W912EF21B0015-0002 -42721.pdf
PDF 411 KB Posted
- Attached to
- MNA Intake Deck Concrete Beam Rehab Federal contract opportunity
- Solicitation number
- W912EF21B0015
About this file
This amendment modifies a solicitation for the McNary Powerhouse Intake Deck Concrete Beam Repair project. The scope of work involves determining the amount of concrete and rebar needed to enlarge 48 existing support beams underneath the intake deck and constructing the enlarged sections using form and pump placement. Key details include revising technical specifications and drawings, updating submittal requirements and safety plans, restricting contractor vessel access in the forebay boat zone from February 15 to June 15 and October 1 to November 15, and requiring all onsite work to be completed between June 15 and November 30, 2021. Final clean-up and demobilization must be finished within 15 days of completion, and closeout submittals such as as-built drawings and record drawings are due 30 days after project completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF21B0015 Bid opening Results 572021.pdf | ||
| W912EF21B0015-0004.pdf | ||
| TechSpec_21B0015_Amend-0004.pdf | ||
| W912EF21B0015-0003 MNA Intake Deck Beam.pdf | ||
| TechSpec_21B0015_Amend-0003.pdf | ||
| TechSpec_21B0015_Amend-0002_27Apr21.pdf | ||
| 21B0015_AMDT00002_Plans.pdf | ||
| MNA-Intake Deck Beam 21B0015 Attendee list.pdf | ||
| W912EF21B0015-0001.pdf | ||
| TechSpec_21B0015_Solicitation Final.pdf | ||
| 21B0015_Plans.pdf | ||
| W912EF21B0015 MNA Intake Deck concrete Beam Rehab .pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to update technical specifications SECTIONS: 00 01 15.00 28 List of Draw ings, 01 14 00.10 28 PROJECT SITE RESTRICTIONS, 01 33 00 SUBMITTAL PROCEDURES, 01 35 29.10 28 GOVERNEMNTAL SAFETY REQUIREMENTS, 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS, 03 01 00.01 28 CONCRETE SECTION ENLARGEMENT and SECTION 03 01 00.02 28 FORM AND PUMP PLACEMENT. Also included are revised draw ings, SHEET G-002, SHEET S-301 and added Sheet R-036. Additionally, updates to clause 52.211-10 COMMENCEMENT, PROSECUTIONS, AND COMPLETION OF WORK is included. See summary of changes for further details.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21B0015
X 9B. DATED (SEE ITEM 11)
07-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Apr-2021
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
LEANNE WALLING
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF21B0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The performance payment bonds calendar days has decreased by 5 from 10 to 5.
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
SUMMARY OF CHANGES #0002
Summary of changes for Amend -0002 McNary Powerhouse Intake Deck Concrete Beam Repair
1. Revised the following Specifications (See revised specification for details):
a. SECTION 00 01 15.00 28 LIST OF DRAWINGS
Revised Paragraph 1.2 CONTRACT DRAWINGS.
Revised Paragraph 1.3 RESOURCE DRAWINGS (R).
b. SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS
Added Paragraph 1.3 BOAT RESTRICTED ZONE POLICY (BRZ).
Added Paragraph 1.3.1 “General”.
Added Paragraph 1.3.2 “Moorage of Contractor Vessels in the BRZ”.
Renumbered Paragraphs.
Added “Boat Restricted Zone (BRZ) Policy” Attachment.
c. SECTION 01 33 00 SUBMITTAL PROCEDURES
Updated Submittal Register.
d. SECTION 01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS Revised Paragraph 1.3 SUBMITTALS.
Revised Paragraph 1.7.2.3 “Critical Lift Plan- Crane or Load Handling Equipment”.
Added Paragraph 1.7.2.4 “Barge Mounted Mobile Crane Lift Plan”.
e. SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
Revised Paragraph 1.2 SUBMITTALS.
Added Paragraph 1.5 GOVERNMENT REMOVAL OF ACCESS LIGHTS.
Revised Paragraph 1.7 ACCESS TO WORK AREA.
Added Paragraph 1.11 WATER SURFACE ELEVATIONS.
Added Paragraph 1.12 BOAT TRANSPORTATION.
Added Paragraph 1.13 RADIO AND TELEPHONE COMMUNICATION.
Added Paragraph 1.14 FLOATING PLANT.
Added Paragraph 1.15 EVACUATION PLAN FOR BRZ WORK.
f. SECTION 03 01 00.01 28 CONCRETE SECTION ENLARGEMENT
Revised Paragraph 1.5.1 “General Requirements”.
g. SECTION 03 01 00.02 28 FORM AND PUMP PLACEMENT Revised Paragraph 3.6.1 “General Requirements”.
2. Revised the following Drawings (See clouded areas for revisions).
a. SHEET G-002.
b. SHEET S-301.
c. Added SHEET R-036.
3. Revised the following Clause:
a. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the dates listed below.
Spill for Juvenile Fish Passage: 10 April through 31 August, annually.
Anticipated Temporary Spillway Weir (TSW) Operation: 15 February through 15 June, and 1 October through 15 November, annually.
See SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS, paragraph SITE CONDITIONS AND OPERATIONAL RESTRICTIONS for additional information and restrictions.
(1) The Contractor shall complete all onsite work for the Powerhouse Intake Deck Concrete Beam Repair between 15 June and 11:59 p.m. 30 November 2021.
(2) Contractor vessels will not be allowed in in the forebay Boat Restricted Zone (BRZ) for access to Main Units 13 and 14 during TSW operation. See SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS, attachment “Boat Restricted Zone (BRZ) Policy” for additional information.
(3)Contractor will lose access to the work site between 12:01 a.m. 1 December 2021 through 11:59 p.m. 14 April 2022.
(4) The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (1) above.
(5) The Contractor shall complete the final, approved submission of the following by not later than 30 calendar days after completion of work in (1) above. See SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS for additional information:
a. As-Built drawings.
b. Shop Drawings.
c. Record Drawings.
(End of clause)
(End of Summary of Changes)