W912EF20R0004 Amend 0003.pdf

PDF 212 KB Posted

Attached to
Ice Harbor Gantry Crane Controls Upgrade Federal contract opportunity
Solicitation number
W912EF20R0004
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document provides details for a federal construction contract opportunity to upgrade controls for an intake gantry crane at Ice Harbor Dam in Washington state. The solicitation seeks a firm fixed-price contract between $1 million to $5 million to replace crane motors, controls, line conductor systems, consoles, hoists, shear blocks, and add fall protection features. The selected contractor must complete all work within a finite window from December 2020 to March 2021. Safety and quality requirements include developing accident prevention and CQC plans, providing on-site SSHO and fall protection competent persons, using QCS for documentation, and ensuring foreign national access is approved in advance. The solicitation will be posted to betaSAM in mid-February 2020 with proposals due approximately 30 days later. A site visit is scheduled for two weeks after solicitation release. The U.S. Army Corps of Engineers District in Walla Walla, Washington administers the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Ice Harbor Gantry Crane Controls Upgrade, newest first.
File Type Posted
Amendment 0007 W912EF20R0004.pdf PDF
Amendment 0006 TechSpecs 20R0004.pdf PDF
Amendment 0006 W912EF20R0004.pdf PDF
Amendment 0005 W912EF20R0004.pdf PDF
Amendment 0005 TechSpecs 20R0004.pdf PDF
W912EF20R0004 Amend 0004.pdf PDF
20R0004 Amend 0004 TechSpecs.pdf PDF
Amendment 0003 TechSpecs W912EF20R0004 .pdf PDF
Site Visit attendees 20R0004 HLD Gantry Crane Controls Upgrade.pdf PDF
Amendment 0002 TechSpecs 20R0004.pdf PDF
Amendment 0002 W912EF20R0004.pdf PDF
20R0004_Amend-0001_Plans.pdf PDF
Amendment 0001 W912EF20R0004.pdf PDF
2_20R0004_PLANS_Resource1.pdf PDF
1_20R0004_PLANS_Signed_1.pdf PDF
3_20R0004_PLANS_Resource2.pdf PDF
Solicitation W912EF20R0004.pdf PDF
20R0004 Tech Specs.pdf PDF
Site Visit Information W912EF20R0004.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the specif ications sections 01 55 10.00 28 and 41 01 20.17 26. Specif ication changes are marked w ith red line in margin. See "Summary of Changes".

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF20R0004

X 9B. DATED (SEE ITEM 11)

26-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION

NO.0003

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

CYNTHIA H JACOBSEN

201 N. THIRD AVE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF20R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0003

Summary of changes for Amend -0003 Ice Harbor Intake Gantry Crane Controls Upgrade

W912EF20R0004

1. Revised the following Specifications:

a. SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

• Added paragraph 1.13 AUXILIARY TROLLEY ASSEMBLY. Added pictures of auxiliary trolley assembly to end of this section.

b. SECTION 41 01 20.17 26 GANTRY CRANE MECHANICAL AND STRUCTURAL

REHABILITATION

• Revised paragraph 3.10 “DYNAMIC BALANCING OF MACHINERY” b. Replaced the word

“auxiliary” with “actuating”

(End of Summary of Changes)

File details come from the government source that posted it. Updated .