W912EF21B0015-0004.pdf
PDF 524 KB Posted
- Attached to
- MNA Intake Deck Concrete Beam Rehab Federal contract opportunity
- Solicitation number
- W912EF21B0015
About this file
This solicitation package provides details for a federal contract opportunity to repair concrete beams on the intake deck of McNary Lock and Dam. The scope of work involves determining the amount of concrete and rebar needed to increase the capacity of 48 support beams underneath the intake deck, and constructing the enlarged sections using a form and pump methodology with positive pressure maintained throughout curing. Interested offerors must submit supporting documentation for the designer of record and installer to demonstrate four qualifying projects in the last ten years of similar scope. The apparent low bidder will also need to provide financial and reference information, as well as a subcontracting plan with their bid. The solicitation number is W912EF21B0015 and was issued by the Department of the Army Corps of Engineers Walla Walla District for a project to rehabilitate the concrete beams at McNary Intake Deck.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF21B0015 Bid opening Results 572021.pdf | ||
| TechSpec_21B0015_Amend-0004.pdf | ||
| W912EF21B0015-0003 MNA Intake Deck Beam.pdf | ||
| TechSpec_21B0015_Amend-0003.pdf | ||
| W912EF21B0015-0002 -42721.pdf | ||
| TechSpec_21B0015_Amend-0002_27Apr21.pdf | ||
| 21B0015_AMDT00002_Plans.pdf | ||
| MNA-Intake Deck Beam 21B0015 Attendee list.pdf | ||
| W912EF21B0015-0001.pdf | ||
| TechSpec_21B0015_Solicitation Final.pdf | ||
| 21B0015_Plans.pdf | ||
| W912EF21B0015 MNA Intake Deck concrete Beam Rehab .pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to update a paragraph in the Attention to Bidders - DRC instructions to remove unrelated details to this project, update SECTIONS 01 57 20.00 28 ENVIRONMENTAL PROTECTION, b.SECTION 03 01 00.02 28 FORM AND PUMP PLACEMENT clarifying EPOXY testing and installation information, and SECTION 00 73 00 SUBCONTRACTING PLAN minor updates. Please see summary of changes for further details.
All other terms and conditions remain unchanged.
Please see summary of changes for further details.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21B0015
X 9B. DATED (SEE ITEM 11)
07-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2021
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
LEANNE WALLING
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
SUMMARY OF CHANGES AMEND #4
Summary of changes for Amend – 0004 McNary Powerhouse Intake Deck Concrete Beam Repair
1. Revised the following Specifications (See revised specification for details):
a. SECTION 01 57 20.00 28 ENVIRONMENTAL PROTECTION
Revised Paragraph 1.6 ENVIRONMENTAL PROTECTION PLAN.
b. SECTION 03 01 00.02 28 FORM AND PUMP PLACEMENT Revised Paragraph 1.8 QUALIFICATION FOR EPOXY REINFORCING
INSTALLERS.
Revised Paragraph 3.5 POST-INSTALLED EPOXY ADHESIVE
INSTALLATION.
Added Paragraph 3.5.1 “Epoxy Adhesive Installation”.
Added Paragraph 3.5.2 “Direct Pull Testing”.
2. Definitive Responsibility Criteria (DRC):
Minor edits removing unrelated details in last paragraph.
3. SECTION 00 73 00 SUBCONTRACTING PLAN
Minor edits removing “proposal” and replacing with “bid” for instructional clarification.
The following have been modified:
ATTENTION TO BIDDERS
1. Responsibility Criteria IAW FAR Subpart 9.1: To ensure award is made to the responsible bidder, a determination of responsibility will be conducted. As part of this responsibility determination, the Contracting Officer will utilize the guidance contained in FAR Subpart 9.1, Responsible Prospective Contractors. In accordance with FAR 9.104-1, to be determined responsible, a prospective contractor must:
(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see form below);
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record, similar in scope and magnitude of that stated in the contract requirements;
(d) Have a satisfactory record of integrity and business ethics;
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them;
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
2. ATTENTION: Definitive Responsibility Criteria (DRC): In addition to examining the criteria in FAR
9.104-1 as listed above, the Contracting Officer will also examine whether the low bidder can meet the requirements of the definitive responsibility criteria mentioned in sections a through d below. THIS INFORMATION WILL BE REQUESTED AFTER BID OPENING. The apparent low bidder will be required to meet the following experience requirements:
Definitive Responsibility Criteria (DRC) we could use for this acquisition:
(a) The designer of record must be a registered Professional Engineer (P.E.) or Structural Engineer (S.E.), licensed to practice design of concrete section enlargement to increase structural capacity for concrete elements. The designer of record must provide (4) projects successfully designed in the last (10) years that demonstrates design experience on projects of similar scope. Similar scope for design means projects that increase shear capacity for concrete members to include: elevated concrete slabs, elevated concrete beams, concrete columns, bridge segments, bridge decks, precast bridge girders, and/or cast in place bridge beams. Submit copies of the P.E. and/or S.E. licenses of designers.
(b) The installer must provide (4) projects successfully completed in the last (10) years that demonstrates installation experience on projects of similar scope. Similar scope for installation means projects that enlarge concrete structural elements using self-consolidating concrete placed by form and pump methodology where positive pressure is applied and maintained in an enclosed formwork system throughout the curing process.
3. The Contracting Officer will verify the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of the bid. Instead, the Government will request the supporting documentation within a reasonable timeframe after bid opening and the apparent low bidder will be expected to provide the DRC information within two (2) business days after the Government's request
4. Along with the Definitive Responsibility Criteria above, the apparent low bidder will be required to provide the following information for the Government’s use in the determination of Bidder(s) responsibility (See 1
(a) above).
a) Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.
b) The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (If you are the apparent low bidder, please contact your bank reference to let him/her know our office will be calling for financial information.)
Bank Institution ________________________________
Telephone Number ______________________________
Contact ________________________________________
Email Address __________________________________
Tax Identification Number ________________________
c) List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list)
Will performance of the present work inhibit your ability to perform this contract? ___________
Offeror’s email address: ____________________________________
Please return completed information listed above with all attachments copies of education and experience credentials including examples of fish sampling permits and reports that document Definitive Responsibility Criteria information from #2 above to: When requested return completed information listed above with all attachments and Definitive ResponsibilityCriteria information from #2 above to:
Email: Leanne.R.Walling@usace.army.mil
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
SPECIAL INSTRUCTIONS
INVOICES/PAYMENT REQUESTS
Invoices/payment requests must be submitted to Corps of Engineers, Walla Walla District, Attention: Construction Branch, 201 N. Third Ave., Walla Walla, WA 99362.
BONDS: If the successful offeror, upon acceptance of its offer by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed payments bonds or alternate payment protection within 5 Calendar days after receipt of the contract award forms by the offeror, the Contracting Officer may terminate the contract for default/cause.
SUBCONTRACTING PLAN
ALL LARGE BUSINESS OFFERORS MUST SUBMIT A SUBCONTRACTING PLAN WITH THEIR
PROPOSAL BID. THE SUBCONTRACTING PLAN MUST BE REVISED AND INCLUDED WITH ANY
SUBSEQUENT PROPOSAL BID REVISION(S), as applicable. See Section 00 70 00, Federal Acquisition Regulation Clause 52.219-9, Small Business Subcontracting Plan. For information on the evaluation of subcontracting plans, see Army Federal Acquisition Regulation Supplement, Appendix DD
(End of Summary of Changes)