascertaining the types/quantities of spill equipment required based on types and quantities of chemicals, petroleum, oils, and lubricants, they will use and/or what they will be working on.

3. Emergency spill absorbent mats (10-18" x 18" or appropriately sized) shall be carried on board or be in the immediate vicinity of all equipment performing work. Mats shall be of a quilted cotton pillow design, and absorbent (not adsorbent) filled, to encapsulate hydrocarbons (oils, coolants and solvents).

3.2.6 Wastewater

Do not allow wastewater from construction activities (such as on-site material processing, concrete curing, foundation and concrete clean up, water used in concrete trucks, forms, etc.) to enter surface waters or to be discharged to the ground without first applying for and receiving authorization from the EPA (surface waters)or a state authority (ground waters). Wastewater shall be collected and disposed off-Government property in accordance with all Federal, State, and local regulations.

3.3 LAND RESOURCES

Confine all activities to areas defined by the Drawings and Specifications. Prior to the beginning of any construction, identify any land resources to be preserved within the work area. Land resources include trees, shrubs, vines, grasses, topsoil, and landforms. Do not remove, cut, deface, injure, or destroy land resources without approval, except in areas indicated on the drawings or specified to be cleared. Do not fasten or attach ropes, cables, or guys to any trees for anchorage unless specifically authorized. Provide effective protection for land and

SECTION 01 57 20.00 28 Page 13 vegetation resources at all times as defined in the following subparagraphs. Remove stone, soil, or other materials displaced into uncleared areas. Minimize ground disturbance on Bateman Island.

3.3.1 Work Area Limits

Prior to commencing construction activities, mark the areas that need not be disturbed under this Contract. Mark or fence isolated areas within the general work area which are not to be disturbed. Protect monuments and markers before construction operations commence. Where construction operations are to be conducted during darkness, any markers shall be visible in the dark. Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects.

3.3.2 Landscape

Trees, shrubs, vines, grasses, landforms, and other landscape features indicated and defined on the Drawings to be preserved shall be clearly identified by marking, fencing, wrapping with boards, or any other approved techniques. Restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.

3.4 WATER RESOURCES

Monitor all water areas affected by construction activities to prevent pollution of surface and ground water. The Contractor shall be responsible for compliance with applicable Federal and State water quality standards and the conditions of any permits and clearances obtained for the work. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated. No water courses shall be polluted by, or have existing pollution contributed to with, any petroleum products, fuels, oils, lubricants, bitumen, sandblast grit, paint chips, calcium chloride, insecticides, herbicides, or other toxic materials harmful to life.

Chemical emulsifiers, dispersants, coagulants, or other cleanup compounds shall not be used without prior written approval.

3.4.1 In-Stream Turbidity Control

Prepare and submit a plan for in-strem turbidity control including containment measures such as slit curtains. During in-water work, use the following BMPs to minimize in-stream turbidity:

a. Sequence/Phasing of work - Schedule work activities to minimize in-water disturbance and duration of in-water disturbances.

b. Bucket control - To minimize turbidity, complete all in-stream digging passes by excavation machinery and placement of fill in-stream using a bucket. Implement practicable techniques such as employing an experienced equipment operator; not dumping partial or full buckets of material back into the wetted stream; adjusting the volume, speed, or both of the load; or by using a closed-lipped environmental bucket.

c. Do not drive machinery into the flowing channel.

d. Place excavated material so that it is isolated from the water edge or wetlands and not where it could re-enter waters of the state uncontrolled.

SECTION 01 57 20.00 28 Page 14

e. Implement and properly maintain containment measures such as silt curtains, geotextile fabric, and silt fence in order to minimize in-stream sediment suspension and resulting turbidity.

f. Implement and properly maintain a silt curtain at the city of Kennewick water intake, as to minimize in-stream sediment suspension of fine silts and clays. The silt curtain is to be placed far enough from the water intake to minimize impact to it.

3.4.2 Washing and Curing Water

Do not allow water used in embankment material processing, aggregate processing, concrete curing, foundation and concrete cleanup, equipment washing, and other waters to enter any water course without prior treatment and without approval.

3.4.3 Excess Material Deposits

Do not allow deposit of any materials, effluents, trash, garbage, oil, grease, chemicals, or other contaminants in areas adjacent to streams. If any unwanted material is dumped in unauthorized areas, remove the material and restore the area to a condition approximating the adjacent undisturbed area. Excavate, remove, and restore the contaminated ground area as directed by the Contracting Officer.

3.5 AIR RESOURCES

Equipment operation, activities, or processes performed shall be in accordance with all Federal and State air emission and performance laws and standards.

3.5.1 Fugitive Dust

The owner or operator of a source or activity that generates fugitive dust must take reasonable precautions to prevent dust from becoming airborne and must maintain and operate the source to minimize emissions in accordance with all Federal and State air regulations.

3.5.2 Ozone depleting substances (ODS)

Only EPA certified technicians will be allowed to repair or service ODS equipment. No person maintaining, servicing, repairing or disposing of appliances may knowingly vent or otherwise release into the environment any Class I or Class II substance used as a refrigerant. Section 608 of the Clean Air Act extended the prohibition on venting to substitute refrigerants, including hydrofluorocarbon (HFC) and perfluorinated compounds (PFC) refrigerants. Furthermore, the equipment used to recover refrigerant from appliances must be EPA certified.

3.5.3 Burning

Burning is prohibited at the work location.

3.6 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES

If, during excavation or other construction activities, any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, temporarily suspend all activities that may damage or alter such resources. Resources covered by this paragraph

SECTION 01 57 20.00 28 Page 15 include but are not limited to: any human skeletal remains or burials;

artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, paving, wall, or other constructed features; and any indication of agricultural or other human activities. Upon such discovery or find, immediately notify the Contracting Officer so that the appropriate authorities may be notified and a determination made as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources.

3.7 POST CONSTRUCTION CLEANUP

Clean up all areas used for construction in accordance with Contract Clause 52.236-12, CLEANING UP.

-- End of Section --